Title: MESISPE
1Manufacturing Execution System (MES) Global
Validation Roll out
ISPE/LASM Winnipeg, MB Arman Rais-Firouz 09-April
-2008
2Agenda
- MES Background
- Commissioning Validation
- Multiple Site Implementation
- Q A
3BACKGROUND
4Corporate Systems
Business Systems
ERP, E-Commerce
CRM LIMS, WMS, eDMS
Information Management Systems
MRP/II MES
Manufacturing Systems
Shop Floor Control Systems DCS, SCADA, Vision
Systems
5MES Integration - Processes
- Planning
- Order Management
- Manufacturing
- Inspection
- Material Movement/Warehousing
6Integrated Business Processes
7MES Integration - Systems
- Business system ERP, MRP
- Material Storage Movement WMS, ASRS, AGV
- Quality Inspection LIMS
- Shop floor control SCADA, DCS
- Other HR, BMS, eDMS, CAPA
8MES Integration - Equipment
- Equipment SCADA
- Mixers, Coaters, Dispensing,
- Scales
- Vision Systems
- Alarms and Events
9Application Modules
- Master Batch Record
- Master data
- Execution
- EBR, Weighing Dispensing, Material tracking,
WMS, Line Control - Quality Control
- Deviation Event Management, CAPA
- Monitoring and Optimization
- KPI
10Master Batch Records
Master Batch Records
- Basic Operation
- eg
- Manual Dispensing
- Automatic Dispensing
- Granulation
- Blending
- Compression
- Coating
- Sorting
- Inspection
Basic Function Dock Workroom release Completenes
s check Yield weighing Residual cleaning
Technical Function (SFO execution) Attributive Me
asuring Value Container Bundle Order
info Date Formula Etc.
11VALIDATION COMMISSIONING
12Validation Concept
13Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-end Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
14Validation Plan
- Description
- Scope
- Roles Responsibilities
- Applicable Regulations
- Methodology
- Project Plan
- Deliverables
- Quality Check Metrics
15Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-end Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
16Risk Assessment High Level
- Perform GxP/Part 11 assessment at system/Process
level - Limit the validation Scope to those processes
only - Use SISPQ as guideline for GxP Impact
- Safety,
- Identity,
- Strength,
- Purity,
- Quality
17Risk Assessment - Functional
- Perform functional level Risk Assessment to
determine level of testing for each function
(sub-process). - Determine combined risk factor for each by
Consider all the following risk factors - Regulatory Impact (GxP, SOX)
- Business Criticality
- Likelihood of Occurrence
- Detect-ability on Failure
- Severity of Consequence
18Risk Level - Testing Level
- RISK LEVEL
- Low
- Medium
- High
- TESTING CHALLENGE
- No Testing !!
- Positive Testing
- Negative Testing
- Null Testing
- Limit Testing
19Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-end Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
20IT Infrastructure
21Installation Qualification
- Infrastructure
- Data Centre
- Network (WAN, LAN, WLAN, RF)
- SAN
- Servers (any used for production and formal
testing) - Application Servers(s)
- Data Base Server(s)
- Desktop Clients
- Mobile terminals
- Printers
- Scanners
22Installation Qualification
- MES Applications
- Interfaces
- SCADA (Recipe Name, Start, Stop, .)
- ERP (Order Info, Lot No., Item Master, )
- WMS (Location, Movement)
- LIMS (Lot, sample ID, Status, )
- BMS (Room, Equipment, )
23Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-end Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
24Operation Qualification (OQ)
- Functional OQ based on FRS using Risk based
approach - Interface OQ (If interface is not available,
simulation is used) - Data Migration OQ (May be in different phases,
i.e. for PQ and for Go-Live) - Application Security OQ (User access, segregation
of duties, ERES)
25Acceptance Testing
- FAT Factory Acceptance Testing
- Unit level testing
- SAT Site Acceptance Testing
- Unit and Integration level testing
- UAT User Acceptance Testing
- Process level testing
26Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-2-End Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
27Performance Qualification (PQ)
- Pre go-live (PQ-1)
- End to end business process PQ
- Based on URS
- Stress testing
- Post go live monitoring (PQ-2)
- Time or order based monitoring of the system
- Allows for closure of open items at go-live
28Mapping of Test Activities
Test scripts Unit Integration1 Scenario2
Notes 1. Integration Test script Multiple
Unit Test Scripts 2. Scenario Test script
Multiple Integration Test Scripts
29MES Landscape Qualification Requirements
Production Instance
Testing Instance
Development Instance
IQ No Yes
Yes
OQ No Yes
No
PQ No No
Yes
Controlled Environment
30Deliverables
- Validation Plan
- Risk Assessment
- IQ (including Network)
- OQ
- GxP Functionalities
- Security
- Data Migration
- PQ
- Stress Testing
- End-end Business Process verification
- Pre/post go-live
- Document Management Procedure
- Project Change Management
- Configuration Management
- Cutover Plan
- Data Migration Plan
- User Access
- Post go-live support
- Disaster Recovery/BCP
- SOPs
31Cutover Considerations
- Plan well ahead (many months)
- Meet Demand
- Ramp down Business, (Close open items, Notify
customers) - Cutover Activities
- Go-Live
- Business Ramp up
32Cutover Planning
Go Live
Volume
E
B
D
C
A
TIME
A Current Business volume, B Business ramp up
(Stock pile) C Productivity Dip toward
shutdown, D Controlled Business ramp up, E
Stabilization
33MES VALIDATION Multiple Site Implementation
34Multiple Site Implementation
- Global Template
- You need standard processes
- Define a global core (common to all sites)
application template - Develop, test and qualify this common template
- URS, RA, FRS, DS, Global VP,
35Global Template Validation
Change control
URS and VP may be reversed
Global Validation Report(VR)
Global Validation Plan
Global BP Global URS
Performance Qualification(PQ2)
SOPs
Training records
PQ Not used for template
Supplier Audit/ Part 11 assessment
Functional Specification Global (FS)
Global PQ
Global OQ
Hardware Software Design and Configuration
Specification
Installation Qualification (IQ)
Good Programming Practice Software Source Code
Review
36Site Specific Model
Change control
URS and VP may be reversed
Global Validation Report(VR)
Local Validation Plan
Local URS
Performance Qualification(PQ2)
SOPs
Training records
Local Interim Validation Report
Local FS
Local PQ PQ
Local OQ
Local DS
Installation Qualification (IQ)
Good Programming Practice Software Source Code
Review
37Multiple Site Implementation
- Local site roll out
- Determine site requirements
- Plan and execute validation activities for local
features only (Do not need to test features that
were already validated and will not be changed) - Perform IQ
- OQ for Local features/enhancements that are
different from the core - PQ for local processes
38Electronic batch Record Paper Less
Master Batch Records
- Operation
- Manual Dispensing
- Automatic Dispensing
- Granulation
- Blending
- Compression
- Coating
- Sorting
- Inspection
Function Dock Workroom release Completeness
check Yield weighing Residual cleaning
Technical Function (SFO execution) Attributive Me
asuring Value Container Bundle Order
info Date Formula Etc.
39Challenges
- Multiple Equipment vendors Schedules
- Many Time dependencies
- Other systems may not be available for
interfacing (i.e. different project timeline,
go-live, etc) - Data Synchronization in ERP, LIMS, WMS, MES,
SCADA
40QUESTIONS ANSWERS