Title: SEWER DEPARTMENT FY 200809 BUDGET WORKSHOP


1
SEWER DEPARTMENTFY 2008/09 BUDGET WORKSHOP
  • April 9, 2008

2
SEWER DEPARTMENT Mission Statement
  • The mission of the Water and Sewer Department is
    to provide the highest possible water quality and
    customer service at the lowest possible cost,
    while continuing our commitment to improving the
    infrastructure and our communitys environment.

3
SEWER DEPARTMENT

FY 2008/09 Budget
SummaryExpenditures
  • Total Recommended Operating Budget - 6,222,121
  • Major factors influencing recommended operating
    costs
  • The combined Personal Services and Employee
    Benefits objects provide a 78,106 increase
    (3.4)
  • Increased cost of 6.5K in Professional
    Technical Services to include improved security
    to network computers also covers cost associated
    with Munis and other shared services
  • Electricity costs up 11K due to increased unit
    cost
  • Decreased natural gas cost by 13K due to less
    usage projected
  • Increased domestic water costs by 18K due to
    unit cost increase and adjusted usage projection
  • Sludge disposal fee from Sanitation Dept
    increased by 60K

4
SEWER DEPARTMENT

FY 2008/09 Budget
SummaryExpenditures (Continued)
  • Repairs to buildings decreased by 7.8K as HVAC
    work was completed in FY07/08
  • Unclassified services increased by 11K charges
    paid to other Towns for wastewater disposal
  • Energy up 10K due to unit cost increases of fuel
    oil
  • Chemicals up by 6.4K due to increased unit costs
  • Equipment repair materials up by 7K costs
    associated with keeping vital equipment running
    at an aging facility
  • Gasoline Diesel costs up by 8K due to unit
    costs
  • Nitrogen credits increased by 40K
    State-mandated program for nitrogen removal
  • Interfund Transfers decreased by 275K decrease
    in the use of retained earnings
  • Total Sewer Fund Budget decrease of 5,843

5
(No Transcript)
6
SEWER DEPARTMENT FY 2008/09 Budget Summary
Revenue
  • Total Recommended FY 2008/09 Revenue - 6,222,121
  • Major factors influencing revenues
  • Revenue from regular sewer service charges is
    estimated to be 4,538,980
  • This reflects a 8 rate increase and is based on
    a 5-year history of average usage
  • Economic downturn weather-related effects have
    resulted in revenue shortfalls when compared to
    MFS model predictions to reduce variables
    associated with these factors, a 5-year average
    was used
  • Revenues from Eighth Utilities District based on
    formula in District Agreement and values in
    recommended budget 935,079
  • Interest lien fees are 65K
  • Water Department usage for discharge is 277,200
  • Outlet charges of 40,000 reflect a decrease of
    approximately 183K in revenue from the FY2007/08
    Budget
  • MFS Cost Model anticipated 119 new connections
    actual number will be about 21
  • Use of Retained Earnings decreased by 264,513
  • Need to work our way up to the desired 180 days
    of operating reserve through multi-year rate
    adjustments
  • Remainder of revenue, 98,078 is derived from the
    following
  • Sludge (septage) disposal, repairs, review
    inspection, interest, rent, miscellaneous and
    assessments

7
SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Request Summary
  • Recommended Cash-Funded Capital Improvement
    Projects
  • 1. Vehicle Replacement
    55,000
  • 2. Manhole Rehabilitation
    30,000
  • 3. Public Works Projects
    7,500
  • 4. Raw Sewage Pump Rebuild 18,000
  • 5. Pump Station RTU Upgrade
    41,600
  • 6. Oversized Pipe
    20,000
  • 7. Roof Replacements
    115,000

  • Total 287,100
  • Note Original FY08/09 Request totaled 1.2M
    reduced by gt900K based on sewer priority
    list due to FY07/08 revenue shortfalls

8
SEWER DEPARTMENT FY 2008/09 Transfer to
Reserve Request SummaryMoved, Deleted or
Deferred Items
  • Project Name Amount Status
  • SSS Improvements 400,000 Reflected in
    note-funded
  • GIS Updates 9,000 Deferred
  • SCADA System Upgrade 184,400 Deferred
  • Sanitary Sewer Extensions 175,000 Deleted
  • Anoxic Tank Mixers 85,000 Deleted
  • Vehicle Replacement Engineering
    25,000 Deleted
  • Chlorine Building Modifications
    55,000 Deleted
  • Total request reduction 933,400

9
SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Justification Details
  • Vehicle Replacement - 55,000
  • Replace 1989 Stake Body Truck 450 with similar
    vehicle
  • Manhole Rehabilitation - 30,000
  • Annual contribution that will result in the
    rehabilitation of ten (10) manholes there are a
    total of approximately 3,200 system-wide
  • Public Works Projects - 7,500
  • This is the Sewer Departments share of the costs
    of projects that originate from the Public Works
    Department and/or the State of Connecticut
  • Raw Sewage Pump Rebuild - 18,000
  • In-house refurbishment of 18-year old main raw
    sewage pump

10
SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Justification Details
(Continued)
  • Pump Station RTU Upgrade - 41,600
  • Replace remote telemetry units (RTUs) at pump
    stations with Programmable Logic Controllers a
    more reliable and industry-standard methodology
    of control
  • Oversized Pipe - 20,000
  • Sewer Departments share of expense to
    reimbursement developers when we request they
    install larger lines than their project may
    require to benefit our future growth
  • Roof Replacements - 115,000
  • Replace deteriorated and leaking 18-year old
    roofs on Primary Treatment Building on Raw
    Sewage Pump Building to protect equipment
    facility

11
SEWER DEPARTMENT FY08/09 BUDGET
NOTE-FUNDED PROJECTS


12
SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Biosolids (Sludge) Design Total
Cost
  • Long-term biosolids disposal plan
    331,000
  • This is the cost of engineering services for the
    Preliminary Design Phase based on the
    evaluation performed by our consultant
  • Based on the (draft) biosolids study performed by
    our consultants alternate technologies will
    provide better and more cost-effective solutions
  • Age and condition of equipment structures
    necessitate these improvements
  • New improved technologies may provide a more
    efficient manner of biosolids handling than those
    previously considered
  • Anticipated closure of Town Landfill is also a
    significant factor
  • Once evaluation and preliminary design phases are
    complete, we will be able to define the long-term
    cost implications of the project

13
SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Denitrification Project
Total Cost
  • BNR Preliminary Design Facility Plan
    500,000
  • This is the cost of engineering services for the
    Preliminary Design Phase based on the BNR Study
    performed by a consultant
  • This also includes a comprehensive facility plan
    preliminary design
  • Based on the (draft) nutrient removal study
    performed by our consultants alternate
    technologies will provide better and more
    cost-effective solutions
  • Nitrogen credit program ends in 2014
  • Age and condition of equipment structures
    necessitate these improvements
  • New improved technologies, plus stricter
    effluent limitations are important driving
    factors as well
  • Once evaluation and preliminary design phases are
    complete, we will be able to define the cost
    implications of the project

14
SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Sanitary Sewer Improvement Program Total
Cost
  • Infrastructure Improvements
    1,500,000
  • This is the annual recommended allocation of
    funds to implement collection system pipe
    replacement lining based on the results of the
    Sewer System Evaluation Study (SSES)
  • The focus will be on sewer mains that are
    hydraulically deficient and/or have high inflow
    infiltration (I/I) rates
  • These lines are problematic as they may cause
    sewer backups, flooding, increase pumping
    processing costs, hydraulic overloads, organic
    under-loading, and create complex operating
    conditions that could jeopardize permit
    compliance
  • Long-term finance plan is to authorize 5M every
    three years (1.5M/1.5M/2.0M) through the sale
    of notes

15
SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Sanitary Sewer System Improvements Total
Cost
  • Devon Drive Project 250,000
  • This is to fund known problem areas that need
    immediate attention independent of the Sanitary
    Sewer Evaluation Study
  • This is the second phase of the Ridgewood Drive
    Pump Station Elimination Project
  • It will replace a problematic siphon line running
    beneath Bigelow Brook at the Parkade
  • Broad Street Streetscape Project
    150,000
  • This fund contributes to the replacement and
    relocation of the sewer lines necessitated by the
    Broad Streetscape Project

16
SEWER DEPARTMENT FY 2008/09 Budget Working
Capital Projections
  • Adopting a 8 rate adjustment in FY08/09 is
    consistent with the recommendation in the cost
    model derived from the MFS rate study and,
  • Continues a multi-year process of adjusting rates
    to cover future capital costs and,
  • Results in a smaller draw-down from reserves than
    FY07/08

17
SEWER DEPARTMENTFY 2008/09 BudgetRate
Comparisons
  • Sewer use cost based on average use of 2,200
    cubic feet/per quarter
  • Current usage rate is 2.74/HCF (Hundred Cubic
    Feet)
  • Manchesters average sewer use bill is currently
    60.28 per quarter or 241 per year this equates
    to 0.0037 per gallon
  • Calculation based on an 8 rate increase
    (2.96/HCF)
  • If recommended rate is adopted the average sewer
    use bill would be 65.12 per quarter or 260 per
    year this equates to 0.0039 per gallon
  • Based on a comparative analysis performed with
    data from 2005, the average sewer use cost was
    261 per year for a typical Connecticut homeowner
  • A new survey which is due out later this month
    estimates that the average annual homeowners
    sewer cost was 290 in 2007