Title: SEWER DEPARTMENT FY 200809 BUDGET WORKSHOP
1SEWER DEPARTMENTFY 2008/09 BUDGET WORKSHOP
2SEWER DEPARTMENT Mission Statement
- The mission of the Water and Sewer Department is
to provide the highest possible water quality and
customer service at the lowest possible cost,
while continuing our commitment to improving the
infrastructure and our communitys environment.
3SEWER DEPARTMENT
FY 2008/09 Budget
SummaryExpenditures
- Total Recommended Operating Budget - 6,222,121
- Major factors influencing recommended operating
costs - The combined Personal Services and Employee
Benefits objects provide a 78,106 increase
(3.4) - Increased cost of 6.5K in Professional
Technical Services to include improved security
to network computers also covers cost associated
with Munis and other shared services - Electricity costs up 11K due to increased unit
cost - Decreased natural gas cost by 13K due to less
usage projected - Increased domestic water costs by 18K due to
unit cost increase and adjusted usage projection - Sludge disposal fee from Sanitation Dept
increased by 60K
4SEWER DEPARTMENT
FY 2008/09 Budget
SummaryExpenditures (Continued)
- Repairs to buildings decreased by 7.8K as HVAC
work was completed in FY07/08 - Unclassified services increased by 11K charges
paid to other Towns for wastewater disposal - Energy up 10K due to unit cost increases of fuel
oil - Chemicals up by 6.4K due to increased unit costs
- Equipment repair materials up by 7K costs
associated with keeping vital equipment running
at an aging facility - Gasoline Diesel costs up by 8K due to unit
costs - Nitrogen credits increased by 40K
State-mandated program for nitrogen removal - Interfund Transfers decreased by 275K decrease
in the use of retained earnings - Total Sewer Fund Budget decrease of 5,843
5(No Transcript)
6SEWER DEPARTMENT FY 2008/09 Budget Summary
Revenue
- Total Recommended FY 2008/09 Revenue - 6,222,121
- Major factors influencing revenues
- Revenue from regular sewer service charges is
estimated to be 4,538,980 - This reflects a 8 rate increase and is based on
a 5-year history of average usage - Economic downturn weather-related effects have
resulted in revenue shortfalls when compared to
MFS model predictions to reduce variables
associated with these factors, a 5-year average
was used - Revenues from Eighth Utilities District based on
formula in District Agreement and values in
recommended budget 935,079 - Interest lien fees are 65K
- Water Department usage for discharge is 277,200
- Outlet charges of 40,000 reflect a decrease of
approximately 183K in revenue from the FY2007/08
Budget - MFS Cost Model anticipated 119 new connections
actual number will be about 21 - Use of Retained Earnings decreased by 264,513
- Need to work our way up to the desired 180 days
of operating reserve through multi-year rate
adjustments - Remainder of revenue, 98,078 is derived from the
following - Sludge (septage) disposal, repairs, review
inspection, interest, rent, miscellaneous and
assessments
7SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Request Summary
- Recommended Cash-Funded Capital Improvement
Projects - 1. Vehicle Replacement
55,000 - 2. Manhole Rehabilitation
30,000 - 3. Public Works Projects
7,500 - 4. Raw Sewage Pump Rebuild 18,000
- 5. Pump Station RTU Upgrade
41,600 - 6. Oversized Pipe
20,000 - 7. Roof Replacements
115,000 -
Total 287,100 - Note Original FY08/09 Request totaled 1.2M
reduced by gt900K based on sewer priority
list due to FY07/08 revenue shortfalls
8SEWER DEPARTMENT FY 2008/09 Transfer to
Reserve Request SummaryMoved, Deleted or
Deferred Items
- Project Name Amount Status
- SSS Improvements 400,000 Reflected in
note-funded - GIS Updates 9,000 Deferred
- SCADA System Upgrade 184,400 Deferred
- Sanitary Sewer Extensions 175,000 Deleted
- Anoxic Tank Mixers 85,000 Deleted
- Vehicle Replacement Engineering
25,000 Deleted - Chlorine Building Modifications
55,000 Deleted - Total request reduction 933,400
9SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Justification Details
- Vehicle Replacement - 55,000
- Replace 1989 Stake Body Truck 450 with similar
vehicle - Manhole Rehabilitation - 30,000
- Annual contribution that will result in the
rehabilitation of ten (10) manholes there are a
total of approximately 3,200 system-wide - Public Works Projects - 7,500
- This is the Sewer Departments share of the costs
of projects that originate from the Public Works
Department and/or the State of Connecticut - Raw Sewage Pump Rebuild - 18,000
- In-house refurbishment of 18-year old main raw
sewage pump -
10SEWER DEPARTMENT FY 2008/09 Recommended
Transfer to Reserve Justification Details
(Continued)
- Pump Station RTU Upgrade - 41,600
- Replace remote telemetry units (RTUs) at pump
stations with Programmable Logic Controllers a
more reliable and industry-standard methodology
of control - Oversized Pipe - 20,000
- Sewer Departments share of expense to
reimbursement developers when we request they
install larger lines than their project may
require to benefit our future growth - Roof Replacements - 115,000
- Replace deteriorated and leaking 18-year old
roofs on Primary Treatment Building on Raw
Sewage Pump Building to protect equipment
facility -
11SEWER DEPARTMENT FY08/09 BUDGET
NOTE-FUNDED PROJECTS
12SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Biosolids (Sludge) Design Total
Cost
- Long-term biosolids disposal plan
331,000 - This is the cost of engineering services for the
Preliminary Design Phase based on the
evaluation performed by our consultant - Based on the (draft) biosolids study performed by
our consultants alternate technologies will
provide better and more cost-effective solutions - Age and condition of equipment structures
necessitate these improvements - New improved technologies may provide a more
efficient manner of biosolids handling than those
previously considered - Anticipated closure of Town Landfill is also a
significant factor - Once evaluation and preliminary design phases are
complete, we will be able to define the long-term
cost implications of the project
13SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Denitrification Project
Total Cost
- BNR Preliminary Design Facility Plan
500,000 - This is the cost of engineering services for the
Preliminary Design Phase based on the BNR Study
performed by a consultant - This also includes a comprehensive facility plan
preliminary design - Based on the (draft) nutrient removal study
performed by our consultants alternate
technologies will provide better and more
cost-effective solutions - Nitrogen credit program ends in 2014
- Age and condition of equipment structures
necessitate these improvements - New improved technologies, plus stricter
effluent limitations are important driving
factors as well - Once evaluation and preliminary design phases are
complete, we will be able to define the cost
implications of the project
14SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Sanitary Sewer Improvement Program Total
Cost
- Infrastructure Improvements
1,500,000 - This is the annual recommended allocation of
funds to implement collection system pipe
replacement lining based on the results of the
Sewer System Evaluation Study (SSES) - The focus will be on sewer mains that are
hydraulically deficient and/or have high inflow
infiltration (I/I) rates - These lines are problematic as they may cause
sewer backups, flooding, increase pumping
processing costs, hydraulic overloads, organic
under-loading, and create complex operating
conditions that could jeopardize permit
compliance - Long-term finance plan is to authorize 5M every
three years (1.5M/1.5M/2.0M) through the sale
of notes
15SEWER DEPARTMENT FY 2008/09 Budget
Note-Funded Capital Projects Summary
Recommendations
Sanitary Sewer System Improvements Total
Cost
- Devon Drive Project 250,000
- This is to fund known problem areas that need
immediate attention independent of the Sanitary
Sewer Evaluation Study - This is the second phase of the Ridgewood Drive
Pump Station Elimination Project - It will replace a problematic siphon line running
beneath Bigelow Brook at the Parkade - Broad Street Streetscape Project
150,000 - This fund contributes to the replacement and
relocation of the sewer lines necessitated by the
Broad Streetscape Project
16SEWER DEPARTMENT FY 2008/09 Budget Working
Capital Projections
- Adopting a 8 rate adjustment in FY08/09 is
consistent with the recommendation in the cost
model derived from the MFS rate study and, - Continues a multi-year process of adjusting rates
to cover future capital costs and, - Results in a smaller draw-down from reserves than
FY07/08
17SEWER DEPARTMENTFY 2008/09 BudgetRate
Comparisons
- Sewer use cost based on average use of 2,200
cubic feet/per quarter - Current usage rate is 2.74/HCF (Hundred Cubic
Feet) - Manchesters average sewer use bill is currently
60.28 per quarter or 241 per year this equates
to 0.0037 per gallon - Calculation based on an 8 rate increase
(2.96/HCF) - If recommended rate is adopted the average sewer
use bill would be 65.12 per quarter or 260 per
year this equates to 0.0039 per gallon - Based on a comparative analysis performed with
data from 2005, the average sewer use cost was
261 per year for a typical Connecticut homeowner - A new survey which is due out later this month
estimates that the average annual homeowners
sewer cost was 290 in 2007