Title: Gulf of Mexico Working Group 11
1Gulf of Mexico Working Group - 11 CNS/WxA
Subgroup Minutes 6/30/2000
2GOMWG 11 CNSWxA Subgroup Minutes
- Subgroup Minutes
- - No changes to GOMWG-10 CNSWxA subgroup minutes
- - Minutes will continue to be distributed to the
entire GOMWG list - - GOMWG-11 minutes will include attached
presentations - Project List Individual Project Review
(Following Charts) - Strategic Plan Update and Program Plan
(Following Charts) - CNSWxA subgroup minutes distributed to GOMWG
distribution list - Meet with Helicopter Safety Advisory Council
(HSAC) on July 20
3Project List and Individual Project Review
- Updated CNSWxA Project List
- Reviewed New Project List and Made Assignments
- Project Completion Schedule
- - Mini-plan updates due 8/1
- - Package distributed to the working group
- - Review responses due back 8/20
- - Updated mini-plans available by GOMWG-12
4 CNSWxA Original Project List
5 CNSWxA Updated Project List
6Strategic Plan Update - Document Revision Plan
- Move color maps to an appendix generally not
republish maps - Without color maps, the remainder of the
document is portable and can easily be
reproduced - Create black and white 8 1/2 by 11 versions
of the maps to include - in the main document body
- Loose leaf binding to allow change page updates
- Currently planning November 00 publication
7Strategic Plan Update - High Level Document Review
Executive Summary - Plan to update to
reflect new document changes 1. 0 Introduction
- Update Project Lists Process Charts,
- Remove names from organization chart
- Aside Suggest that we add an acronyms list
(location TBD) 2.0 Gulf of Mexico
Requirements - Focus tends to be mission needs,
perhaps change chapter name - Update to reflect
FAAs new IRD - Make sure traceability exists
from mission need -gt Ops Con/Req -gt
Capabilities and solutions
8Strategic Plan Update - High Level Document Review
3. 0 - New section inserted - Shows traceability
from mission need -gt Ops Con/requirements -gt
Capabilities/Solution - Merges Airspace
Procedures with CNSWxA elements to show an
integrated strategy to achieve an operational
benefit - See attached En Route ideas (need to
develop offshore versions also) 4.0 -
Recommended CNSWxA Approach - The old section 3.0
renumbered - Suggestion that we identify
solution alternatives will be handled
in individual mini-plans 5.0 Recommended
Airspace and Procedures Approach - The old
section 4.0 renumbered - Update to include new A
P detail, per Brians presentation 6.0
Schedule and Cost Estimates - Revisit to reflect
any necessary updates
9Process
CNS and A P Building Blocks
C
Ops Concept/ Requirements
N
W
Hooray!!
S
A
A/P
Implemented Strategic Plan
Operational Benefit
10GOMEX Mission Needs
- Ensure that all aircraft are safely separated,
despite growing demand - Improve direct communication between
controller/aircraft - Improve direct communication between
international ATC facilities - Grant user preferred routes, altitudes and flight
times - Extend options to avoid adverse weather
conditions
11Operational Concept Traceability
Maps to the GOMEX operational concept
12En Route Capability Timeline - Draft
2000 2003 2006 2009
Near-Term Mid-Term
Long-Term
Capability
- Airspace Planning and Procedure Modification
- Required Vertical Separation Minimum
- Required Navigation Performance
- Additional Routes
- Additional Sectors
RNP-4
RNP-10
Additional Routes
J58
Sect 1
Sect 2
Sect 3
- Communications
- Buoy System
- Platform Communications
- CPDLC
1
Yearly Maintenance Cycle
4
3
2
Comm, ADS, Radar, Wx
Wx Comm
B 1/A
B 2
B n
- Navigation
- On-Board Avionics Upgrades
To Be Supplied
- Surveillance
- Platform Radars
- Automatic Dependent Surveillance
- Mexico radar data sharing
Radars
W Buoy
Plat/ C Buoy
E Buoy
Eng Study
- Weather
- Additional Weather Inputs
- Flight Information Services
To Be Supplied
- Automation
- Automated Interface
- Surveillance Improvements
- Conflict Probe
ADS-B
Auto Map
Eng Study
Full Deployment