Title: Gulf of Mexico Working Group 11


1
Gulf of Mexico Working Group - 11 CNS/WxA
Subgroup Minutes 6/30/2000
2
GOMWG 11 CNSWxA Subgroup Minutes
  • Subgroup Minutes
  • - No changes to GOMWG-10 CNSWxA subgroup minutes
  • - Minutes will continue to be distributed to the
    entire GOMWG list
  • - GOMWG-11 minutes will include attached
    presentations
  • Project List Individual Project Review
    (Following Charts)
  • Strategic Plan Update and Program Plan
    (Following Charts)
  • CNSWxA subgroup minutes distributed to GOMWG
    distribution list
  • Meet with Helicopter Safety Advisory Council
    (HSAC) on July 20

3
Project List and Individual Project Review
  • Updated CNSWxA Project List
  • Reviewed New Project List and Made Assignments
  • Project Completion Schedule
  • - Mini-plan updates due 8/1
  • - Package distributed to the working group
  • - Review responses due back 8/20
  • - Updated mini-plans available by GOMWG-12

4
CNSWxA Original Project List
5
CNSWxA Updated Project List
6
Strategic Plan Update - Document Revision Plan
  • Move color maps to an appendix generally not
    republish maps
  • Without color maps, the remainder of the
    document is portable and can easily be
    reproduced
  • Create black and white 8 1/2 by 11 versions
    of the maps to include
  • in the main document body
  • Loose leaf binding to allow change page updates
  • Currently planning November 00 publication

7
Strategic Plan Update - High Level Document Review
Executive Summary - Plan to update to
reflect new document changes 1. 0 Introduction
- Update Project Lists Process Charts,
- Remove names from organization chart
- Aside Suggest that we add an acronyms list
(location TBD) 2.0 Gulf of Mexico
Requirements - Focus tends to be mission needs,
perhaps change chapter name - Update to reflect
FAAs new IRD - Make sure traceability exists
from mission need -gt Ops Con/Req -gt
Capabilities and solutions
8
Strategic Plan Update - High Level Document Review
3. 0 - New section inserted - Shows traceability
from mission need -gt Ops Con/requirements -gt
Capabilities/Solution - Merges Airspace
Procedures with CNSWxA elements to show an
integrated strategy to achieve an operational
benefit - See attached En Route ideas (need to
develop offshore versions also) 4.0 -
Recommended CNSWxA Approach - The old section 3.0
renumbered - Suggestion that we identify
solution alternatives will be handled
in individual mini-plans 5.0 Recommended
Airspace and Procedures Approach - The old
section 4.0 renumbered - Update to include new A
P detail, per Brians presentation 6.0
Schedule and Cost Estimates - Revisit to reflect
any necessary updates
9
Process
CNS and A P Building Blocks
C
Ops Concept/ Requirements
N
W
Hooray!!
S
A
A/P
Implemented Strategic Plan
Operational Benefit
10
GOMEX Mission Needs
  • Ensure that all aircraft are safely separated,
    despite growing demand
  • Improve direct communication between
    controller/aircraft
  • Improve direct communication between
    international ATC facilities
  • Grant user preferred routes, altitudes and flight
    times
  • Extend options to avoid adverse weather
    conditions

11
Operational Concept Traceability
Maps to the GOMEX operational concept
12
En Route Capability Timeline - Draft
2000 2003 2006 2009
Near-Term Mid-Term
Long-Term
Capability
  • Airspace Planning and Procedure Modification
  • Required Vertical Separation Minimum
  • Required Navigation Performance
  • Additional Routes
  • Additional Sectors

RNP-4
RNP-10
Additional Routes
J58
Sect 1
Sect 2
Sect 3
  • Communications
  • Buoy System
  • Platform Communications
  • CPDLC

1
Yearly Maintenance Cycle
4
3
2
Comm, ADS, Radar, Wx
Wx Comm
B 1/A
B 2
B n
  • Navigation
  • On-Board Avionics Upgrades

To Be Supplied
  • Surveillance
  • Platform Radars
  • Automatic Dependent Surveillance
  • Mexico radar data sharing

Radars
W Buoy
Plat/ C Buoy
E Buoy
Eng Study
  • Weather
  • Additional Weather Inputs
  • Flight Information Services

To Be Supplied
  • Automation
  • Automated Interface
  • Surveillance Improvements
  • Conflict Probe

ADS-B
Auto Map
Eng Study
Full Deployment