USACE GEEZER BRIEF 2001 - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

USACE GEEZER BRIEF 2001

Description:

Currently 266 continuing contracts with a total contract amount of $2 bil ... Sims Bayou. Columbia River Fish Mitigation. Environmental. Oakland Harbor. Flood ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 25
Provided by: ellenn
Category:
Tags: brief | geezer | usace

less

Transcript and Presenter's Notes

Title: USACE GEEZER BRIEF 2001


1
What's Up in Washington?
FY06 Execution FY07 Budget
Presentation to National Waterways Conference 8
March 2006
2
Outline
  • FY 2006 Execution Issues
  • FY 2007 Budget
  • Possible Future Changes

3
FY06 Appropriations Execution
  • FY 06 E WD Act (PL 109-103) Directions
  • Execute the appropriated program
  • Retain funds on projects appropriated
  • Continuing Contracts
  • Reprogramming
  • Funds Use Trends

4
FY06Continuing Contracts
  • Issue Obligating Congress to future year
    appropriations.
  • Currently 266 continuing contracts with a total
    contract amount of 2 bil
  • FY 0607 amount is 1.5 bil therefore most
    contract obligations occur in first 2 FYs
  • FY 07-11 total future year obligation
    commitment is 1.1 bil
  • Only 26 contracts gt 20 mil account for 92 of
    all future year obligations
  • Futuremaybe fully fund all contracts lt20 mil?
  • FY06 to date 4 approved 3 disapproved

5
FY 06 Reprogramming
  • Issue Too much reprogramming funding projects
    through reprogramming contrary to Congressional
    intent in the Act/Conference Report
  • Act Language Limits
  • Sections 101(a)(1)-(a)(4) (cannot create,
    eliminate, increase, or change the purpose of a
    project, program or activity)
  • Approval Limits-50 of project base amount or 2
    mil.
  • ProcessDistrict/DivHQs/ASA/OMB/Congress
  • Emerging Rules
  • Approval process is problematical at this point

6
FY 06 Reprogramming Trends
  • Substantial Reductions
  • Issue Too much reprogramming funding projects
    contrary to Congressional Intent
  • FY03-04 GAO Report. 7,000 reprogrammings valued
    at 2.1 bil on 60 of CW projects
  • FY05 1,476 projects impacted by reprogrammings
  • FY06 to date 54 reprogrammings valued at 37.8
    mil on 122 projects
  • FY06 projected reprogramming gt2 mil/50 41
    projects need 96 mil from about 25 source
    projects
  • 32 of 41 projects for 77 mil are restoration
    commitments
  • Approval process is problematical at this point

7
One Outcome of FY06 DirectionFunds Utilization
Trends FY06 -FY 06 Scheduled Carryover ( 000)
  • GI CG OM Total
  • Total Available 208,082 3,025,810 2,628,384 5,862
    ,276
  • Total Obligated 12,195 387,241 78,210 477,646
  • Act Language 3,232 94,434 8,562 106,228
  • Congressional Adds 9,806 165,170 9,869 184,844
  • To Fully Fund Contracts 209 16,894 1,256 18,359
  • To Complete Projects 1,328 21,854 551 23,733
  • Insufficient Cost-Shared Funds 785 19,899 13,366 3
    4,050
  • Other 2,853 27,392 22,297 52,542
  • Total Unobligated 18,212 345,643 55,902 419,757
  • Total Carryover 30,407 732,884 134,112 897,402

8
FY07 Civil Works Budget
  • Supports the Presidents overall budget
    priorities to
  • Continue long-term economic growth
  • Rebuild and recover the Gulf Coast
  • Win the Global War on Terrorism
  • Secure the Homeland

9
FY 2007 Budget
  • Emphasizes 3 activities
  • Construction/completion of projects in commercial
    navigation, flood/storm damage reduction, and
    aquatic ecosystem restoration
  • Regulatory program
  • Emergency preparedness and response mission
  • Corps focus
  • Maintenance of critical infrastructure
  • Funding high return studies and construction
    projects
  • Continuing best ongoing planning and construction
    within available funds

10
Civil Works Budget Appropriations History (
Millions)
  • FY05 FY05 Total FY06 FY06 Total FY07
  • Budget Approp. Budget Approp. Budget
  • Construction, Gen. 1,437 1,796 1,637 2,348 1,555
  • Oper. Maint., Gen. 1,934 1,959 1,979 1,969 2,258
  • Gen. Investigations 90 145 95 162 94
  • Mississippi R. Tribs. 270 325 270 396 278
  • Regulatory 150 145 160 158 173
  • Flood Coast Emerg. 50 0 70 0 81
  • FUSRAP 140 165 140 139 130
  • Gen. Expenses 167 167 162 152 164
  • OASA(CW) 0 4 0 4 0
  • Total 4,238 4,705 4,513 5,329 4,733
  • Does not include 4.3 billion in two
    Emergency Supplementals for 4 storms
  • Administration has requested additional 1.5
    billion in Emergency Supplemental to strengthen
    New Orleans Levees
  • Does not include 4.4 billion (FY0506) FEMA
    reimbursable hurricane recovery work.

11
Performance Based Budgeting Which Projects Make
the Cut?
  • Priorities
  • High Risk Dam Safety
  • High Performing, Completing
  • Very High Performing
  • RBRCRgt4
  • National Priorities
  • High Performing
  • RBRCR 3-4
  • Cost Effective Restoration of National or
    Regional Significant Species

12
FY 07 Budget National Priority Projects
Columbia River Fish Mitigation
Missouri River Fish Wildlife Mitigation
  • New York-New Jersey Harbor

Upper Miss.R. Side Channel Restoration
  • Oakland Harbor

Olmsted Lock Dam
Sims Bayou
Navigation
Flood Damage Reduction
  • Comprehensive
  • Everglades
  • Restoration

Environmental
13
Performance Based Budgeting Modifications for
FY07Other Metrics and Considerations
  • Construction
  • Flood Damage Reduction
  • People in 100-year flood plain
  • Average annual damages prevented
  • Property at risk in 100-year floodplain
  • Navigation
  • Tonnage
  • Average Annual Benefits
  • Remedy impacts from existing Civil Works projects
  • Environmental Restoration
  • Loss prevention for significant natural resources
  • Endangered Species Act other environmental
    compliance needs
  • Unique Expertise in modifying Aquatic Regimes
  • Planning/Design
  • High Likelihood of Sponsor Support
  • RBRCRs gt4

14
What is not in the FY07 Budget?
  • 532 Studies and Projects funded in the FY06
    Appropriation

15
FY07 and BeyondChanges Made and to Come
  • Washington Focus
  • DEVELOP THE BUDGET
  • DEFEND THE BUDGET
  • Execute the Appropriation
  • Delegate more authorities to field
  • Contracting authorities
  • Reprogramming
  • Stabilize Funds
  • Fully fund more contracts
  • Budget contracts to completion
  • Reprogram only as appropriate

16
FY07 and BeyondMore Changes
  • Understand consequences of Performance Based
    Budgeting
  • Seek a better balance between budgeting by
    business line and budgeting by project
  • Reassess Commanders role in establishing
    watershed and project priorities
  • Pilot budget presentation by system/watershed
  • Ohio River System?
  • Execution handoff to field with more delegation
    and flexibility
  • Seek to reduce gap between Administration Budget
    and Congressional Appropriation

17
What Else Should Change?
  • Premise (Mine) This nation must reassess the
    budget priority it gives to infrastructure
    investments

18
Communication
  • Communicate that funding infrastructure is an
    investmentreturns exceed costs
  • Communicate that infrastructure is important
  • To the National Defense
  • To the Economy
  • To the Quality of All Life
  • Communicate that infrastructure is integrated

19
Questions?
20
Five-Year Development Plan
  • Provides an overview of the Civil Works program
    and budget for FY 2007-2011
  • A collaborative effort between the Corps, OMB and
    the Committees.
  • Presents projections of discretionary funding for
    the Civil Works program
  • Focus on projects and activities that provide the
    highest net economic/environmental returns on the
    Nations investment
  • Approved and submitted to the Congress on 1 Mar 06

21
Five-Year Development Plan
  • The funding is distributed among eight accounts
    over the five-years Investigations,
    Construction, Operations and Maintenance, MRT,
    the Regulatory Program, FUSRAP, Flood Control and
    Coastal Emergencies (FCCE) and Expenses
  • The plan includes three scenarios
  • Middle scenario Based on the Presidents budget
    (4.733 billion) and are formula driven funding
    levels through the out-years
  • High scenario Based on the total FY 2006
    enacted funding level (5.446 billion) as the
    base and adjusted over time for GDP price index
  • Low scenario Based on funding levels below
    those in the Middle scenario
  • The budget projections are formula-driven/policy
    neutral and do not represent budget
    decisions/policy beyond FY 2007

22
Five-Year Development Plan
  • Each scenario presents out-year budget
    allocations based on FY07 Administration
    assumptions and construction guidelines
  • A funding wedge is accounted on each scenario to
    fund those studies, PEDs and construction
    projects not listed
  • Under the High scenario
  • The performs substantially more critical
    maintenance, repair and rehabilitation (445
    million increase in OM and 13 million for MRT)
  • More studies, PEDs and projects are completed
    faster than the other two scenarios
  • The Corps executes more critical and high
    priority items

23
Five-Year Development Plan
24
Questions?
Write a Comment
User Comments (0)
About PowerShow.com