Description:

This product has a 486 day lifespan and the demand continues to be random ... Once the market has matured on day 150, a bank is extending a line of credit to ... – PowerPoint PPT presentation

Number of Views:852
Avg rating:3.0/5.0
Slides: 12
Provided by: CUSI
Category:

less

Transcript and Presenter's Notes

Title: Managing Customer Responsiveness at Littlefield Technologies with Debt and LotSizing Policies


1
Managing Customer Responsiveness at Littlefield
Technologies with Debt and Lot-Sizing Policies

Dr. Ahmad Syamil, CPIM, CIRM
2
Background
  • Littlefield Technologies (LT) has developed
    another DSS product
  • The new product is manufactured using the same
    process as the product in the previous assignment
  • The LT factory began production by investing most
    of its cash into capacity and inventory

3
Background
  • On day 0, the factory began operations with 3
    stuffers, 2 testers, and 1 tuner, and a raw
    materials inventory of 9600 kits
  • This left the factory with zero cash on hand
  • This product has a 486 day lifespan and the
    demand continues to be random
  • Demand will end abruptly at the end of this
    lifespan
  • Management is quoting 7-day lead times but would
    like to charge higher prices for shorter lead
    times

4
Operations Policies at Littlefield
  • LT uses a Reorder Point/Order Quantity raw
    material purchase policy
  • Raw kits are purchased as soon as the following
    is met
  • The inventory of raw kits is less than the
    reorder point
  • There are no orders for raw kits currently
    outstanding
  • The factory has sufficient cash to purchase the
    reorder quantity

5
Operations Policies at Littlefield
  • Kits are purchased in multiples of 60 because
    orders arrive in batches of 60
  • A reliable suppliers delivers exactly 4 days
    after order is placed and paid for
  • The current reorder point and reorder quantity
    can be changed by clicking on Edit Data on the
    Materials Buffer icon

6
Operations Policies at Littlefield
  • Currently (as in the first assignment) the
    factory releases orders into the factory in
    processing lots of 60 receivers
  • However, in this assignment, you may split the
    incoming orders into smaller processing lots as
    they are released into the factory
  • 1 lot of 60, 2 lots of 30, 3 lots of 20, and so on

7
Operations Policies at Littlefield
  • Customers pay a premium for fast lead times
  • Price 1 750 quoted lead time 7 days maximum
    lead time 14 days
  • Price 2 1000 quoted lead time 1 day maximum
    lead time 2 days
  • Price 3 1250 quoted lead time 0.5 days
    maximum lead time 1 days

8
Operations Policies at Littlefield
  • Once the market has matured on day 150, a bank is
    extending a line of credit to LT at 20 annual
    interest
  • In addition, a processing fee of 5 in incurred
    right after the loan is received

9
Assignment
  • The factory has been running for 50 simulated
    days, and management has recalled the
    high-powered operations team (you) to manage the
    capacity, scheduling, purchasing, lot sizing, and
    contract quotations to maximize the cash
    generated by the factory over its lifetime
  • You will have control from day 50 to 386
  • One hour per simulated day translates into 14
    real days

10
Assignment
  • At day 386, you lose control of the factory, and
    the simulation will quickly run another 100 days
  • After day 486, you can check your status but the
    factory will no longer be running
  • Team scores are based on cash balance which is
    cash on hand minus debt

11
Assignment
  • Your team should turn in one summary of what
    actions you took during the 2 weeks you had
    access to the factory, why you took those
    actions, and in retrospect whether you think you
    did the right thing
  • Show analysis to justify your conclusions
  • Your grade is partially based on performance but
    mostly based on summary
  • The summary cannot exceed 4 pages in length. The
    game manual from Stanford University does not ask
    you to submit any appendices. However, please
    attach the overall standing, the transaction
    history, and the cash statement that you can get
    from the game website.