EVACUATION PROJECT - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

EVACUATION PROJECT

Description:

Remote controlled variable message reader boards-fixed & trailer mounted. WIRELESS CAMERAS ... Location of variable message reader boards (fixed 55 signs) ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 23
Provided by: maureen92
Category:

less

Transcript and Presenter's Notes

Title: EVACUATION PROJECT


1
(No Transcript)
2
EVACUATION PROJECT
  • STATUS REPORT
  • Presented by
  • Casey Beard
  • Morrow County Emergency Management

3
  • Lessons Learned
  • Shelter in place remains our primary protective
    action.
  • Evacuation is easy to say, hard to do!
  • Our original plan with multi-unidirectional
    outbound routes appears to be the correct
    approach.
  • Our approach to protecting special populations
    appears appropriate

4
UMATILLA COMMUNITY EVACUATION SYSTEM
  • Emphasizes use of advanced technologies to
    supplement personnel shortages and short
    timelines
  • Maximizes use of limited available funds to
    protect the public
  • Protects motoring public as well as providing
    general evacuation options

5
EVACUATION ROUTES
6
PROPOSED SIGNAL UPGRADE
CCTV WITH WI-FI
ELM AVENUE IMPROVEMENTS/SIGNAL UPGRADES
MAJOR HWY/FREEWAY BOTTLENECKS
  • MORROW/UMATILLA COUNTIES - CSEPP

7
USE OF TECHNOLOGY
  • Linked, computer controlled traffic signals
  • Wireless cameras monitor critical intersections
  • Remote controlled drop arm barricades
  • Remote controlled variable message reader
    boards-fixed trailer mounted

8
WIRELESS CAMERAS
  • Boardman Water Tower
  • Port of Morrow Exit

9
FIXED SIGNS
  • Technology is augmented by fixed signs marking
    evacuation routes (200 signs)

10
OVERVIEW OF SYSTEM
  • Location of cameras
  • Location of drop arm barricades (16 barricades)
  • Location of variable message reader boards (fixed
    55 signs)
  • Location of static signs

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
EVACUATION PLAN
  • Annex G
  • Checklist
  • Plans without practice or resources are wasted
    paper

16
INVOLVING THE CSEPP COMMUNITY IN THE PLANNING
PROCESS
  • Have held community level meetings (Jul 20 and
    Sep 29--next one is scheduled for Nov 10)
  • Addressing, in detail special needs, special
    events, public information support, reception
    center/mass care facilities, and coordinaton with
    the State of Washington

17
SPECIAL POPULATIONS
  • Need to be addressed in the Evacuation Plan
  • Our strategy for protecting special populations
    with enhanced shelter options is appropriate for
    a CSEPP event
  • Institutional applications

18
Umatilla County Fairgrounds
19
INDIVIDUALS WITH SPECIAL NEEDS
20
PROJECT SUMMARY
  • All foundation work completed (signs, reader
    boards, drop arm barricades)
  • Most components delivered
  • Operational test scheduled within 3 weeks
  • Full-scale installation will begin after
    operational test assessment
  • Currently project is on budget and schedule for
    February, 2006 completion

21
REMAINING ISSUES
  • Should we revisit decision not to fund Phase III
    creation of uni-directional outbound routes
  • Public education campaign

22