SEWER PROJECT AREAS - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

SEWER PROJECT AREAS

Description:

CROSS STREET/FOREST HILL DRIVE SEWER CONTRACT AREA ... Main St. area, or the Rogers Brook area, your betterment will increase by an estimated 8.5 ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 10
Provided by: stevenb5
Category:
Tags: areas | project | sewer

less

Transcript and Presenter's Notes

Title: SEWER PROJECT AREAS


1
SEWER PROJECT AREAS
CROSS STREET/FOREST HILL DRIVE SEWER CONTRACT AREA
ROUTE 495
ROUTE 93
ROGERS BROOK BALLARDVALE SEWER CONTRACT AREAS
2
ROGERS BROOK BALLARDVALE SEWER CONTRACTS
Legend
Pump Station
Beneath Street Cross Country Force Main
Road Water Parcels
Contract Boundary Number
SEWERAGE 168,850 FEET (32.0 MILES) 1,330 UNITS
3
CROSS STREET/FOREST HILL DRIVE SEWER CONTRACT
SEWERAGE 36,000 FEET (6.8 MILES) 236 UNITS
Note Articles 9 and 13 are from Fiscal Year
2000.
4
Septic System Failures Continued Use Permits
Failures With Repair/Replacement
Failures With Continued Use Permits
5
APPROPRIATIONS TO DATE So. Main St./Ballardvale
Rd. Rogers Brook Areas
  • 22,500,000 WA 41 1999 ATM
  • So. Main St./Ballardvale Rd. Area
  • 4,300,000 WA 42 1999 ATM
  • _________ Rogers Brook Area
  • 26,800,000
  • 1,250,000 WA 35 2004 ATM
  • Supplemental Approp. Shawsheen
  • _________ Intercepter Rogers Brook Area
  • 28,050,000 TOTAL APPROPRIATION

6
SUMMARY OF APPROPRIATIONS ADDITIONAL COSTS
  • Original Appropriations
  • 22,500,000 Art. 41-1999 ATM
  • 4,300,000 Art. 42-1999 ATM
  • Additional Costs
  • 1,055,000 Shawsheen Interceptor
  • 510,000 So. Main St. Paving
  • 903,000 Traffic Details
  • 305,000 Easements
  • 302,000 Additional Restoration
  • 98,000 Engineering
  • 402,000 Additional Construction Costs
  • 175,000 Contract 4 Contingency
  • 3,750,000
  • 1,250,000 Art. 35-2004 ATM Supplemental Bond
    Authorization
  • 2,500,000 Art. 2-2004 STM Supplemental Bond
    Authorization

7
WHAT HAS CHANGED?
  • State Mandates
  • Shawsheen Intercepter Sewer Replacement
  • DEP E.I.S Process Ipswich River Watershed
    Council (R.B./Contract IV)
  • Mass Highway Dept. Additional Paving Requirements
    (Rte. 28 Main St.)
  • Physical Conditions
  • Encountered More Ledge/Rock Than Anticipated
  • Time Delays
  • No. Reading/Andover Water Sale Agreement (2000
    ATM)
  • Rogers Brook Sewer Redesign for Spotted Turtles
  • Adjusted Phasing to Accommodate New Schools in
    West Andover
  • Re-bid Contract 2 Due to Town Required Design
    Change
  • Local Factors
  • More Streets Closed and Detours than Originally
    Anticipated (Sch. Buses)
  • Closure and Detour of Main Street Required
    Additional Details
  • Negotiated Easements
  • Additional Restoration Work

8
ATM ACTIONS
  • 99 ATM 41 Construction Auth. 22.5 million
  • 99 ATM 42 Construction Auth. 4.3 million
  • 00 ATM 44 Andover/No. Reading Water
    Agreement
  • 02 ATM 56 Sewer Easement Through C.C. Land
  • 04 ATM 35 Supplemental Auth. 1.25 million
  • 04 STM 2 Supplemental Auth. 2.5 million

9
WHAT IS THE IMPACT TO THE PROPERTY OWNER?
  • Betterments 2/3rds Cost
  • A. If you live in the Ballardvale St./So. Main
    St. area, or the Rogers Brook area, your
    betterment will increase by an estimated 8.5
  • B. If you do not live in those sewer areas,
    then you will not be impacted by the betterment
    increase.
  • 2. Sewer Rate 1/3rd Cost
  • A. All sewer users will be impacted by a
    minimal sewer rate increase of approximately
    5.00 per year.
  • If there is no sewer service in your
    neighborhood, then
  • there is no impact to you.