1SEWER PROJECT AREAS
CROSS STREET/FOREST HILL DRIVE SEWER CONTRACT AREA
ROUTE 495
ROUTE 93
ROGERS BROOK BALLARDVALE SEWER CONTRACT AREAS
2ROGERS BROOK BALLARDVALE SEWER CONTRACTS
Legend
Pump Station
Beneath Street Cross Country Force Main
Road Water Parcels
Contract Boundary Number
SEWERAGE 168,850 FEET (32.0 MILES) 1,330 UNITS
3CROSS STREET/FOREST HILL DRIVE SEWER CONTRACT
SEWERAGE 36,000 FEET (6.8 MILES) 236 UNITS
Note Articles 9 and 13 are from Fiscal Year
2000.
4Septic System Failures Continued Use Permits
Failures With Repair/Replacement
Failures With Continued Use Permits
5APPROPRIATIONS TO DATE So. Main St./Ballardvale
Rd. Rogers Brook Areas
- 22,500,000 WA 41 1999 ATM
- So. Main St./Ballardvale Rd. Area
- 4,300,000 WA 42 1999 ATM
- _________ Rogers Brook Area
- 26,800,000
- 1,250,000 WA 35 2004 ATM
- Supplemental Approp. Shawsheen
- _________ Intercepter Rogers Brook Area
- 28,050,000 TOTAL APPROPRIATION
6SUMMARY OF APPROPRIATIONS ADDITIONAL COSTS
- Original Appropriations
- 22,500,000 Art. 41-1999 ATM
- 4,300,000 Art. 42-1999 ATM
- Additional Costs
- 1,055,000 Shawsheen Interceptor
- 510,000 So. Main St. Paving
- 903,000 Traffic Details
- 305,000 Easements
- 302,000 Additional Restoration
- 98,000 Engineering
- 402,000 Additional Construction Costs
- 175,000 Contract 4 Contingency
- 3,750,000
- 1,250,000 Art. 35-2004 ATM Supplemental Bond
Authorization - 2,500,000 Art. 2-2004 STM Supplemental Bond
Authorization
7WHAT HAS CHANGED?
- State Mandates
- Shawsheen Intercepter Sewer Replacement
- DEP E.I.S Process Ipswich River Watershed
Council (R.B./Contract IV) - Mass Highway Dept. Additional Paving Requirements
(Rte. 28 Main St.) - Physical Conditions
- Encountered More Ledge/Rock Than Anticipated
- Time Delays
- No. Reading/Andover Water Sale Agreement (2000
ATM) - Rogers Brook Sewer Redesign for Spotted Turtles
- Adjusted Phasing to Accommodate New Schools in
West Andover - Re-bid Contract 2 Due to Town Required Design
Change - Local Factors
- More Streets Closed and Detours than Originally
Anticipated (Sch. Buses) - Closure and Detour of Main Street Required
Additional Details - Negotiated Easements
- Additional Restoration Work
8ATM ACTIONS
- 99 ATM 41 Construction Auth. 22.5 million
- 99 ATM 42 Construction Auth. 4.3 million
- 00 ATM 44 Andover/No. Reading Water
Agreement - 02 ATM 56 Sewer Easement Through C.C. Land
- 04 ATM 35 Supplemental Auth. 1.25 million
- 04 STM 2 Supplemental Auth. 2.5 million
9WHAT IS THE IMPACT TO THE PROPERTY OWNER?
- Betterments 2/3rds Cost
- A. If you live in the Ballardvale St./So. Main
St. area, or the Rogers Brook area, your
betterment will increase by an estimated 8.5 - B. If you do not live in those sewer areas,
then you will not be impacted by the betterment
increase. - 2. Sewer Rate 1/3rd Cost
- A. All sewer users will be impacted by a
minimal sewer rate increase of approximately
5.00 per year. - If there is no sewer service in your
neighborhood, then - there is no impact to you.