Title: RTCA SC206 first meeting Washington DC, July 2005


1
RTCA SC-206 first meetingWashington DC, July 2005
  • EUROCAE
  • Methodology Presentation
  • for Air Traffic Services supported by Data/Link

2
Presentation of ED-78 MethodologyWhy does
EUROCAE recommend this methodology
  • EUROCAE/WG53 and RTCA SC-189 published
    Guidelines for Approval of the Provision and Use
    of Air Traffic Services Supported by Data
    Communications (ED-78 / DO-264)
  • It provides an internationally recognised
    methodology to address operational implementation
    of Data Link services
  • This methodology has been successfully used to
    develop ED-120 (air traffic data-link service in
    continental airspace)
  • EUROCAE requests that the development of the new
    AIS data-link documents is carried out based on
    this methodology

3
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Approved system
element
Operations
Development
Qualification
. Procedures)
data
data
data
integration test data
4
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
  • Define the service
  • and
  • high level specification

Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Approved system
element
Operations
Development
Qualification
. Procedures)
data
data
data
integration test data
5
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
  • Develop and
  • test the services

standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Approved system
element
Operations
Development
Qualification
. Procedures)
data
data
data
integration test data
6
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
  • Ensure that what is
  • developed is compliant
  • with requirements

MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Approved system
element
Operations
Development
Qualification
. Procedures)
data
data
data
integration test data
7
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
Entry into service corresponds to the
initial real scale operational trial
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Operations
Development
Qualification
data
data
data
8
Operational feedback stabilises the
requirements and implementation
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Operations
Development
Qualification
data
data
data
9
Presentation of ED-78 Methodology
Coordinated Requirements Determination
Integration
qualification
data
OSED
MOPS
Once stabilised, the service is put into
operation
MASPS
Requirements
SPR
INTEROP
SPR standard
Feedback
standard
Guidance
Entry into service
Material
Operational, Safety,
Interoperability
(Coordinated)
Performance Requirements
Requirements
Planning
Objectives
data
Entry into
guidelines
Feedback
service data
for evidence
ATS provider operational approval
NOTAM
Aircraft type design approval
Integration
Operator operational approval
qualification
Operations
Planning, Development Qualification
data
Approval Plan
Accomplishment
Summary
Operations
Development
Qualification
data
data
data
10
Presentation of ED-78 Methodology
  • Covered topics
  • End to End issues
  • Regulatory objectives
  • Operational objectives
  • Actors
  • Airlines
  • ATS Providers
  • Communication Service Providers
  • Airframe / Equipment manufacturers
  • Airworthiness authorities
  • Operational authorities

11
Presentation of ED-78 Methodology
  • ED-78 / DO-264 provides both methodology and
    guidance and templates for the following
  • OSED (Operational Service and Environment
    Definition)
  • SPR (Safety Performance Requirements)
  • INTEROP (Interoperability Document)
  • These elements are supported by
  • OSA (Operational Safety Assessment)
  • OPA (Operational Performance Assessment)
  • IA (Interoperability Assessment)
  • OSEIC (Operational Services and Environment
    Information Capture)

12
Presentation of ED-78 Methodology
  • OSEIC Process
  • Captures the operational objectives of the
    airspace users and ATS provider
  • All stakeholders participate
  • Information captured during OSEIC (OSED) is
    assessed and extended by OSA, OPA, IA processes
  • OSA, OPA, IA processes
  • Identify requirements
  • co-ordinate requirements (ensure correct
    integration into OSED, SPR, INTEROP)
  • Allocate requirements to stakeholders
  • Validate requirements (necessary and sufficient
    for operational implementation)

13
Presentation of ED-78 Methodology
  • OSED
  • OSED is used as the basis for assessing and
    establishing operational, safety, performance,
    and interoperability requirements
  • It includes
  • a service description
  • an environment description
  • defined from
  • selected services
  • intended operational environment
  • operational performance expectations
  • selected functions
  • selected technologies
  • Produced by OSEIC process for initial OSED

14
Presentation of ED-78 Methodology
  • SPR
  • used to co-ordinate operational, safety and
    performance objectives and allocate requirements
    to stakeholders
  • based on an operational safety assessment (OSA)
    and an operational performance assessment (OPA)
    of the functions, performance expectations and
    characteristics of the operational environment
    needed to support services identified in OSED

15
Presentation of ED-78 Methodology
  • INTEROP
  • Used to provide sufficient information to allow
    development of systems that are compatible for
    operational implementation
  • It is developed based on an interoperability
    assessment of selected functions and technologies
    identified in OSED

16
EUROCAE Suggested work programme (TBC)
  • OSED should be developed by WG-44
  • SPR and IR should subsequently be developed by
    WG-53
  • Then the final MASPS should be developed by WG-44

17
EUROCAE About a joint Committee
  • EUROCAE is willing to work on the AIS D/L topic
  • EUROCAE has to develop the ToR based on SC-206
    ToR (but maybe slightly different)
  • The activity shall take into consideration the
    work done by Eurocontrol on related topics
  • Consideration about the flow of data (wrt other
    applications)
  • EUROCAE will meet RTCA end of August to make a
    decision about a joint Committee
  • EUROCAE Technical Committee will address this
    subject mid-September (Technical Work Programme
    to be endorsed)
  • Final decision is expected end of September
    (endorsement by EUROCAE Council)