Title: Site Planning
1Site Planning
2Site Planning Goals
- Define Surface Features
- Existing
- Proposed
- Subsurface Features
- Existing
- Proposed
- Note Code and other Regulatory Issues
3A Site
Road Right-of-Way
4Existing Neighbors
Bldg
Parking
Ret Pond
Road
5Site Limitations
Easement
Road Right-of-Way
6Setbacks Zoning Code
Easement
Road Right-of-Way
7Subsurface Utilities
SS
W
UTS
CATV
SW
8Potential Area for Building as Limited by Zoning
Codes(Buildable Space)
SS
W
UTS
CATV
SW
9Proposed Building (must be less than available
area from zoning code)
SS
W
UTS
CATV
SW
10Add Parking and Landscaping from Local Codes
SS
W
UTS
CATV
SW
11Parking
- Asphalt Is normally used in FLA
- Base 8 to 12 inches thick
- Asphalt 1.5 to 2.5 in thick
- Slope less than 2 (handicapped maximum)
- Spaces minimum 9 x 18, preferred 10 x 19, with 24
foot aisles - Handicapped spaces based on Local codes
12Landscaping
- Add trees, shrubs and bushes based on local codes
- Typically the project will be less than 40
percent impervious as well
13Add UtilitiesWater and Sewer by Plumbing
CodeMeter and Sewer Tap by Utility
SS
W
UTS
CATV
SW
14Add UtilitiesWater and Sewer by Plumbing
CodeMeter and Sewer Tap by Utility
- Avoid putting water and sewer lines under asphalt
or near landscaping - CATV and UTS installed by local utility, also
avoiding landscaping
15Add UtilitiesWater and Sewer by Plumbing
CodeMeter and Sewer Tap by Utility
- Water line size from local codes and the demand
by building - 18 to 30 inches deep
- Copper, Schedule 40 PVC
- Sewer by code (typically utility)
- Minimum 1 slope
- Minimum 30 inches deep
- PVC Schedule 40
16 Water and Sewer
- Demands will be described in the Boca Code
- Extensions will be as per FDEP
17Storm Water Must be Retained
SS
W
UTS
CATV
SW
18Stormwater Retained on Site
- Exfiltration Trench
- On-site Wells
- Retention Ponds
19South Florida Water Management District
(continued)
- Environmental Resource Permit Manual Water
Quality - Wet Detention
- First 1-inch of run-off
- Or 2.5 times percent impervious
- Dry Detention
- 70 of value from wet detention
- Retention
- 50 of value from wet detention
- Additional requirements for minimum and maximum
recovery times
20How Much Stormwater Management?Private vs Public
Burden
2
3
5
10
100
1
50
Inches of Rainfall per Storm Event
Public
Private
Time Interval - Years
21South Florida Water Management District
(continued)
- Environmental Resource Permit Manual Water
Quantity - Building finished floor protection
- 100-year, 3-day storm event
- Roadway protection
- 5-year or 10-year, 1-day storm event
- May vary by local codes
- Allowable discharge
- Drainage basin dependent
- Preserves drainage rights of others
22Next where to put the Dumpster?
SS
W
UTS
CATV
SW
23Make Sure it is Accessible
SS
W
UTS
CATV
SW
24Future Surface Features