A tilt-up concrete panels construction project begins with job site preparation and pouring the slab. During this phase of the project, workers install footings around the slab in preparation for the panels. The crew then assembles the panel forms on the slab. Normally, the form is created with wooden pieces that are joined together. – PowerPoint PPT presentation

Number of Views:355

less

Transcript and Presenter's Notes

Title: How Are Tilt-up Concrete Buildings Constructed?


1
(No Transcript)
2
A tilt-up concrete panels construction project
begins with job site preparation and pouring the
slab. During this phase of the project, workers
install footings around the slab in preparation
for the panels. The crew then assembles the panel
forms on the slab. Normally, the form is created
with wooden pieces that are joined together. The
forms act like a mold for the cement panels. They
provide the panels' exact shape and size,
doorways and window openings, and ensure the
panels meet the design specifications and fit
together properly. Next, workers tie in the steel
grid of reinforcing bars into the form. They
install inserts and embeds for lifting the panels
and attaching them to the footing, the roof
system, and to each other.
The slab beneath the forms is then cleaned of any
debris or standing water, and workers
pour concrete into the forms to create the panels.
Now comes the point where tilt-up fencing
construction, or tilt-up construction, gets its
name.
Once the concrete panels have solidified and the
forms have been removed, the crew connects the
first panel to a large crane with cables that
hook into the inserts. The size of the crane
depends on the height and weight of the cement
panels, but it is typically two to three times
the size of the largest panel. The crew also
attaches braces to the tilt-up panel. The crane
lifts, or "tilts up," the panel from the slab
into a vertical position above the footings.
Workers help to guide the concrete panel into
position and the crane sets it into place. They
connect the braces from the tilt-up panel to the
slab, attach the panel's embeds to the footing,
and disconnect the cables from the crane. The
crew then moves to the next panel and repeats
this process. fencing
It's easy to be amazed as you watch the mobile
crane tilt up a concrete panel from the
ground and set it into its place. Massive cement
panels weighing 50,000 to 125,000 pounds or more
dangle from the crane's long lines. The crew
works as a team, setting the braces and guiding
the tilt-up panel with remarkable precision. The
speed of the process is also remarkable an
experienced tilt-up crew can erect as many as 30
panels in a single day.
Once all the tilt-up construction panels are
erected, the crew apply finishes to the walls
with sandblasting or painting. They also caulk
joints and patch any imperfections in the walls.
From this point the crew moves to the
installation of the roof system and the trades
begin their work inside the building. tilt-up
panels
,