Title: OPS 571 Read, Lead, Succeed/Uophelpdotcom
1OPS 571 Read, Lead, Succeed/Uophelpdotcom
- For more course tutorials visit
- www.uophelp.com
2OPS 571 Entire Course (New)
- For more course tutorials visit
- www.uophelp.com
-
- OPS 571 Week 1 Individual Assignment Process
Design Matrix and Summary - OPS 571 Week 1 Quiz
- OPS 571 Week 1 DQ 1
- OPS 571 Week 1 DQ 2
- OPS 571 Week 2 Individual Assignment Process
Designs and Supply Chains Presentation - OPS 571 Week 2 Learning Team Reflection
- OPS 571 Week 2 Quiz
- OPS 571 Week 2 DQ 1
- OPS 571 Week 2 DQ 2
- OPS 571 Week 3 Individual Assignment Process
Designs and Supply Chains Presentation Part 2 - OPS 571 Week 3 Learning Team Reflection
- OPS 571 Week 3 Quiz
3OPS 571 Final Exam Guide(NEW)
- For more course tutorials visit
- www.uophelp.com
-
- 1. Which of the following is considered a major
process flow structure? - Lead Time
- Fabrication
- Lean Manufacturing
- Project
- 2. ISO audits result in certifications that are
done by first, second, or third parties. Which of
the following result in the best certification of
a firm? - Certification is sought by any firm
assuming they pay annual dues. - 2nd Party where a customer audits
its supplier - 3rd Party where a qualified
national or international standards/certifying
agency serves as an auditor - 1st Party where a firm audits
itself against ISO standards
4OPS 571 Final Exam Guide
- For more course tutorials visit
- www.uophelp.com
-
- 1) __________ is when the activities in the stage
must stop because there is no place to deposit
the item just completed - A. Buffering
- B. Blocking
- C. Starving
- D. Pacing
- 2) According to your text, the most common
process metric is - A. productivity
- B. efficiency
- C. utilization
- D. throughput time
5OPS 571 Week 1 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- What are process flow structures? What structure
does your organization rely on the most? How
effective has the structure been in achieving
organizational goals?
6OPS 571 Week 1 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- What are some factors that affect global business
processes? How would these factors affect
development of new processes? How are those
factors different from those that affect local
business process development?
7OPS 571 Week 1 Individual Assignment Process
Design Matrix and Summary (New)
- For more course tutorials visit
- www.uophelp.com
-
- Complete the Process Design Matrix.
- Write an executive summary identifying
appropriate design approaches for a selected
product and service. - Pick one service with which you are familiar.
Complete three to five line items such as
production line, self-service, or personal
attention approach, on the Process Design Matrix.
- Pick one product with which you are familiar.
Complete three to five line items such as Job
shop, batch, assembly line, or continuous flow
approach, on the Process Design Matrix. - Required Elements
- No more than 700 words
- Consistent with APA format
- Submit Matrix with the Executive SummaryClick
the Assignment Files tab to submit your
assignment.
8OPS 571 Week 1 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 1
- 1) Why is the planning phase often referred
to as phase 0 (Zero) of the generic product
development process? - 2) If an automotive service center has an
issue with a car not being clean when retumed to
a customer, the poka-yoke corrective action might
include what? - 3) According to the Service-System Design
Matrix, sales opportunity has what sort of
relationship to production efficiency? - 4) Permeable systems are characterized by
being penetrable by customers via what two forms
of contact? - 5) Some may argue that the production-line
approach may not treat the process as a service
process, but as what type of process? - 6) Why do many customers like the
self-service approach to service design? - 7) Poka-yoke is a Japanese term for a
procedure that blocks an inevitable mistake from
becoming what?
9OPS 571 Week 2 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- Week 2 Discussion Question 1
- What is the learning curve and how can it be
applied? Would the learning curve be appropriate
for your organization? Explain your answer. -
10OPS 571 Week 2 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- Week 2 Discussion Question 2
- What is Six Sigma? What are the advantages and
disadvantages for implementing Six Sigma in your
organization? Analyze special considerations and
possible constraints of implementing Six Sigma in
an international business
11OPS 571 Week 2 Individual Assignment Process
Designs and Supply Chains Presentation (New)
- For more course tutorials visit
- www.uophelp.com
-
- This is part one of a two part assignment
starting with an introductory look at process
design and supply chains. - Identify a company with which you are familiar.
This could be your place of employment, a car
wash, a yard service company, and so forth. - Create an MS PowerPoint Presentation in which you
describe the current state of your selected
company's supply chain and an identified process. - Required Elements
- Describe the company's supply chain
- Identify a process internal to the company that
you wish to analyze. - Describe the process internal to the company that
you wish to analyze. - Identify an appropriate design approach for the
process you have chosen.
12OPS 571 Week 2 Learning Team Reflection (New)
- For more course tutorials visit
- www.uophelp.com
-
- Select a manufacturing organization the team
members are familiar with. - Review the company's website and other available
information and answer the following - What type of process design do they use Make to
Order, Make to Stock, or Batch? - What are two items regarding the manufacturing
process related to the organization that the team
finds unique or interesting? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion.Click the Assignment
Files tab to submit your assignment -
13OPS 571 Week 2 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 2
- 1) Which of the following consulting tools
are used in the cost impact and payoff analysis
stage in the operations consulting process? - 2) Which of the following is a situation
that likely will yield economies of scale? - 3) Which of the following is a key metric
associated with value stream mappinggt - 4) An advantage of a make-to stock process
is which of the following? - 5) Which of the following is one of the
major types of stakeholders impacted by most
consulting projects? - 6) Which of the following terms refers to a
special type of flowcharting tool that is
valuable for the development of lean processes? - 7) Which of the following production process
terms best describes the situation when
activities in a stage of production must stop
because there is no work?
14OPS 571 Week 3 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- Week 3 Discussion Question 1
- What is a safety stock and when should it be
used? How have safety stocks been used in a
global organization with which you are familiar?
Were they relied upon appropriately? -
15OPS 571 Week 3 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- Week 3 Discussion Question 2
- TOC advocates exploiting process bottlenecks.
What does this mean? Provide at least two
examples in business where this can be done
effectively.
16OPS 571 Week 3 Individual Assignment Process
Designs and Supply Chains Presentation Part 2
(New)
- For more course tutorials visit
- www.uophelp.com
-
- Create an MS PowerPoint Presentation in which you
evaluate the current state of the process you
selected in Week Two and summarize the proposed
future state. - Required Elements
- Evaluate the efficiency and effectiveness of the
process selected in Week Two using the data
collected. - Determine areas for improvement
- Design an improved process flow chart using an
appropriate tool. - Summarize two items from this improved process.
Include an explanation of how these items could
be used in your personal or professional life to
improve a process. - PowerPoint should include 4-5 slides with
detailed speaker notes. - Click the Assignment FIles tab to submit your
assignment.
17OPS 571 Week 3 Learning Team Reflection (New)
- For more course tutorials visit
- www.uophelp.com
-
- Discuss the following
- What is the chase strategy?
- Identify 2-3 companies that might use the chase
strategy - What are some of the challenges associated with
using the chase strategy and why? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion.Click the Assignment
Files tab to submit your assignment.
18OPS 571 Week 3 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 3
- 1) The text mentions several common
approaches to use when developing strategy to
close a capacity gap (where utilization of a
resource exceeds capacity available). Which of
the following is among the common approaches
mentioned? - 2) Which of the following is considered a
pure production planning strategy? - 3) Which of the following is an input to the
master production schedule (MPS)? - 4) Which of the following is an input
necessary to run an MRP Program - 5) Which of the following is an essential
resource that flows through a hospital supply
chain? - 6) Which of the following is one of the
categories of manufacturing inventory? - 7) The main purpose of operation planning is
to specify the optimal combination of which of
the following?
19OPS 571 Week 4 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- Week 4 Discussion Question 1
- How does capacity planning differ in service and
manufacturing organizations? -
20OPS 571 Week 4 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- Week 4 Discussion Question 2
- What role does supply chain management play for
organizations seeking to gain the competitive
advantage? Would it be advantageous for your
organization to focus its efforts on improving
its supply chain? -
21OPS 571 Week 4 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 4
- 1) The vertical axis on a Gantt chart is usually
which of the following? - 2) Consulting firms typically use which of the
following techniques to plan and monitor the
engagements of the firm or specific projects? - 3) Which of the following identifies a key
principle of reengineering? - 4) An example of a graphic project report
utilized within project management is - 5) Which of the following would be the result of
subdividing a project? - 6) At the onset, a project originates as which of
the following? - 7) A Responsibility Chart specifically identifies
which of the following? - 8) A work breakdown structure is
- 9) Which project progress technique includes the
essential features of a project plan, budgeted
cost of work scheduled and budgeted cost of work
performed?
22OPS 571 Week 4 Team Assignment Supply Chain
Design Paper (New)
- For more course tutorials visit
- www.uophelp.com
-
- Review the Riordan Manufacturing Virtual
Organization. - Write a paper of no more than 1,400-words that
includes the following - Determine Riordan's manufacturing strategy
(chase, level, or combination) and explain its
benefits - Create a process flow diagram for the electric
fan supply chain - Select two metrics to evaluate performance of the
electric fan supply chain - Describe the supplier relationship and the
effects on the supply chain. As part of this
consider the following - Type of relationship
- Supplier location, size of company, and financial
stability
23OPS 571 Week 5 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- Week 5 Discussion Question 1
- Does your organization use an enterprise resource
planning (ERP) systems? If so does your
organization rely on it and what influence does
globalization have on your ERP? If not choose an
ERP system and discuss why you believe this
system can help your organization to improve
efficiency and performance. -
24OPS 571 Week 5 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- Week 5 Discussion Question 2
- What role does competitive intelligence play in
international business forecasting? Which
qualitative techniques are most affected by
international differences? -
25OPS 571 Week 5 Individual Assignment Project
Management Recommendation (New)
- For more course tutorials visit
- www.uophelp.com
-
- Review the Project Management email.
- Write an email response in which you address the
following points - Determine which project might be implemented and
why (e.g. feasibility study, breakeven analysis,
etc). - Describe the five phases of a project
- Describe the key deliverables associated with the
selected project(s). - Click the Assignment Files tab to submit your
assignment.
26OPS 571 Week 5 Learning Team Reflection (New)
- For more course tutorials visit
- www.uophelp.com
-
- Discuss the following
- What are TQM and ISO?
- How might TQM and ISO be used to improve an
organization? - What are the benefits and challenges each?
- What is the role of a Quality Control department
in relation to either TQM or ISO? - Prepare a 350- to 1,050-word paper detailing the
findings of your discussion.Click the Assignment
FIles tab to submit your assignment.
27OPS 571 Week 5 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 5
- 1) What is one analytical tool common to all
quality improvement programs? - 2) A fishbone diagram might be found in
which DMAIC category? - 3) What is the international quality
management standard for quality management and
assurance that is primarily concerned with
quality of air, water and soil? - 4) What is a reason that a company may
pursue ISO-9000 certification? - 5) Who is responsible for performing the
first-party certification audit for a supplier
firm? - 6) What is the certification when a
qualified national or international standards
body or similar certifying agency audits and
certifies that a company is ISO 9000-complaint? - 7) An opportunity flow diagram would best
fit in which DMAIC category? - 8) Which is the international standard for
quality managements for automotive industry
suppliers of production parts, materials, and
services?
28OPS 571 Week 6 DQ 1
- For more course tutorials visit
- www.uophelp.com
-
- Week 6 Discussion Question 1
- What criteria must be used when considering where
to locate a facility in the global business
environment? What criteria does your organization
consider when deciding the location of a
facility?
29OPS 571 Week 6 DQ 2
- For more course tutorials visit
- www.uophelp.com
-
- Week 6 Discussion Question 2
- What are the factors that affect international
logistics? Which factor is the most important in
your current industry and why? -
30OPS 571 Week 6 Quiz (New)
- For more course tutorials visit
- www.uophelp.com
-
- QUIZ 6
- 1) According to Goldratt, which of the
following is defined as any resource whose
capacity is less than the demand placed on it? - 2) A bottleneck in a manufacturing process
may be targeted and eliminated by employing which
of the following? - 3) Which of the following is focusing step
of Dr. Eli Goldratts theory of constraints? - 4) Statistical Process control (SPC) and
data from the actual process to statistically
monitor the process over time are employed during
which step of the DMAIC cycle? - 5) The idea that statistical methods of
quality control, including six-sigma, does not
prevent defects, is central to what alternative
quality system? - 6) Identifying critical-to-quality
characteristics (CTOs) takes place in which steop
of the DMAIC methodology? - 7) Which of the following are examples of
Goldratts Rules of production scheduling?
31OPS 571 Week 6 Team Assignment Process
Improvement Presentation (New)
- For more course tutorials visit
- www.uophelp.com
-
- Create an 8-10 slide MS PowerPoint presentation
with detailed speaker notes. Include the
following - Identify which ISO standards apply to Riordan
Manufacturing - Using the Six Sigma DMAIC process, develop a new
process design for the production of the Riordan
electric fans. Be sure to take advantage of any
global opportunities available to Riordan, such
as lower labor costs. - Describe the bottlenecks that may occur in the
new process. - Identify three TQM tools that may be used for
ongoing process improvement. Be sure to describe
who will use the tool, when it will be used, and
what interval and how it will lead to process
improvement. - A project plan including A schedule including
project goals, a schedule, roles and
responsibilities and deliverables.
32OPS 571 Read, Lead, Succeed/Uophelpdotcom
- For more course tutorials visit
- www.uophelp.com