Title: O&M and Analytics Services by Mahindra Susten
1- OM and Analytics Services
- Case Study I
2Disclaimer
The information contained in this document is the
proprietary and exclusive property of Mahindra
Susten Pvt. Ltd. (MSPL) except as otherwise
indicated. No part of this document, in whole or
in part, may be reproduced, stored, transmitted,
or used for design purposes without the prior
written permission of MSPL. The information
contained in this document is subject to change
without notice. The information in this document
is provided for informational purposes only. MSPL
specifically disclaims all warranties, express or
limited, including, but not limited, to the
implied warranties of merchantability and fitness
for a particular purpose, except as provided for
in a separate license agreement.
3Introduction to OM
OM Responsibility
Duration
Levers to deliver
Owner Expectations
Maximised generation
3 Months
Robust Design
1
The Core responsibility of the team is to Operate
and Maintain the plant to deliver guaranteed
plant performance during the OM period and
delight the Customer.
6 Months
2
Quality Execution
Longevity of plant life
6 0 120 Months
3
Efficient O M
- Services
- Module Cleaning
- Weed Removal
- Waste Management
Proper plant up-keep to ensure streamlined plant
operations
- OM is a long term association with the Customers
4Maintenance Activities- Key Responsibilities
- Preventive Maintenance
- Routine inspection and servicing of equipment
Predictive Maintenance Real time plant remote
monitoring to ensure avoid and alert in case of a
breakdown or failure.
Breakdown Maintenance Attending to equipment
which has tripped or is in breakdown due to
abnormal conditions
- Timely and proper maintenance to ensure maximised
plant uptime
5Preventive Maintenance
- Key parameters
- Routine inspection
- Pre-defined schedule
- Can be scheduled or need-based
- Key drivers
- OEM guidelines Conforming to manufacturer
recommended guidelines and frequencies - Past Experience - Benchmarked to past failure
track record - Plant Specific Factors - Equipment type,
environmental conditions like - dust levels,
humidity, seasonal variations - Conditional Maintenance Testing of equipment to
identify the current level of KPIs and then
decide upon the need for preventive maintenance
- Optimised maintenance schedules for efficient
on-site OM
6Breakdown Maintenance
- Key parameters
- Equipment repair post failure
- Reactive in nature
- Ensure reduced response time to reduce plant
downtime
- Key drivers
- Breakdown impact analysis- Manage critical spares
depending upon the impact on down-time caused due
to equipment breakdown - Contract Management - Manage Contracts and SLAs
to ensure back to back warranty and quick
response - Clustered Spares- Take advantage of scale to
optimise spares and invest in higher of spares
in the central locations
- Quick troubleshooting for minimal downtime post
failure
7Predictive Analytics
- Key parameters
- Real-time plant performance monitoring and
analysis - Proactive identification
- Instant alerts and reduced equipment failure
- Ensures reduction in plant downtime
- Experienced team to assist in remote
troubleshooting - Historical trend analysis and insights
- Key Drivers
- Data analysis - Detailed analysis of plant
performance data to predict future trends and
potential failures - Investigation and experiments- Post failure Root
cause analysis (RCA) and Preventive action (PA)
- Equipment Benchmarking- Inter and Intra plant
Benchmarking across equipment makes and type for
maximising the generation
- Proactive response to enhance plant performance
and longevity
8OM Key Challenges and Mitigations
Issues Activity Affected Mitigations
Grid Issues Throttling Grid Variations and Instability Equipment Underperformance Downtime Frequent Tripping Under Efficiency Protection Contract Management Local Discom Co-ordination
Margin Pressures OM contract rates lowered Increased competition Customer Satisfaction Service expectation and Quality remains same in spite of reduce prices Cost Optimisation KPO and central monitoring New initiatives to reduce manpower, security costs and module cleaning costs
Local Issues Vandalism and Theft May cause disruptions Remote locations Module Cleaning / Vehicle Hire / Security Arm Twisting for Rates Minimum employment requirements Local Inclusion Focus on Local inclusion Sustainability focus Job creation and skill trainings Water conservation
- Indian OM Scenario calls for plant specific,
dynamic, and localised solutions
9Mahindra Susten Best Practices
- IMS Processes followed and complied to ISO
9001-2015 ISO 14001-2004 OHSAS 18001-2007 - 3 Dimensional SOPs focussing on Quality Safety
Environment - Operation Excellence Continual improvement
cycle - Job Authorization for Skill Development
- Cluster based Spares (including transformers)
- Soiling analysis
- In-house HT Testing team
- Specialised testing equipment
- Breakdown Impact analysis
- Experience across multiple makes of Equipment
- Real time monitoring and trouble-shooting by
domain experts with real time support to On-Site
team - Plant Health check-up
- Trend Analysis
- Adhering to standards to ensure enhanced plant
availability
10Mahindra Susten Track Record
Portfolio Level Performance
Results
- Portfolio size to reach 1GW by FY17
- Plant Uptime 99.5 across portfolio
- More than 800 days MTBF for 2 plants
- 1.8 Million Safe working man-hours
- Performance Ratio across portfolio above 104 of
guaranteed PR
- Track record of setting Industry Benchmarks
11Thank you
- For questions
- Sandeep Jadhav
- Head, OM
- jadhav.sandeep_at_mahindra.com
- Abhay Tilwankar
- Head, Performance Analytics, OM
- tilwankar.abhay_at_mahindra.com
- Ruhi Gupta
- Manager, Strategy, OM
- gupta.ruhi_at_mahindra.com
Visit us at www.mahindrasusten.com/o-and-m.php
If you found this reading useful, please follow
us for more information and similar publications
Copyright 2016 Mahindra Susten Pvt. Ltd.. All
Rights Reserved.