Case Study MAHA Metro - PowerPoint PPT Presentation

About This Presentation
Title:

Case Study MAHA Metro

Description:

Excelize project success story was accomplished with efficient planning and cost control. The project is an ongoing project. – PowerPoint PPT presentation

Number of Views:0
Date added: 14 June 2024
Slides: 5
Provided by: exzl@123
Category: Other
Tags:

less

Transcript and Presenter's Notes

Title: Case Study MAHA Metro


1
PROJECT SUCCESS STORY
Nagpur, Maharashtra
The total area of the Nagpur Metro project is
38.215 km.
Efficient planning Cost Control
2
PROJECT
ONGING
STATUS
About the project
Phase 1 of the Nagpur Metro Rail project includes
two major corridors, namely the North-South (N-S)
Corridor and the East-West (E-W) Corridor, with a
total length of 38.215 km
Input data
fig- 1
Scope of work MAHA Metro has set up a 5D digital
BIM platform(PMIS) for the design/construction
and operation of the metro in Nagpur.
Organization, governance set-up of control room
Project progress and schedule management Document
control Interface management Communications
management Delays, if any Reasons thereof and
ways to make up lost time Unresolved and
escalated issues Change Management Discussion on
submitted deliverable Timelines and anticipated
delay in deliverables if any Coordination
meetings Tracking project progress and reporting
using dashboards
fig- 2
LOD 300
Clashes Detection Resolution
Construction documents
www.excelize.com
3
Challenges
Benefit to the client
Design iterations and refine elements to align
with evolving needs and stakeholder input,
ensuring project goals are met Land/site handover
and regulatory delays pose challenges due to
complexities in ownership transfer, legal
formalities, and obtaining permits, potentially
impeding project timelines Stakeholder
coordination challenges stem from ineffective
communication, collaboration, and goal alignment
among project participants, leading to delays and
errors in execution Seamless handover ensures
smooth transfer of responsibility and operational
knowledge from construction to OM teams,
optimizing asset management throughout its
lifecycle
Asset Information Management System (AIMS) being
developed for effective handover to OM AIMS
along with a common data environment will support
effective OM CMMS (Computerized Maintenance
management system) Ensuring design consistency
and uniformity across all project phases
minimizes errors and enhances communication
efficiency among stakeholders, supported by
automated QA checks and dynamic review processes.
Early clash detection and resolution result in
cost savings by identifying and addressing
conflicts at the project's outset, optimizing
resource allocation, and streamlining
construction processes, facilitated by easy
access to the latest information. Easy access to
the latest information ensures stakeholders
receive real-time updates, fostering transparency
and informed decision- making throughout the
project lifecycle, facilitated by digital
platforms and collaborative tools.
Output
fig- 4
fig- 5
Our Services
BIM Consulting Scan to BIM Shop Drawings
Architectural BIM MEP coordination Landscape BIM
BIM training Model auditing BIM studio
www.excelize.com
4
20 years of BIM leadership
2500 projects
ISO 19650 Certified
100 companies prefer Excelize as BIM partner
3 global offices and capability centers
marketing_at_excelize.com www.excelize.com
Write a Comment
User Comments (0)
About PowerShow.com