Template for Department of Safeguards - PowerPoint PPT Presentation

About This Presentation
Title:

Template for Department of Safeguards

Description:

CSA Basic Obligations of the State. Establish a State System of Accounting for and Control of ... for nuclear material accounting and control procedures ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 10
Provided by: ttr95
Learn more at: https://www-pub.iaea.org
Category:

less

Transcript and Presenter's Notes

Title: Template for Department of Safeguards


1
Safeguards Milestones

Mark Pellechi Acting Senior Inspector State
Level Implementation Division of Operations
A Department of Safeguards
2
The Nuclear Non-Proliferation Regime
Global, Regional and Bilateral Agreements
Export Guidelines
Physical Protection
Control of the supply of nuclear and non-nuclear
material, technology and equipment
Protection from seizure, theft and criminal
activities
International Safeguards
International Safeguards
3
The NPT
Safeguards Undertaking Each Non-Nuclear-Weapon
State (NNWS) shall conclude safeguards agreement
with IAEA on all nuclear material in the State
within 18 months of becoming party (Art. III.1
and 4)
Fundamental requirement Comprehensive Safeguards
Agreement (CSA or full scope) in accordance
with the Statute of the IAEA and the Agencys
safeguards system
4
CSA Basic Obligations of the State
  • Establish a State System of Accounting for and
    Control of nuclear material (SSAC)
  • Provide information to the Agency
  • Facilitate access by Agency
  • Cooperate with the Agency

5
SSAC
  • Term SSAC has traditionally been used to
    denote
  • State authority, office or person designated as
    providing, on behalf of the State or several
    States, the formal technical interface for
    safeguards implementation with the Agency and
    facility operators, and
  • System for nuclear material accounting and
    control procedures laid down by the State
    Authority and implemented by the facility operator

6
Milestone 1 Ready to Make a Knowledgeable
Commitment to a Nuclear Programme
  • State recognition of
  • CSA (based on INFCIRC/153) in force
  • Establishment of an SSAC
  • If no nuclear facilities, an SQP can be concluded
  • Many States have an AP (based on INFCIRC/540) in
    force
  • State may need to prepare safeguards specific
    legislation, rules, regulations, and procedures

7
Milestone 2 Ready to Invite Bids
  • National legislation and regulation in place for
    nuclear facilities, locations, activities and
    materials to which safeguards will be applied and
  • Means to effectively implement them prior to
    requesting a bid for the first NPP
  • SSAC established
  • Early provision of design information to be
    provided to the Agency

8
Milestone 3 Ready to Commission and Operate the
First NPP
  • Safeguards measures being applied to all nuclear
    materials, and as appropriate, to nuclear
    relevant activities and facilities, under the
    control or jurisdiction of the State
  • Other elements of the safeguards infrastructure
    are in place
  • SSAC and facility operator trained and
    appropriately equipped prior to the receipt of
    nuclear material
  • Information regarding fuel cycle and all relevant
    nuclear material subject to safeguards
    instruments provided to the Agency

9
Safeguards Milestone Summary
  • Safeguards is an essential component of the
    nuclear non-proliferation regime
  • Timely and effective implementation of safeguards
    can help provide credible assurances of the
    peaceful nature of the States developing nuclear
    programme
Write a Comment
User Comments (0)
About PowerShow.com