Title: Resources Addition SSGWI Studies
12005 SSG-WI Economic Transmission Expansion
Planning Study Coordination with
other Sub-regional Planning Groups SWAT/Denver
Aug23 Peter Krzykos
22005 SSG-WI Transmission Study
- 2005 SSG-WI Study is assessing Transmission needs
to support Most Likely Future Generation
Scenarios - As described in SSG-WI Planning Process, SSG-WI
coordinates with the Sub-regional Planning Groups
(e.g. SWAT, NTAC,RMATS,CCPG, STEP) through
exchanges of information
32005 SSG-WI Transmission Study
- Modeling Effort being conducted under Technical
Support Group through 4 Subgroups - Modeling (LeadMike DeWolf)
- Transmission (LeadJeff Miller)
- Generation (LeadMary Johannis)
- Load Forecasting (LeadDonald Davies)
4SSG-WI Modeling Roles
Facilitator role the glue that binds us
together
Load Forecasting Sub-Group
- Topology
- Load forecast (2008)
- Load growth (2015)
- Load mapping to the bus level
- Determine
- Congestion and congestion costs
- Economic implications of alts
- Validate modeling
- Presentations report
- Planning margin
- Resources resource attributes
- Fuel prices
- Emissions
- Validate modeling
- Presentations report
Generation Sub-Group
Modeling Team
- Topology
- Transmission path ratings nomograms
- Transmission solutions to relieve congestion
- Validate modeling
- Presentations report
Transmission Sub-Group
TSG and PWG approve key assumptions, scenarios
and modeling results
5Coordination with Sub-regional Planning Groups
- Coordination with Sub-regional Planning Groups
through liaisons - SWAT Peter Krzykos
- STEP Bob Smith
- NTAC M Landauer
- RMATS Ray Brush Jim Tucker
- CCPG John Collins
6Coordination with SWAT2015 Scenarios
- Assistance in defining most likely 2015
scenarios - Check generation attributes for new thermal power
plants - Check assumptions on new wind, other renewable
- Check that outcomes of SSG-WI studies consistent
with SWAT studies where similar transmission and
generation assumptions made
7SSG-WI 2015 Case Preparation Process and Schedule
- Do Nothing case
- - Loads will be extrapolated to 2015
- levels
- - No resources or transmission
- additions beyond 2008 case
- - Determine production costs by
- area and congestion costs by area
8SSG-WI 2015 Case Preparation Process and Schedule
- Planned Resource Scenario" case
- The Planned Resource Scenario is intended to
model those resources and associated transmission
additions required to meet projected 2015 load
within a region.
9SSG-WI 2015 Case Preparation Process and Schedule
- Planned Resource Scenario" case
- Resource additions intended primarily for export
to other regions should not be included.
Evaluation of such resource plans should be the
objective of other resource scenario studies.
10SSG-WI 2015 Case Preparation Process and Schedule
- Planned Resource Scenario" case
- It is not the purpose of the Planned Resource
Scenario case to evaluate competing resource
plans.
11SSG-WI 2015 Case Preparation Process and Schedule
- Planned Resource Scenario" case
- The sources of information for the Planned
Resource Scenario are primarily publicly
available utility resource plans and/or
state/provincial agency resource studies.
12SSG-WI 2015 Case Preparation Process and Schedule
- Planned Resource Scenario" case
- A load resource balance will be performed.
Resources in addition to those identified above
may need to be added in areas where the planning
margin is insufficient. The Subregional Planning
Groups will identify for the SSG-WI Generation
Subgroup, which additional resources to include
to meet load and planning margin.
13NEW MEXICO
- New Generation or Retired Generation--2008-2015
-
- State Area Name New Plant or Plant being Retired
Bus Name -
- NM New Mexi Purchase/Retire-Renovate AFTONG
- NM New Mexi New/Renovated AFTONG
-
- NM New Mexi Purchase/Existing Merchant BLACKWTR
-
- NM New Mexi Retire-Renovated
REEVE_G1 - NM New Mexi New/Renovated REEVE_G2
-
- NM New Mexi Retire LVGT
-
- NM New Mexi New YORKCANY
-
- NM New Mexi New VERANDAT
-
- NM New Mexi New SHIPROCK
14NEVADA
- New Generation or Retired Generation--2008-2015
-
- State Area Name New Plant or Plant being Retired
Bus Name - NV Nevada New Chuck Lenzie N NV
NV Nevada New
Harry Allen Unit 4 - NV Nevada Existing Silver Hawk
-
- NV Nevada New Generic-Coal
- NV Nevada New Generic-Gas SCCT
- NV Nevada New Generic-Gas CCT
- NV Nevada New Generic-Gas SCCT
-
- NV Nevada New Air Conditioning Load Mgt (ACLM)
15SIERRA
- New Generation or Retired Generation--2008-2015
-
- State Name New Plant or Plant being Retired
- NV Sierra New Tracy Facility
Additions -
- NV Sierra New TS Power Plant
-
- NV Sierra New White Pine Project
16COLORADO
- New Generation or Retired Generation--2008-2015
-
- State Area New Plant or Plant being Retired
-
- CO COL EAST New COMANCHE
III - CO COL EAST New Wind Projects 2005
17ARIZONA
- New Generation or Retired Generation--2008-2015
- State Area New Plant or Being Retired
- AZ New Desert Rock
Energy - AZ New
Springerville ,4 - AZ New Gila Bend Power
Project - AZ New Bowie Power
Station - AZ New
Wellton-Mohawk - Renewable Energy Projects
- AZ New Sunshine
Wind Park - AZ New Dolan
Springs Wind
18Transmission Additions
- Add transmission required to integrate the
incremental resource additions that will be
represented in the Planned Resource Scenario. - Do not add new interregional transmission
required to increase export/import capability.
The identification of such additional
interregional transmission will be the subject of
congestion studies using the 2015 case.
19Transmission Additions
- Transmission Facility Additions / Assumptions
- SSG-WI 2008 and 2015 Base Cases
- December 15, 2004 TSG Meeting
- Line
2008 Case
2015 Case - McNary John Day No
No - Navajo Dineh Phase 1 (do a sensitivity) No
No - Navajo Dineh Phase 2 (do a sensitivity) No
No - Kingman Wind Project
No
No - (Will add back in if Gen Subroup includes Kingman
wind generation) - Eastern Mexico Tie
No No - Palo Verde Devers 2
No No - Tehachapi Wind transmission 1
line 2 lines - Canada CA (do a sensitivity)
No No - Pinal Project
No Yes - North Phoenix (Raceway)
Yes Yes - RMATS (do a sensitivity)
No No - Amps Phase Shifter
Yes Yes - New 500 kV line to San Diego
No No
20Transmission Additions
- Phase Shifter Modeling
- Bypass Perkins Crystal
- Five phase shifters on NE SE islanding
- Nelway in service
- Nomograms
- Add Southern New Mexico nomogram
- Criteria for Line Additions
- Use conservative transmission assumptions in the
base cases, with minimal additions. Add only
committed Projects. Purpose of base case is to
expose transmission problems, not intended to
express doubt about any projects benefits. For
2008 case, must be permitted and under
construction.
21SCHEDULE
- Comments and changes sent to
- Johannis,Mary H - R mhjohannis_at_bpa.gov
- by Aug.26.2005
- Sept 16,2005 - Initial run/congestion
- studies/identify transmission requirements
- Sept 28.2005 Rerun studies to optimize
- regional transmission to relieve congestion
- Determine sensitivities /extra runs ?/