Review Group 177 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Review Group 177

Description:

Defined 'Risk' as the difference between actual gas bills and those estimated by ... Risk Model superseded by RbD Feeder Model and RbD Forecasting. Review Group 177 ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 10
Provided by: fionac2
Category:

less

Transcript and Presenter's Notes

Title: Review Group 177


1
Review Group 177
  • Overview of RbD Risk Modelling
  • 31 March 2008

2
RbD Risk Modelling Background
  • Purpose
  • Risk Modelling supported the introduction of RbD
    (Reconciliation by Difference) in 1998
  • Designed to be one of the operational monitors
    of RbD
  • How
  • Defined Risk as the difference between actual
    gas bills and those estimated by RbD
  • Estimated month on month variability of RbD
    Charges based on assessment of inherent risk
    factors
  • Periodic updates were shared with the RbD
    Sub-Group

3
Risk Model - Results
  • Risk Model showed that RbD was less variable than
    Meter Point Reconciliation
  • Base model showed variability of /- 1.3 of
    allocation
  • Indicated variation with errors/timing
    differences included /- 2.5
  • Predicted variation increased/decreased between
    updates
  • Actual variation can be up to 5 of allocation
  • Last update provided 2002
  • Risk Model superseded by RbD Feeder Model and RbD
    Forecasting

4
Review Group 177
  • Variability of SOQs
  • 31 March 2008

5
Variability of SOQs
  • SOQ AQ PLF 365
  • PLF Peak Load Factor
  • Measure of peakiness of annual demand in an EUC
    what proportion of AQ would be used on a 1 in 20
    peak day
  • Set each year for each EUC as part of NDM
    Capacity Algorithms
  • Determination of PLF
  • EUCs 1 to 4 determined directly from the NDM
    Modelling extrapolating modelled demand to the
    78 year 1 in 20 CWV
  • EUCs 5 to 9 determined from the NDM Modelling
    using a Weather Correction Factor derived from
    the DNs forecast 1 in 20 Peak




6
Variability of PLFs Gas Year 05 to 06
B band EUCs only excludes WAR bands
7
Variability of PLFs Gas Year 06 to 07
B band EUCs only excludes WAR bands
8
Variability of PLFs 2006/07 to 2007/08
  • WAR Band variability
  • Gas year 05 to 06 100 of WAR Band PLFs changes
    in range -3 to 3
  • Gas year 06 to 07 96 of WAR Band PLFs changes
    in range -3 to 3

9
SOQ Amendment Options
  • PLFs are available by end of August (latest) for
    coming Gas Year, following industry consultation
  • Under rolling AQ rules, AQ may have recently
    updated
  • Options for NDM SOQs
  • Restate all SOQs on 1 October, regardless of
    recent AQ changes
  • Leave SOQ unchanged, will update at next AQ
    change
  • Update SOQs based on read frequency only amend
    Annually Read sites Monthly Read will get reads
    and update soon
  • Update SOQs based on read history if reads are
    frequent and AQ updates regularly, dont update
    SOQ
  • Considerations
  • Shipper comparability, differing read
    performance, Transportation revenue/costs, system
    processing, system capacity requirements
Write a Comment
User Comments (0)
About PowerShow.com