JetMET Trigger Plans - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

JetMET Trigger Plans

Description:

Implement regional unpacking in all subsystems. Example: substantial reduction in regional ECAL unpacking for e ... Implement regional unpacking/reco for jets ... – PowerPoint PPT presentation

Number of Views:13
Avg rating:3.0/5.0
Slides: 9
Provided by: leonardap
Category:

less

Transcript and Presenter's Notes

Title: JetMET Trigger Plans


1
JetMET Trigger Plans
  • Leonard Apanasevich
  • University of Illinois at Chicago
  • apana_at_fnal.gov

2
Outline
  • Overview of upcoming trigger planning activities
  • Physics priorities during initial commissioning
    stage
  • Trigger Coordination Group structure

3
Higher Level Trigger Activities
  • Implement regional unpacking in all subsystems
  • Example substantial reduction in regional ECAL
    unpacking for ? e/?
  • Code is available for siStrip, other systems
    pending
  • Optimization
  • Code improvement, accept time-outs (600 ms)
  • Algorithms
  • Complementary triggers
  • Control samples
  • Trigger Menus
  • Initial trigger menus ?
  • Thresholds, prescales
  • Trigger DQM
  • Next Milestone
  • Physics-Trigger Week,October 22 - 26

Wesley Smith
Mike Lamont, 20.06.07
Bunches ? Ib Luminosity Event rate
1 x 1 18 1010 1027 Low
43 x 43 18 3 x 1010 3.8 x 1029 0.05
43 x 43 4 3 x 1010 1.7 x 1030 0.21
43 x 43 2 4 x 1010 6.1 x 1030 0.76
156 x 156 4 4 x 1010 1.1 x 1031 0.38
156 x 156 4 9 x 1010 5.6 x1031 1.9
156 x 156 2 9 x 1010 1.1 x1032 3.9
Phase A Buildup
4
Simulated L1 rates at 1028
5
Physics Priorities for Phase A
  • Calibrate the detector
  • Begin to re-establish the Standard Model
  • Minbias PT and Rapidity Distributions
  • Study Jet Angular Distribution, DiJets
  • Establish MET
  • Gamma Jet Calibration
  • Standard Candles J/?, ?, W, Z

6
Trigger Coordination Organigram
7
TSG Needs You!
Volunteers needed from POGs/PAGs/DPGs
  • Trigger Menu Development
  • Study rates and prescale factors
  • Measure efficiencies
  • HLT Algorithm Development
  • Implement and maintain HLT paths
  • Trigger Menu Implementation
  • Study misalignment/miscalibration effects
  • Trigger Performance
  • Trigger Validation
  • Write DQM monitoring software
  • Evaluate CPU/memory usage

8
Priorities for JetMET
  • Need a volunteer to prepare release validation
    plots
  • L1 and HLT rates and efficiencies for our base
    triggers
  • Eventually migrate these into the DQM
    infrastructure
  • Begin studying misalignment/miscalibration
    effects
  • Alignment and calibration scenarios based upon 10
    pb-1 and 100 pb-1 of data in place for most
    sub-systems.
  • Implement regional unpacking/reco for jets
Write a Comment
User Comments (0)
About PowerShow.com