Col Rich White - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Col Rich White

Description:

Piggybacks: on existing spacecraft or an existing rocket. Dedicated rocket ... WINDSAT observation of Hurricane Isabel, Sep 03. SMEI observation of the sun. ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 11
Provided by: randyd9
Category:
Tags: col | hurricane | isabel | rich | white

less

Transcript and Presenter's Notes

Title: Col Rich White


1
Col Rich White Commander Kirtland AFB,
NM richard.white_at_kirtland.af.mil
2
Chain of Command
SECRETARY OF THE AIR FORCE
AIR FORCE CHIEF OF STAFF
AF SPACE COMMAND
SPACE MISSILE SYSTEMS CENTER
SMC DETACHMENT 12
3
Det 12 Has 3 Programs
4
Rocket Launch From a C-17
Purpose
  • Targets for Missile Defense Agency intercept

5
STP Spaceflight Methods
  • Shuttle/ISS
  • Piggybacks on existing spacecraft or an existing
    rocket
  • Dedicated rocket

170 flights, 437 experiments 1967 to present
6
CORIOLIS Sensor Data
SMEI observation of the sun. This picture
appears in the Jul 04 issue of National Geographic
WINDSAT observation of Hurricane Isabel, Sep 03
7
Why Det 12? To Reduce Risk!
Operational System
Warfighter Needs
  • 100Ms - 1Bs
  • Traditional SPOs
  • Technology Needs
  • System Deficiencies
  • Doctrine
  • 100Ks - 10Ms
  • RSLP, STP, RDSMO
  • CONOPS
  • Tactics, Techniques, Procedures
  • NRL
  • AFRL
  • MDA
  • DARPA

Technology Development
Test Evaluation
Testing includes demos, not just operational
systems
8
Space Test Comments
  • Robust test demo program worth every cent
  • 476M total FY06 cuts to SMC programs proposed by
    Senate Defense Appropriations Subcommittee due to
    immature technology
  • Space Test Program indigenous budget is 44M per
    year
  • Satellites expected to last 10 years with no
    physical maintenance in harsh radiation vacuum
    environment
  • Interface standards offer hope of increased
    reliability cost reduction
  • Not a standard bus but rather standard
    interfaces
  • One option is to institutionally require space
    incremental demo testing

Lives depend on systems that work!
9
Follow test procedures Dont let this happen to
you
10
Questions ?
Write a Comment
User Comments (0)
About PowerShow.com