L1 timing measurements and timing in track trigger

Description:

Pulsar Hardware Status (report from E1) Ted for Burkard Aug. 15th, ... MOAB (Mother of All Boards) SLINK. LSC/LDC ('commercial') ANL. SLINK- GBE (production) ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 9
Provided by: CDFU2
Learn more at: https://www-cdf.fnal.gov
Category:

less

Transcript and Presenter's Notes

Title: L1 timing measurements and timing in track trigger


1

Pulsar Hardware Status (report from
E1) Ted for Burkard Aug.
15th, 2003, bi-weekly meeting
We have been busy
  • Pulsar pre-production boards status
  • AUX card status
  • Taxi mezzanine card production status
  • Pulsar alpha version of Muon interface path
    status
  • Plans for the coming two weeks

2
Pulsar pre-production status? produced exactly
as the prototype design, no single design
change needed, but by a different vendor
  • Good news
  • 4 pre-production boards arrived two weeks
    ago,
  • 3 of them have been fully tested within two
    days.
  • it was just plugplayall interfaces
    tested.
  • ? thanks to Burkards automated test-stand
    VME software
  • Not so good news
  • The company made Pulsar more flexible than
  • design specification the thickness is thinner
    than
  • spec (63 mil instead of 93mil)
  • As a results, the boards work up to 80 MHz,
  • but not at 100 MHz as the prototypes do.
  • not so bad news the company admits the mistake,
  • and will make four new boards free of charge
    soon

3
Pulsar AUX card status
  • 5V version fully tested long ago
  • 3.3V version was tested with Pulsar SLINK test
    tools last week
  • ? Ready for pre-production in progress

AUX Card
4
Taxi mezzanine card status
TX
RX
  • Production finished weeks ago, 40 fully
    tested
  • Testing is somewhat behind due to the
    availability of
  • Pulsar boards and crate (all four prototype
    Pulsars
  • have been dedicated for muon path
    commissioning effort)
  • Now with the new pre-production Pulsars,
  • Taxi mezzanine card testing started again
  • Mikko is already an expert with Taxi mezzanine
    cards,
  • and he is taking care of the production
    visual inspection
  • and testing in progress
  • Note hotlink mezzanine cards productiontesting
    finished long ago.

5
Overall hardware status
Hotlink Tx/Rx Prod./testing done Taxi
Tx/Rx Prod. done, Testing in progress
MOAB (Mother of All Boards)
Pulsar
another pre-production on going
SLINK LSC/LDC (commercial)
AUX Card
ANL SLINK-gtGBE (production)
pre-production starts next week
6
Status of Alpha version of Pulsar muon path
  • Hardware/firmware/software tested and works
  • with cosmic runs for the full chain early this
    month
  • muon fiber XTRP inputs? Pulsar ? XTRPList
    ?Alpha
  • Had some problems with beam and can be
    reproduced with
  • L2_torture runs firmware needs improvements
  • work has been slowed down by other activities
  • the known problems have been fixed in the
    firmware,
  • now can handle L2_torture
  • Burkard just left for vacation
  • Sakari just came back from Finland ?
  • Cheng-Ju is now running the show ?

7
Firmware needs for PulsarPC interface timing
  • Two Pulsar PCs shipped from Upenn to B0
  • soon need special firmware for timing study for
    Pulsar/PC

AUX card
LDC
S32PCI64
CPU
LSC
S32PCI64
SLINK LSC
  • Tomi has been working on improving Muon Tx
    firmware,
  • now he has just started working on this
    firmware

8
Plans for next two weeks
  • Finish Taxi mezzanine card production testing
  • start AUX pre-production
  • Pulsar muon Rx with (near end of store)
  • beam runs (readout inputoutput buffers)
  • IF all works, may(?) request for a special run
    for the
  • full chain
  • Pulsar muon online monitoring software ready
  • Initial firmware ready for Pulsar/PC timing
    study