How to Pave the Way during Rocky Times - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

How to Pave the Way during Rocky Times

Description:

Oil & grease spots. Trip hazards. Hidden liabilities. Proper pavement markings ... Verify job completion according to scope of work. Document any work not ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 20
Provided by: robertm2
Category:
Tags: during | grease | pave | rocky | times | way

less

Transcript and Presenter's Notes

Title: How to Pave the Way during Rocky Times


1
How to Pave the Way during Rocky Times
  • Presented by
  • Mike Condon, Rose Paving
  • Andrew Musto, U.S. Pavement Services

2
AGENDA
  • Introduction
  • Parking lot liabilities
  • Cost-effective repairs
  • Maintenance process
  • Pre-job
  • During
  • Post-job
  • Open discussion

3
INTRODUCTION
  • Presenters
  • Rose Paving
  • 34 years in the industry
  • Headquarters in Bridgeview, IL
  • Satellite offices
  • U.S. Pavement Services
  • 25 years in the industry
  • Home base in Woburn, MA Hartford, CT

4
PARKING LOT LIABILITIES
  • Visible liabilities
  • Loose, irregular surfaces
  • Wet spots
  • Oil grease spots
  • Trip hazards
  • Hidden liabilities
  • Proper pavement markings
  • Proper quantity of dedicated stalls loading
    zones
  • Proper signage
  • Proper lighting

5
COST-EFFECTIVE REPAIRS
6
COST-EFFECTIVE REPAIRS
7
COST-EFFECTIVE REPAIRS
8
COST-EFFECTIVE REPAIRS
9
COST-EFFECTIVE REPAIRS
10
COST-EFFECTIVE REPAIRS
11
COST-EFFECTIVE REPAIRS
12
COST-EFFECTIVE REPAIRS
13
COST-EFFECTIVE REPAIRS
14
COST-EFFECTIVE REPAIRS
After
After
Before
During
15
COST-EFFECTIVE REPAIRS
Before
After
Before
After
16
MAINTENANCE PROCESS
  • Pre-job setup
  • Planning
  • Mapping
  • Scope of work
  • Traffic control
  • Signage / barricades
  • Contingency plan
  • Communication
  • Pre-construction walk-through
  • Document problem areas
  • Address client concerns
  • Review schedule/mobilizations

17
MAINTENANCE PROCESS
  • During
  • On-site management
  • Work area properly secured
  • Directional signage properly placed
  • Flag men directing traffic
  • Communication w/ restaurant management
  • Notify when crew arrives
  • Notify of any issues during work
  • Approve work before crew leaves

18
MAINTENANCE PROCESS
  • Post-job
  • Quality control management
  • Evaluation checklist
  • Walk the lot
  • Take pictures
  • Verify job completion according to scope of work
  • Document any work not completed reason
  • Remove signage any debis
  • Obtain final approval (sign-off)

19
OPEN DISCUSSION
  • Guiding Topics
  • Evaluation, estimating, and quoting process
  • Budget assistance
  • Project management
  • Post-job follow-up