1Module BondingWorking Group
- Salvatore Costa
- Università di Catania and INFN Sezione di
Catania
2Bonding Facilities
3Bonding Machines
Center Bonding Machines available to CMS
Bari Delvotec 6400
Catania Hughes 2470-II (11)
Firenze Delvotec 6400
Padova KulickeSoffa 8090, KulickeSoffa 4123, Hughes 2470-V
Pisa KulickeSoffa 8090
Torino Delvotec 6400
Fermilab KulickeSoffa 8090 (3)
Santa-Barbara KulickeSoffa 8090, KulickeSoffa 8060
Aachen HesseKnipps 710M
Hamburg Delvotec 6400
Karlsruhe HesseKnipps 710M
Strasbourg Delvotec 6400
Vienna KulickeSoffa 4123
Zurich Delvotec 6319, Delvotec 6320
4Bonding Times per Module
- Pre-bonding visual inspection 10min
- ARC test 15-30min
- Bond 5-35min
- 5min for KS
- 10min for Delvotec and HesseKnipps
- ? Double for 2-Sen Modules
- 35min for Hughes.
- Post-bonding inspection 10min
- Pull test if required (pull, cleanup, rebond)
20min - DB entry 5min
- TOTAL 45-90min excluding pull test
- NOTES
- ARC test times vary with Vpsp adjustment
- Some op may be performed in parallel by different
people
5DB Interface
6Bonding WG Web Site
7Production Rate
8Production Rate
9Bonding Failures Repair Actions
10Maintenance, Failures, Downtime
- Center Maintenance schedule Failures Downti
me - TIB
- Bari            yearly, no
contract     No                     Â
N/ACatania      on demand,no
contract    Once                  1 month
()Firenze          yearly by contract      Â
2 times            2 months ()
Padova           regularly by bond op.  Â
No                     N/APisa            by
bond op. as needed   No                    N/A
Torino           yearly, no contract    Â
No                      N/A - TECAachen         regularly by
bond op.  No                   N/AHamburg     Â
 on demand,no contract   Once    3 days
Karslruhe       on demand,no contract  Â
Once    1.5 daysStrasbourg  yearly by
contract      No                    N/AVienn
a           yearly by contract     Â
No                    N/AZurich         Â
on demand,no contract   Once                Â
 2 weeks - TOBFNAL            4/year by contract     Â
Damage by None power
failures - UCSBÂ 4/year by contract 1/machine 1-2
week/machine - () Attempts (failed) to fix in house, to save
money, made because prod was stopped           Â
11Bonding Failures/Rep Actions
- Bonding failure detected during bonding or at
post-bonding inspection - Wire wont stick
- Bond pops up (lift off)
- Foot is misplaced and causes a short somewhere
- We repair these right away if we can and/or list
as unbonded the strips that are such as a result
of the failure or of the repair action. - (Bonding) failure detected during post-bonding
ARCS or LT tests - Pinhole (caused by bonding/handling accident or
pre-existing and either undetected in Sensor test
or on untested Sensor) - Short (caused by bonding/handling accident or by
misplaced foot) - Open (bond popped up)
- Same action.
- Electric failure detected with ARCS at any stage
(pre-bonding, post-bias-pre-readout-bonding,
post-bonding or LT tests which dos not exhibit a
clear link to bonding - Increased LV current
- Anomalous IV
- We post the problem for the Debug/Repair Center
- Electric failure detected during post-bonding
ARCS or LT tests, which might be traced back to a
bonding failure - Example pseudo-pinhole At post-bonding ARCS
test, a PHL- is found. We pull the readout bond
as prescribed for pinholes but the test keeps
saying PHL-, so the Hyb ch is damaged. Since it
was OK at ARCS test on arrival perhaps we killed
it with bonding.
12Bonding Failure Rates
- Global percentage of damaged channels (Hyb ch
and/or Sen strips) because of bonding failures
lt0.01 - Based on a compilation of unrepairable bond
failures reported by individual centers on
20Apr2004. At that time 1180 Modules had been
bonded (800,000 bonds). - Since then reports at Meetings have indicated
improvements, therefore although a more recent
quantitative estimate is not available, it can
only be less. - Global percentage is the average between 0 from a
few centers (such as Pisa) were not a single bond
failure leading to loss of channels has been
observed and 0.08 in Catania see next slide
for analysis of failure types where the oldest
bonding machines, also lacking modern amenities
such as automatic correction of bond parameters
with varying substrate quality, are. - Not a single module lost yet (i.,e. no module
with gt 2 affected channels) because of bonding
failures out of 2,700 Modules bonded so far. - Only 1 module unbondable for dirty Pitch Adapter.
13Bond Failure Analysis (Catania)
53 Modules 34048 bonds Unrepairable failures Unrepairable failures Unrepairable failures Unrepairable failures
53 Modules 34048 bonds modules affected channels affected
Totals 10 19 29 0.08
Machine failures 7 13.2 14 0.04
Bond foot misplacement 2 3.8 9 0.026
to stick 4 7.6 4 0.012
Pinholes (caused by bonding?) 1 1.9 1 0.003
Operator mistakes 3 5.7 15 0.04
Mishandling 2 3.8 7 0.02
Wrong ref
Wrong par (lifts, pinholes) 1 1.9 8 0.02
14The chief Bonding quality indicatorthe Pull
Test
15Module Pull Tests Performed
Modules pull tested after 01Dec2003 (at last
Mtg)
Center PA TA PA-Sen Sen-Sen
Bari 98 (83 ) 101 (86) Â n/a
Catania 51 (51) 51 (51) n/a
Firenze 9 (9) 5 (5) Â n/a
Padova 18 (18) 99 (99) Â n/a
Pisa 18 (10) 46 (37) Â n/a
Torino 119 (114) 46 (46) Â n/a
Fermilab 121 (119) 35 (33) 35 (34)
Santa-Barbara 51 (51) 58 (58) 76 (76)
Aachen 37 (0) 41 (0) 41 (0)
Hamburg 69 (62) 50 (45) n/a
Karlsruhe 0 (0) 20 (20) n/a
Strasbourg 20 (20) 65 (65) 65 (65)
Vienna 55 (19) 91 (28) n/a
Zurich 0 (0) 42 (38) Â n/a
16Pull Test Results (Nov 04)
Not angle-corrected yet!
Average forces (g)
5g
BA CT FI PD PI TO FL FL SB
SB AA AA HA KA ST ST VI ZH
.
ss ss ss
ss
17Pull Test Results (Jul 04)
Not angle-corrected yet!
5g
BA CT FI PD PI TO FL
FL SB SB HA KA ST ST VI
ZH .
ss ss
ss
18Pull Test Results (Jun 04)
5g
BA CT FI PD PI TO FL
FL SB SB HA KA ST ST VI
ZH .
ss ss
ss
19Loop Documentation
- Procedure Uses a few of the identical
symmetrical bonds we place on the PA Tests areas. - Document the original bond
- Straighten a bond to (near) triangular shape
- Measure the angle at the bond foot
- Determine correction factor for pull strengths
201. Document the original bond
- Gently push bond over with the pull tester hook
until it rests flat on the PA surface, but taking
care that its shape is not significantly altered. - Take snapshot of bond under measuring machine.
212. Make bond triangular
- Gently pull bond up at mid-span with the pull
tester hook until it takes a (nearly) triangular
shape (figure below).
- Gently push bond over with the pull tester
hook until it rests flat on the PA - surface, but taking care that its now
triangular shape is not significantly - altered.
223. Measure angle at bond foot
- Take snapshot of triangularized bond.
- Measure angle using measuring machine.
234. Determine correction factor (1)
244. Determine correction factor (2)
Correction factor a 1 / (2 sin?)
q (º) corr. factor a
10 2.88
20 1.46
30 1
40 0.79
50 0.65
60 0.58
70 0.53
80 0.51
90 0.5
For symmetrical bond
25Module Gradingfrom Bonding
26Module Grading from Bonding (1)
- Grading based on unbonded strips
-
- First flag in BONDSTATUS_VAL vector
- 0 if n_unbonded lt1
- 1 if 1 - 2
- -1 if gt2
- These are consistent to grades A,B,C of ModTest
and the module is faulty with gt2 unbonded
strips.
27Module Grading from Bonding (2)
- Grading based on
- mechanical quality of the bonds
- Criteria to generate this second flag
- Bias Bonds (Spec 5, 15 for TIB back)
- gt2 grade A (flag 0)
- 2 grade B (flag 1)
- lt2 grade C (flag -1)
- critical readout bonds definition list of
critical by Alan - 2 grade A (flag 0)
- gt 2 grade B (flag 1)
- gt 20 grade C (flag -1)
- Operator judgment on all other bonds guidelines
to issue this judgment by Alan - A, B, C.
- These criteria will be ored together to generate
flag.
28Bonding Specifications Procedures
29Bonding Specs (1)
- Document on Bonding web site
- cms.ct.infn.it/bonding/bondspec.htm
- Contents
- Bonding Specifications ?
- Specifications on Bonding Jigs
- Specifications on Module Carriers
- Specifications on Module Components and Assembly
Relating to Bonding - Specifications on Working Environment
- Specifications on Final Module Bonding Quality
Acceptance
30Bonding Specs (2)
- wire thickness and type
- number of bias bonds
- loop height and form
- tail length
- accuracy of placement in X and Y
- pull strength
- break on pull failure
- failure rate
- number of bonds with one tool
31Bonding Procedures
- Bonding Proc Document on Bonding web site
- cms.ct.infn.it/bonding/bondproc.htm
- Reference doc in 43 steps
- Has many pictures (mainly for TIB at the moment)
- Procedure to perform the 50th wire Pull Tests
- cms.ct.infn.it/bonding/pullproc.htm
32Skip rules
- Leave unbonded
- All strips in bad-IDIEL list (considered
pinholes) - All Isolated bad CAC (believed to have high
chance to develop into pinholes with irradiation) - All but lowest in a bad CAC chain (believed to
represent shorts) - CAC Example 3 34 35 36 37 ? skip
isolated 3, - skip all but lowest in 34-37 chain, or bond
only 34
- Leave unbonded all strips in bad-IDIEL list
(although 16 are good), i.e. do not bother
looking at their actual IDIEL value. - Bond all isolated bad-CAC
- For the consecutive bad-CAC, compute rC and
consider them members of a short if rCgt1.5. Then
bond only the first strip in the short. - If rclt1.5 bond them, as if they were isolated
New rule
Old rule