Title: Erosion Control Plans


1
Erosion Control Plans
Erosion Control Policy and Procedures
for Contract Construction Activities excerpts
from J.D. Goins, PE, Chief Engineer - Operations
memo to Division Engineers dated January 21,
2000
2
(No Transcript)
3
Made changes that were within technicians
authority. Remember to have a well conceived
reason for changing the location or type of
device. Review with project engineer. What six
items cannot be changed without Roadside
approval? (answer on next slide)
As-builts showing installed devices and changes.
4
Devices which require consultation with
Roadside Environmental Unit prior to modification
1) Type A silt basin (REU consults with
Hydro) 2) Rip Rap Sediment Dams 3) Temporary
Sediment Traps located at stream crossings or
drainage turnouts 4) Rock Silt Check Dams
located at stream crossings or drainage
turnouts 5)Culvert Construction Sequence (REU
consults with Hydro) 6) Channel Changes
temporary or permanent (REU consults with Hydro)