2004 CECOP INTERNSHIP - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

2004 CECOP INTERNSHIP

Description:

2004 CECOP INTERNSHIP. Worked for the City of Salem's facilities ... Constructed my own cubicle. Negatives; With only three projects it can got boring at times ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 13
Provided by: classesEn
Category:

less

Transcript and Presenter's Notes

Title: 2004 CECOP INTERNSHIP


1
2004 CECOP INTERNSHIP
  • Worked for the City of Salems facilities
    engineering
  • 40 hour work week
  • 13.04 per/hour, no benefits or overtime

2
Three Major Projects
  • Streambank Restoration Manual
  • V-Notched rock weirs at selective bridge location
  • Temperature TMDLs

3
Streambank Manual
  • An Idea book for streambank restoration
    techniques
  • A 58 page document containing info such as
  • Riparian data and recommended plants
  • Streambank armoring
  • Permitting
  • Construction methods
  • Erosion types

4
What is a V-Notch weir?
5
(No Transcript)
6
  • Scour hole near Summer St. bridge

7
(No Transcript)
8
(No Transcript)
9
The Idea behind Using a V-Notch Weir
  • A V-Notched weir has the potential to create
    scour holes downstream
  • The weir can be placed before or after bridges to
    prevent gravel bars from forming
  • Whats wrong with a gravel bar?
  • Gravel bars split the stream and can scour the
    streambank and bridge footings
  • Plants can get established and cement the gravel
    in place

10
TMDLs
  • To boring and tedious to discuss
  • Mostly a new way for government to permit for
    stream channels
  • I experimented with modeling thermal energy using
    Heat Source

11
Testimonials
  • I hate Heat Source. It is hard, time consuming
    and just downright maddening
  • Unnamed modeler/analyst
  • Heat Source is really a great model when other
    people set it up, run it and document the results
    for me
  • Another unnamed modeler/analyst
  • I thought Heat Source modeling was supposed to
    be fun. Didnt they say that in my job
    interview
  • Unnamed recently hired water quality analysist

12
Positives and Negatives
  • Positives
  • More AutoCad experience
  • Learned ArcView and ArcInfo
  • Not so stressful, very laid back
  • Got to know some good engineers
  • Learned How the City uses in house engineers
  • Get bored, drive around
  • Constructed my own cubicle
  • Negatives
  • With only three projects it can got boring at
    times
Write a Comment
User Comments (0)
About PowerShow.com