2OVERVIEW
- Project Progress
- Funding Status
- Potential System Improvements
- Issues
3Nationwide Differential Global Positioning System
(NDGPS)
Five Categories of Applications Provides 1.
Original Code-Based NDGPS Applications 1 - 3
meters Navigation, Precision Farming, Resource
Management, Dredging, Buoy Positioning, Positive
Train Control, Emergency Response GIS 2.
Post-Processing NDGPS Applications 2 - 5
centimeters Surveying, Mapping, Charting
Hydrography 3. Stationary Scientific NDGPS
Applications 2 - 3 millimeters Plate Tectonics
Monitoring Earthquake Prediction 4. High
Accuracy NDGPS Applications 10 - 15
centimeters Real-time Automated Surveying of
Roadways, Railways Harbors Highway Lane
Keeping Machinery Control 5. Weather
Forecasting Application Continuous measurement
of water vapor in the atmosphere
4Coverage March 2003
Coverage (September 2002)
5Coverage March 2004
Current Coverage (September 2003)
6Projected Coverage Funded
Projected Coverage (December 2003)
7Current Status
- NDGPS Expansion is progressing.
- Currently 81 sites are operational.
- Continue to fill coverage gaps.
8Current Status (contd)
- Single-station coverage now at 87 of the CONUS.
- Dual-station coverage currently 55.
- Eight sites under development.
- Single coverage, nation-wide, should be achieved
by the end of 2005 with the addition of 9 more
sites.
9Complete Dual Coverage Requirement
- 25M to complete CONUS dual coverage Alaska
rail corridor coverage. - Total of 28 more
sites in CONUS AK - 22.5M to complete single coverage of Alaska
- Total of 15 more sites in AK - 8M for annual operations maintenance
- Current annual OM costs are around 3.3M
10NDGPS Funding History
- FY1998 -- 2.4M (in Coast Guard
appropriation) - FY1999 -- 7.2M requested by FRA
- 5.5M (in Coast Guard appropriation)
- FY2000 -- 10.4M requested by FRA
- 5.0M (in FHWA appropriation)
- FY2001 -- 18.7M requested by FRA
- 6.0M (in FAA appropriation)
11NDGPS Funding History (cont)
- FY2002 -- 20.5M requested by FRA
- 6.0M (in FHWA appropriation)
- FY2003 -- 32.1 Requested by FRA
- 6.0M (in FAA appropriation)
- FY2004 -- 27.0M requested by FRA
- 5.8M (in FRA appropriation)
12Potential System Improvements
- Improve performance ... address the needs of
governments and public - Higher accuracy, at the 10-20 cm level
- Utilize additional available bandwidth for
safety or public service applications
13High Accuracy NDGPS
- Enable 3-D Dynamic Positioning at the Centimeter
Level throughout the NDGPS Network - Coexist with the current NDGPS Broadcast
- Minimize the incremental cost of adding High
Accuracy NDGPS to NDGPS Sites - Utilize existing broadcast antenna, reference
stations, and site infrastructure - Incremental Cost 90K/ Site
- The Phase I HANDGPS Report is available
at www.tfhrc.gov/its/ndgps/02110/index.h
tm
14NDGPS Issues
- Convening the NDGPS Executive Steering Council
(NESC) - Maintaining a stable source of funding
- New sites will require addition design and
construction effort
15Nationwide DGPSProject Status
- Presentation to CGSIC43nd Meeting
- March 10, 2003
- s s s s s s s s s s s s s s s s
- CAPT Curtis Dubay
- U.S. Coast Guard