12 Order of operations Day 2 - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

12 Order of operations Day 2

Description:

6.) Twice the difference of 10 and 3. 2(10-3) 2(7) P. 14 M ... The cost of renting a snowboard at Whistler is r 7.50d. r=basic rate, d=number of days rented ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 9
Provided by: DJ168
Category:

less

Transcript and Presenter's Notes

Title: 12 Order of operations Day 2


1
1-2 Order of operations Day 2
  • Homework
  • Practice 1-2 (1-51odd)

2
1.) 82 x 4 -1 4 x 4 -1 D
16-1 M 15 S 2.) 7-32
42 S 6 A
3
3.) 10-6 M 4 S 4.)
(8) 32 P 8(9)
E 72 M
4
5.) 20-223(5-1) 20-223(4) P
20-43(4) E 20-412
M 20-16 P 4
S
5
  • 6.) Twice the difference of 10 and 3.
  • 2(10-3)
  • 2(7) P
  • 14 M

6
  • 7.)The sum of 6 and 5, multiplied by 3.
  • (65)(3)
  • 11(3) P
  • 33 M

7
Translate into a sentence 8.) 6(8-1) Six plus
the difference of 8 and 1. 9.) 8(102) Eight
times the quotient of 10 and 12.
8
The cost of renting a snowboard at Whistler is r
7.50d. rbasic rate, dnumber of days rented
  • 10.) The basic rate is 10, you rent for 3 days.
  • r7.50d
  • (10)7.50(3)
  • 1022.50
  • 32.50
Write a Comment
User Comments (0)
About PowerShow.com