Title: PowerPoint Presentation - Safe Drinking Water
1Welcome to the Outback Steel BuildingsConstructi
on ProcessS L I D E S H O W
2 Beginning the construction process with the
foundation in place and the first steel members
laid out.
2 OF 20
3 Assemble the X-Braced bay first. Review the
instruction manual for various ways to erect
frames.
3 OF 20
4 Plumb and square the X-Braced bay. Once the
first bay is plumb and squared, its just a
matter of measuring distance to put the other
frames in place.
4 OF 20
5 Run a row of purlins down both sides of the
peak and another near the eave to tie the frames
together.
5 OF 20
6 Finish installing the purlins based on the
purlin spacing specified by the engineered
drawings.
6 OF 20
7 Frame all exterior sidewall and endwall girts
along with window and door openings.
7 OF 20
8 Install the roof insulation and roofing. Our
roof fasteners are applied through the high ribs
of our roofing sheets. The special threads allow
for superior performance against leaking.
8 OF 20
9 Install all windows and entry doors. Trim them
out with trim kits. Its very easy to work with
light gauge steel if you have the right tools.
Ask our building consultant to include them in
your kit.
9 OF 20
10 Steel siding is extremely popular. Its strong
and requires little maintenance. But, Outback
Steel Buildings are simple to finish with other
materials to match existing structures too.
10 OF 20
11 In a building which includes a mezzanine, the
joists must be installed before the endwalls are
applied. This is a very clean building system
with lots of usable space.
11 OF 20
12 Once the mezzanine floor joists are installed
and the ends capped, you are ready to place the
floor decking.
12 OF 20
13 Its back outside to finish installing the
endwall sheeting. Various roof pitches require
the builder to cut the sheeting angle at the
gable.
13 OF 20
14 Safety is critical! This is not the OSHA
approved method for installing tall sheeting. If
you are hiring the work out, check references and
for proper licensing, bonding, and insurance
coverage.
14 OF 20
15 Install trim pieces, outside corners,
ridge-caps, and gable flashings. Extended eaves
add value and are worth the expense where
aesthetics are important.
15 OF 20
16 The overhead doors are installed after the
opening is framed, trimmed and pre-measured by
the installer. Its a good idea to have the
installer inspect the opening just after framing.
16 OF 20
17 Gutters and down spouts help protect the
building. We can supply them or you can have them
installed locally.
17 OF 20
18 Outback Steel Building Systems are fully
engineered to meet your specific needs. We
guarantee strength and beauty that will withstand
natures toughest tests.
18 OF 20
19For more information about Outback Steel
Buildings, the most advanced steel building
system design in the world, just contact us toll
free at 877.994.9988 or email dan_at_outbacksteelbuil
dings.com