Integrated Reservoir and Production Management - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Integrated Reservoir and Production Management

Description:

Choke positions will be remotely monitored. Huldra Data Acquisition. Replicators. Measurements ... Choke Positions. Automatic Import. PROSTY allocated rates ... – PowerPoint PPT presentation

Number of Views:883
Avg rating:3.0/5.0
Slides: 17
Provided by: Jane1218
Category:

less

Transcript and Presenter's Notes

Title: Integrated Reservoir and Production Management


1
Integrated Reservoir and Production Management
  • Raghu Kulkarni
  • Roxar Production Management

2
Outline
  • What is Integrated Reservoir and Production
    Management (IRPM)
  • Huldra Field
  • IRPM Future

3
Reservoir Management
Reservoir Loop (months-years)
Reservoir Characterization
Development Planning Execution (includes
economic)
Production Loop (days-weeks)
Identify KPI
Production Monitoring
Update OP
Review PLP and RLP
Reservoir Monitoring
KPI Key Performance Index PLP Production Loop
Performance RLP Reservoir Loop Performance OP
Operating Plan
4
Reservoir Characterization
Seismic
Structural Info
Well Logs
Geological Model
Production Data
Simulation Model
Simulation
History Match
To Development Planning
5
Development Planning
From Reservoir Characterization
6
Production Loop Analysis
7
Production Loop Data Activity
8
The Huldra Case
9
Huldra Development
  • Will be developed as a NNM well-head platform
    with a first stage separator, liquids to
    Veslefrikk and gas to Heimdal
  • All wells will be equipped with multiphase meter
    and sand monitoring system
  • All wells will have downhole PT gauges
  • Choke positions will be remotely monitored

10
Huldra Data Acquisition
  • Measurements
  • Bottom-hole Pressures Temperature
  • WellHead Pressure Temperature
  • Meter FlowRates
  • Meter Pressure and Temperature
  • Sand Production
  • Choke Positions
  • Automatic Import
  • PROSTY allocated rates
  • Manual Import
  • Eclipse Simulation
  • PVT Tables
  • Vertical Lift Tables

Data will be available real-time using DACQUS to
Huldra asset team in Bergen (or anywhere else
and partner offices)
11
Huldra IRPM Suite
  • Huldra IRPM suite consists of following modules
  • DACQUS
  • Data Acquisition (time series)
  • Visualization
  • Mathematical Operations on time series
  • Qtotal Q1 Q2 ...Q6
  • BHP VLPLookUp(THP,Qo,Wct,Gor)
  • Time shifting to compare transients from a common
    time datum
  • Sand production indicators, hydrate formation
    indicators
  • Basic Engineering Analysis
  • WellTest
  • Analysis of transient data
  • History of well multirate tests
  • GAP Link (VBA script running GAP from Petroleum
    Experts)
  • Field optimization software

12
Gap-link
13
IRPM
Manual
14
Future
15
IRPM Work Process
Data Acquisition And History
Optimization
Constraints
Set Points
16
IRPM Challenges
  • Technology should apply to dumb as well as
    smart fields
  • Easy common interface
  • Ability to connect to different optimization
    tools