Title: BouwData PB Coding
1BouwData PBCoding
2- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
3- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
4Choke point 1
- Each building partner has a different need of
knowledge - Investor the price is devided in the underground
and the aboveground building cost - Designer price of for example a window, all
accompanying activities inclusive - Building supervisor price of for example a m²
formwork - ? Each building partner has a preference for a
different top-down structure - ? Price list in a tree diagram is not sufficient
5Choke point 2
- Not a univocal work system.
- In each project with new building partners
- A different classification of building
specifications - Different measure codes
- Different states of progress
- ? Waste of time communication issues
- ? An advancement of knowledge for the entire
project is impossible
6Choke point 3
- No transparency with regard to the building cost.
Following costs are judiciously spread among
the production costs - The cost of the layout of the construction site
- The cost of the preliminary works
- The cost of the project follow-up
- ? The knowledge of these costs are confined to
the building supervisor - ? No concrete price comparison are possible
7- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
8Available norms
- Program
- Design
- Execution
- Realization
- Usage
- NBN B06-002 surface content of buildings
- NBN B06-003 investment costs
- NBN B06-001 standard measure method
- NBN B06-004 exploitation costs
- NBN B06-005 data management usage
NEN 2630 NEN 2631 NEN 3699 NEN
2632 NEN 2633
B U I L D I N G P R O C E S S
NEN 2634 terms, definitions and rules with
reference to costs and quality aspects for
building projects
Building Declaration NEN 2630 ? NEN 2580
STABU system of building specifications for
residential and commercial building
9- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
10Frame of notions TU Delft
- ? As a result of the Building Declaration
- Complex a compilation of several buildings that
belong together - Building a complete compilation of
functional/fysical objects that are necessary to
meet a demand of accomodation - Cluster of elements a group of elements with
certain characteristics that are interconnected - F.ex. Foundations
- Element a functional object with a specific
function, defined without mentioning the kind of
the technical solution or the construction method - F.ex. Floors on groundwork weight 3 tons/m²,
planeness class 5mm/2m - Building fraction a fysical object with a
specific performance, defined precisely by
mentioning the kind of the technical solution and
the construction method - F.ex. Floors on groundwork - 20cm concrete
C25/30 with 25kg/m³ steel fibres on a PE-foil
0,2mm and on a substratum of 5cm soil and 30cm
rubble
11Frame of notions TU Delft (2)
- Component a fysical object with a specific
performance that is part of a building fraction,
composed of building delivery products, with the
use of labour and materials - F.ex. Ground stabilization of the building
excavation - Activity the process of the handling of
building products with the use of labour and
materials for the realization of components - F.ex. Formwork
- Means generic data carrier for labour,
materials and equipment - F.ex. Delivery PE-foil 0,2mm
- GBEC (General building execution cost) costs of
labour and equipment, that are necessary for the
realization of a building, insofar the costs are
not linked to means that remain on the building
site once the building is completed
12- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
13Theory
- Complex
- Building
- Cluster of elements
- Element
- Building fraction
- Component
- Activity
- Means (labour, materials, equipment)
- GBEC (General building execution cost)
? PoD, Chart 6, NEN 2634 ? PoD, Chart 7, NEN
2634 ? PoD, Chart 8, NEN 2634
functional description
Program / design
Cost index numbers of previous projects
Execution / realization
Prices with regard to this project
technical description
- STABU system of building specifications and
conditions
- Separately defined as of chart 6, NEN 2634
14Practice
- Complex
- Building
- Cluster of elements
- Element/building fraction
- Component composing parts of the building
fraction/element - Activity
- Means (labour, materials, equipment)
- ? PoD, Chart 6, NEN 2634
- ? PoD, Chart 7, NEN 2634
- PoD, Chart 8, NEN 2634
- PoD, Chart 1 of BB-SfB registered in chart 8,
NEN 2634
Data of BIM
Program / design
Cost index numbers of previous projects
Execution / realization
Prices with regard to this project
- means and formulas based on STABU system of
building specifications and conditions
to be entered in a calculation program
15- Choke points
- Available norms
- Lexicon as a reference frame
- Theory vs. practice
- Coding BouwData PB
16Development BouwData PB
- On C3A-net with the support of IWT (nr.080429)
- Concept basisc lists are free of charge
- Monitored by 350 building professionals
17System of agreements BouwData PB
- Administration groupware
- Phasing of the building process
- Structure of the performance building
specifications and conditions specific for a
project - Structure of the technical building
specifications and conditions specific for a
project - Variety of costs
- Quantities and units
- User functions and space designations
- Cost centres and accompanying ratios
18Performance specifications vs. technical
specifications
- Use of BIMSplitting up object and material
- Object focused on design ? NEN 2634, chart 1
of BB-SfB - Material focused on execution ? STABU
(instead of chart 2 3 of BB-SfB) - Conversion instead of folding out the same tree
diagram! ? cost centres respect property
developer
19Performance specifications vs. technical
specifications (2)
20Quantities and units
- SI-units
- Extension with agreements in the benefit of cost
related units F.ex. m² - d a cost / m² /
day can be used in f.ex. taxes on the
installation of the construction site on
public property - F.ex. t - km a cost / ton / kilometre can be
used in f.ex. transport of soil
21Variety of costs
- Cost index numbers for several building phases
- Means (MLES)
- General costs (GC)
- General building execution costs (GBEC)
- Profit
- Risk
- Approximate estimates
- (MLES) Materials, Labour, Equipment and
Subcontracting
22User functions and space designations
- In accordance with the Dutch Building Declaration
(instead of chart 0 of the BB-SfB) - User functionsF.ex. Housing function, sport
function, cell function, - Defined spacesF.ex. lavatory, heating system
room, traffic space, - Definition usable surface
23User functions and space designations (2)
24Cost centres and accompanying ratios
- Coding based on
- NBN B06-002
- Chart 1 BB-SfB
- Building Declaration
- Addition (English abbreviation)
- Geometry of the building
- Finishing of spaces for the purpose of user
functions
25Cost centres and accompanying ratios (2)
26Cost centres and accompanying ratios (3)
27More information about BouwData PB ?
www.bouwdata.net