TRILL Routing Requirements - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

TRILL Routing Requirements

Description:

Lots of mailing list input on STP and spanning tree forwarding interactions ... we will support for the numbers of spanning trees (there is still a lot of ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 8
Provided by: eric112
Learn more at: https://www.ietf.org
Category:

less

Transcript and Presenter's Notes

Title: TRILL Routing Requirements


1
TRILL Routing Requirements
  • Currently draft-gray-rbridge-routing-reqs-00

2
Assumptions
  • RBridge Architectural Model remains the same as
    in draft-perlman-rbridge-03 (RBridges
    Transparent Routing, Radia Perlman, Joe Touch and
    Alper Yegin, May 2005)
  • Allow for zero configuration
  • Optimal, campus-scope pair-wise (RBridge
    RBridge) routing
  • Short-term loop mitigation
  • VLAN support
  • Using existing routing protocols (IS-IS
    emphasized for now)
  • Miscellaneous other (hopefully minor) assumptions

3
Document Content and Structure
  • Content primarily from draft-perlman-rbridge-03
    with some input from others and from the list.
  • Structured (beyond template requirements) to
    include
  • Requirements for link state routing protocol
    support
  • Issues
  • Interactions with STP and spanning tree
    forwarding
  • RBridge interactions with routing
  • Conclusions
  • Usual Introduction, Security Considerations,
    References, Acknowledgements, blah, blah.

4
Input Since Submission
  • Lots of mailing list input on STP and spanning
    tree forwarding interactions
  • Specific wording suggestions
  • Dialogue on possible changes to the model
  • Additional references to include

5
Seeking Further Input/Guidance
  • Several sections are TBD at present
  • Determine what model(s) we will support for the
    numbers of spanning trees (there is still a lot
    of unresolved discussion on this)
  • Work out the conclusions of the document
  • Review, comment and suggest text for remainder of
    the document please!

6
To do
  • Add IANA considerations (likely template
    requirement even if there are none)
  • Rev with input to date (waiting until after the
    meeting)
  • Continue discussions mostly on the list of
    models, references, suggested content.
  • Add to Acknowledgements and Reference sections.
  • Determine at what point this should become a WG
    document

7
Conclusion
  • Thanks!
Write a Comment
User Comments (0)
About PowerShow.com