WP6' Scenario analysis on selected case studies - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

WP6' Scenario analysis on selected case studies

Description:

To develop predictive tools to anticipate ecological changes and to ... Segura diversion, spread of desalination plants, the expected new diversion Ebro-Segura) ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 13
Provided by: catherin191
Category:

less

Transcript and Presenter's Notes

Title: WP6' Scenario analysis on selected case studies


1
WP6. Scenario analysis on selected case studies
  • DITTY Project
  • 13-14 Nov 2003 - Ferrara (Italy)

2
Objectives of WP6
  • To develop predictive tools to anticipate
    ecological changes and to propose management
    solutions to avoid extension of environmental
    crises both in intensity and frequency.
  • The chosen approach is to define relevant
    scenarios and simulate them via models developed
    in the other WP.

3
Task 6.1 Nutrient load change
4
Task 6.2 Anoxic crisis
5
Task 6.3 Effects of bacteria of sanitary concern
6
Task 6.4 Exotic species with invading and (or)
toxic characteristics
7
Task 6.5 Changes in resource exploitation
8
Task 6.6 Effect of global climate variability
9
Other scenarios proposed
  • Changes in water circulation

10
(No Transcript)
11
Scenarios ranked by priority (based on surveys
answers)
  • Task 6.1 Nutrient load change
  • Task 6.2 Anoxic crisis
  • Task 6.3 Effects of bacteria of sanitary
    concern
  • Task 6.5 Changes in resource exploitation
  • Task 6.4 Exotic species with invading and (or)
    toxic characteristics
  • Task 6.6 Effect of global climate variability
  • Changes in water circulation
  • Jellyfish blooms in the lagoon
  • Hydrological changes (Tagus-Segura diversion,
    spread of desalination plants, the expected new
    diversion Ebro-Segura)
  • Urbanisation of remaining open areas along the
    lagoon shore, general land use changes in the
    watershed

12
For 2004
  • Planned start of WP6 July 2004
  • Which models will be ready by then to apply
    different scenarios ?
  • Is it possible to have a common model ?
  • D19 a report of the effects of nutrient load
    changes in all sites (due in july 2005)
  • D20 a report of site-specific effects of other
    simulated environmental changes (due in july 2005)