Title: CMSD Master Planning


1
CMSD Master Planning
2
KEY POINTS
  • No schools to close for several years
  • All funding is tied to enrollment counts
  • The Master Plan will be reviewed and updated each
    year.

3
PRE ISSUE 14 (MAY 2001)
  • 2001 CMSD student enrollment was 77,000 students
  • There was a drastic need to fix crumbling
    buildings.Plain Dealer January 23, 2001.
  • OSFC Classroom Facilities Assistance Program was
    not in effect
  • Issue 14 raised 335 million to repair most
    drastic conditions (failed boilers, failed roof
    and windows, repair out of service plumbing and
    electrical equipment.
  • Charter School Enrollment was 2,887 students

4
POST ISSUE 14 PASSAGE
  • OSFC building condition assessments were
    completed January 2002
  • CMSD/OSFC Master Plan was agreed to May 2002
  • Master Plan enrollment multiplier was 72,500
    based on 2005/2006 projections
  • In 2004, the build out year was changed from 2005
    to 2015/16 state-wide
  • Cleveland Charter School enrollment grew to
    19,000 in 2007
  • State-wide urban enrollment demographics are
    triggering declines
  • Inflation factors have increased the cost of
    building schools

5
Critical District Master Planning Objectives
  • Strive to retain public school infrastructure to
    accommodate students returning to CMSD
  • Requires that the current tax rate for the
    Project be maintained (no increase in the tax
    rate is
  • anticipated)
  • Maximize number of neighborhood schools with
    attention on Academic Neighborhoods (defined as
    individual High School catchment areas)
  • Overwhelming percentage of K-8 students (at least
    95) to walk less than 1 mile along safe route to
    a new, renovated or maintained school
  • Create future flexibility for possible grade
    configuration changes with at least one large K-8
    in each academic neighborhood
  • Right size schools for the expected population
    with options to respond to both greater or lesser
    than expected enrollment in 2015-16
  • Strive for 1 geo-thermal heating system per
    academic neighborhood and design to LEED
    (Leadership In Energy Environmental Design)
    Objectives.
  • All schools will have Pre Kindergarten space
  • Provide for a 201 Student to Teacher ratio
    grades Pre-K thru Grade 3

6
Critical District Master Planning Objectives
cont.
  • No Schools to close for several years
  • Schools not receiving OSFC dollars will be
    maintained by the District
  • If enrollment grows, other schools can be added
    to the State co-funded construction program
  • Master Plan can be adjusted to changing
    enrollment or academic program information
  • Maintain all comprehensive High Schools
  • Focus on City-wide draw High Schools (Max Hayes
    and Cleveland School of Arts in Segment 5 with
    design beginning fall 2007)
  • CMSD stakeholders can help by
  • Listening understanding Master Plan information
  • Communicating concerns in a constructive manner
  • Working constructively to relocate during
    construction
  • Help in growing enrollment

7
Decision Factors
  • Enrollment Data
  • CMSD Factors
  • Regulations or Regulatory Policy Factors
  • Facility Assessment Factors
  • Funding Factors
  • Constructability Factors

8
Enrollment Data
  • Live Birth Data
  • District Enrollment Statistics
  • Community School Enrollment
  • Changes in Program Offerings
  • Change in Grade Configuration
  • Zoning Changes
  • Planned but not Built Housing
  • Open Enrollment Impact on One School to Another
  • Housing Activity
  • Boundary Adjustments
  • Pre-school Programs
  • Employment Shifts
  • Magnet/Charter/Private School - Opening or
    Closure

9
CMSD Factors
  • Current Building Capacity
  • Building Conditions
  • Legal Obligations NCLB IDEA
  • Labor Contract Obligations
  • School Distance
  • Student Transportation Needs
  • Strategic Planning Goals Objectives
  • Cost Management
  • Swing Space Availability User Acceptance
  • LFI Impact
  • Option School Expansion
  • Opportunity for Partnering with Other
  • Organizations
  • Neighborhood Student Enrollment
  • Academic Performance
  • Special Education Requirements
  • Safety Security Requirements
  • Safe Walking Routes
  • Nearby Schools Special Programs
  • Community Engagement Feedback
  • Community Use Plans
  • External Assistance Opportunities
  • Consequence to future administrations

NCLB - No Child Left Behind IDEA - Individual
with Disabilities Education Act
10
Regulations or Regulatory Policy Factors
  • Ohio Revised Code
  • Ohio School Design Manual
  • Ohio Basic Building Code
  • City of Cleveland Planning Commission
  • OSFC Career Technical Supplement
  • OSFC Policies
  • City of Cleveland Building Codes

11
Facility Assessment Factors
  • OSFC 2/3rds rule
  • City Landmarking of Buildings
  • OSFC 350 Rule
  • Facility Condition Index Learning Environment
    Ratings

12
Funding Factors
  • Construction Cost Determination
  • Regional Cost Trends
  • Determination of District Share
  • Project Cash Flow
  • Real Estate Acquisition Costs
  • Renovation Cost Determination
  • Construction Budget
  • District Funding Sources (Bonds, Donations)
  • Facility Condition Index
  • Availability of Local Funds

13
Constructability Factors
  • Greenfield or Brownfield Site
  • Neighborhood Infrastructure
  • Construction Market Conditions
  • Available Construction Capacity
  • Winter Conditions
  • Topography issues
  • Acreage Size to Support Total School Operations
  • Construction Footprint Space Availability
  • Real Estate Availability Acquisition Timing
  • Previous Construction Decisions
  • Opening Timing (new schools and swing sites)
  • Water, Electricity, Gas, Drainage Availability

14
Enrollment Projections
  • High School
  • Handout
  • K-8
  • Handout