Title: Systems and Communications


1
Systems and Communications
2
Introduction
  • Purpose Evaluate 627 AMSS Systems and
    Communications Hazards, Risks, and Mitigation
    Measures using ORM methods
  • ORM Team Leader Ms Alexis Baker
  • ORM Team Members
  • TSgt Oland Whitecotton, SE
  • SSgt Eric Sabin, SC
  • Mr. Steve Topliss

3
Six Step ORM Process
  • Identify Hazards
  • Assess Risk
  • Analyze Risk Control Measures
  • Make Risk Control Decisions
  • Implement Risk Controls
  • Supervise and Review

Team Used AF TRACS System To Document ORM
Analysis
4
Processes Analyzed and Evaluated
  • Receiving Equipment
  • Equipment Configuration
  • Issue and Distribution of Property
  • Equipment Repair
  • Customer Services
  • Plans and Projects

5
Step One Identify Hazards
  • Performed Task Analysis For Six Processes
  • Listed Steps In Each Process
  • Identified 28 Hazards
  • Analyzed Root Causes Of Hazards

6
Step Two Assess The Risks
  • For Each Hazard, ORM Team Assessed
  • Severity Of Loss Likely To Result From Hazard
  • Probability Hazard Could Cause That Result
  • TRACS Tool Automatically Generates Risk Level
  • Analysis Concluded 0 Low, 1 Medium, and 5 High
    Risk Processes

7
Step Three Analyze Risk Control Measures
  • Identified 31 Risk Control Measures
  • Used TRACS Tool To Determine Control Effects
  • Assessed Costs Of Implementation
  • ORM Team Recommends 21 Measures For
    Implementation
  • Risk Levels Following Implementation Reduced To 2
    Low, 3 Medium, and 1 High Risk Processes

8
Hazards and Risk Controls Customer Services
and Plans Projects
9
Hazards and Risk Controls Receiving Equipment
10
Hazards and Risk Controls Configuring
Equipment
11
Hazards and Risk Controls Issue and
Installation of Equipment
12
Hazards and Risk Controls Repairing Equipment
13
Summary
  • Systems and Communications ORM Team
  • Completed Steps 1-3 Of Six-Step ORM Process
  • Identified 28 Hazards Resulting In Risk
  • Recommended 21 Risk Control Measures
  • Identified Risk Control Measures Already In Place
  • Cost Of Implementations Range From Low-High
  • Some Operations Have Inherent Risk
  • Next Steps up To Squadron Leadership

14
QUESTIONS
?