Title: Emanuel Karantzoulis, Alessandro Fabris,


1
Status of Elettra
  • Emanuel Karantzoulis, Alessandro Fabris,
  • Sincrotrone Trieste, Trieste, Italy.

Acknowledgments S. Bassanese, P. Borsi, A.
Carniel, S. Krecic, M. Svandrlik, R. Visintini
2
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • OUTLINE
  • New injector
  • Pre-injector
  • Booster
  • Elettra performance and statistics
  • Conclusions

3
Overview /Pre-injector/Booster/Storage
ring/Conclusions
2008
2007
4
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • NEW ELETTRA INJECTOR
  • GENERAL PROJECT ASSESMENT
  • Project timeframe March 2005-March 2008.
  • Concluded on budget and on time.
  • 100 man-year of personnel matrixed to the
    project.
  • BOOSTER MILESTONES
  • Building construction September 2005 - July 2007
  • Installations April 2007 - August 2007.
  • Commissioning from September 2007.
  • First injection for users March 3rd, 2008 as
    planned.

4
5
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • Pre-injector energy 110 MeV maximum, 100 MeV
    operating
  • Operating improvements
  • Pre-injector synchronous with Elettra RF master
    oscillator.
  • Safe operating conditions of pre-injector during
    storms
  • power interruptions could damage the HV cabinet
    or klystron itself.
  • Interruption relay of HV modulator on UPS
  • Act on the thyratron trigger interlock time.
  • Work in progress ( to be completed in 2008)
  • Completion and test of spare modulator.
  • Construction of a spare gun.

Buncher direct and reflected power vs. RF freq.
Section direct and reflected power vs. RF freq.
5
6
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • Booster Operational Progress
  • Full energy injection at 2 GeV for users (March
    3) with 3 HC tuned (ramping frequency 1.5 Hz).
  • 2 GeV injection with IDs at user gaps (test).
  • Full energy injection at 2.4 GeV (April
    13-machine shifts).
  • Major dipole pwr converter fault (April 16).
  • Restored 2 GeV injection from August 29 (ramping
    frequency 2.4 Hz).
  • 2.4 GeV full energy injection (November 25).

6
7
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • Power converters status
  • Dipole 2.4 GeV _at_ 3 Hz will be tested in this
    run.
  • Quadrupoles 2.5 GeV _at_ 3 Hz reached.
  • Sextupoles delivered. To be tested on the load,
    we continue to operate with the spare corrector
    supplies.
  • Refurbishing activities (possible only during
    Elettra shutdowns)
  • Improved layout and cards to lower interference
    from EM noise, improve grounding, eliminate
    communication errors.
  • New IGBT trigger cards embedding low level
    protection to reduce number of failures and
    improve functionality.
  • Work in progress ripple and stability.

At present X10 above
At present X3 above
7
8
Overview /Pre-injector/Booster/Storage
ring/Conclusions
8
9
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • Maximum injection efficiency gt 95

1.0 Hz
Ratio 2.18 so 1.4/2.180.642 i.e 100
efficiency
  • Booster max current above design value (5
    mA/shot)

1.5 Hz
Again efficiency gt95
9
10
Overview /Pre-injector/Booster/Storage
ring/Conclusions
Impact on Elettra operation
0.75 or 0.9 GeV (accelerator physics time) for
SR-FEL and SISSI CIR
10
11
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • RF UPGRADE
  • One 150 kW plant (2 x 80 kW IOTs)
  • Upgraded one of the two transmitter with a new
    tube (TH793-1 from THALES) and circuit type
    assembly in October 08.
  • Up to now IOTs lifetime is not comparable with
    klystrons.

11
12
Overview /Pre-injector/Booster/Storage
ring/Conclusions
Up to date 3144 scheduled hours of user
operation out of a total of 4032 (77.9)
  • Up to date 3144 scheduled hours of user
    operation out of a total of 4032 (77.9)
  • Uptime 95.3 excluding storms, 91.9 including
    storms,

322 h
12
13
Overview /Pre-injector/Booster/Storage
ring/Conclusions
  • PRE-INJECTOR performs quite well, working to
    improve.
  • BOOSTER
  • PS are the major source of problems.
  • Next steps
  • Bring PSs in tolerances (and also any other
    system if necessary).
  • Complete instrumentation.
  • Increase stability and reliability.
  • Reach and establish operation at 3 Hz and 2.4
    GeV.
  • STORAGE RING
  • Elettra is already showing the beneficial signs
    of the full energy injection.
  • Next steps
  • Reduce refill times to 10 minutes (reduce ID
    gaps at injection, keep GOF on during refills).
  • Keep current above 200 mA (2 refills/day).
  • Dedicate more machine shift for studies to
    implement top-up.

13