1DUSEL Town Meeting and Workshop, Washington DC,
November 2-4, 2007
NNbar RD plans, cost and schedule
Yuri Kamyshkov / University of Tennessee
2February 9, 2006, Lead, SD (LOI 7)
Search for neutron ? antineutron transitions at
DUSEL
N-Nbar proto-collaboration
Goal is to build at DUSEL a vertical 1-km long
experiment with zero background that would be
factor of 1000 more sensitive than previous
expt. at ILL/Grenoble
3Recommendations of Homestake PAC in 2006 (LOI
7)
- NNbar can be in the first suit of DUSEL
experiments to be initialized ? 2011 - There are no previous NNbar-like experience and
tradition in US - It needs feasibility demonstrations and several
developments in the Early - Implementation Program to prepare a mature
proposal - We think these developments will be continued
S4 MREFC process
4Following PAC recommendations we formed a NNbar
RD Collaboration to pursue studies towards the
full proposal and technical design CSUDH,
Indiana U., NCSU, ORNL, U. Tennessee and CNA
Engineering number of consulting experts
- The team has experience and expertise in
- large projects construction (L3 Hadron
Calorimeter, KamLAND) - participation in large underground experiments
(UT, CSUDH) - large scale underground construction (CNA
Engineering MINOS,S1) - reactor licensing, commissioning, operations
(NCSU and ORNL) - cold neutron sources and cold neutron
experiments (IU, NCSU, UT) - neutron technologies like supermirrors and mag.
shield (IU, UT) - neutron transport simulations (NCSU, ORNL, UT)
- intranuclear NNbar transition search (CSUDH)
- particle detector design, construction,
simulations, cost estimate, etc.
5Collaboration plan includes (a) addressing
feasibility issues (show stopper and cost) in
2-years RD studies. RD proposal will be
submitted to NSF and DOE by Dec 3.
- Feasibility studies will include critical items
where demonstrations are required - construction issues of the km-long large
diameter vacuum tube with focusing reflector and
magnetic shielding inside vertical shaft - reactor issues configuration, performance,
licensing, ownership, safety, security, possible
backgrounds for DUSEL etc. - technological issues large-area supermirror
focusing reflector construction, large-volume
Earth magnetic field shielding down to nT-level - preliminary pre-conceptual system design, cost
estimate, and schedule - measurement of straightness of candidate shaft
and 3D mag. field components along the shaft
length, survey of existing vertical shafts at
Homestake. - EO for NNbar and reactor at DUSEL.
(b) after the feasibility demonstration continue
work towards full proposal and technical design
within MREFC development of the DUSEL scientific
program
6Preliminary Project Development Plan
construction feasibility
2015 ?
conceptual design
prelim design
board approve
construction
7Yates
Ross
8Is shaft 5 available ?
5 5137?
Yates
Ross
9calculated by Ken Ganezer
10(No Transcript)
11(No Transcript)
12- All technologies used by proposed NNbar
experiment exist. Challenge is - in the engineering implementation in the
large-size system - Engineering support from DUSEL is not yet
available - (like e.g. for FNAL-based experiments from
FNAL) - We are trying to team with the major National
Lab (LBL) for engineering - Will need help from DUSEL and SDSTA in
- survey of vertical shafts
- understanding of availability constraints
- measurements of shaft parameters
- understanding of infrastructure
connections - definition of access
- tuning of development plans
- connection to SD administration and
community for reactor issues - our outreach efforts in SD
13(No Transcript)
14(No Transcript)