Title: Tile fixing for commercial establishments
1Tile fixing for commercial establishments
2Why Industrial systems?
- We have no problem with the current
practice.!!! .. - Maybe its True.!
- But.Can it be better.?
3(No Transcript)
4(No Transcript)
5Areas for tiling
- Internal
- Flooring
- Decorative cladding
- Window and door frames
- Lift/Entrance lobbies
- Staircases
- External
- Cladding
- Entrance lobby and steps
- Decorative mosaic
- Utilities
- Toilets washrooms
- Storage
- Parking lots
- Water bodies
- Pantries
- Food section kitchens
6The Tiles
7Types
All materials do not adhere to cement the same
way!
- Tiles stones
- Ceramic
- Vitrified
- Glass
- Porcelain
- Terrazo
- Marble Granite
- Sandstone etc
8Porosity
9Size and Weight
- Large and Small
- Thick Thin
10Size variation
- Consequences
- Spoilt aesthetics
- Wastage
- Solutions
- Tile grouts
- Optimized layouts
- Camouflaging
11color variation
- Consequences
- Spoilt aesthetics
- Wastage
- Solutions
- Optimized layouts
- Camouflaging
12The environment
13Traffic
Light
heavy
medium
14Static Dynamic load
15The substrate
16Our Solutions
17The Right Solution for
Fixing any type of tile on any kind of substrate
18Things that matter in wonderful tiling
Location
Substrate
Tiles
Tile Adhesive
Tile Grout
Tools
19Adhesives Grouts
20Toilets and washrooms
- Points to ponder
- Maintenance
- Cleaning Frequency
- Cleaning agents
- Acid resistance
- Water resistance
21Low traffic areas - Foot Traffic only
- Points to ponder
- Slip Resistance
- Aesthetics
- Cleanliness
- Mopping and cleaning agents
22High Traffic Areas trolley storage movements
- Points to ponder
- Size of tiles
- Dynamic Loads
- Abrasion resistance
- Exposure to temperature variations
23Wall claddings
- Points to ponder
- Exposure to sun, wind and rain
- Fatigue
- Temperature variation
- Humidity and salinity
24Key considerations
Reliability
Quality Professionalism
25Costs
26Cost Per Square feet
Cost saved per day of work saved
Amount of material used and the cost of it!
Labor rate per sq.ft
27Time
- Faster
- Fixing technique
- Fixing tools
- Skilled/Experienced applicators
- Surface preparation
- Work organization
- Efficient resource utilization
- Lesser work
- Material Handling
- Storage
- Mixing
- Wastage
- Usage
- Rework
- Corrections
- Renovation
- Removal of old substrates
- Noise/debris
- Issues with disposal
28Material
Vs
- Quantity
- Storage
- Wastage
- Usage and coverage control
- Mix proportions
- Probability of human errors
29Labour
- Application skill
- Surface preparation
- Grouting
30Waterproofing for concrete
- Basement
- Lift pits
- Retaining and excluding walls
- Water tanks
- Sunken slabs
31What makes the difference
Right Process
Right Tools
Skilled Applicator
Right Material
Planning Organization of Work
32Costing
- Compare total proj costs cement v/s TA
33Concrete repair
- Band-Aid for construction site
- Filling up honeycombing
- Holes in concrete shuttering anchors
- Repairs of concrete chipping off
34Reliability
106 years of experienced nurtured and nourished
by a robust presence of 350 years!
35Quality Professionalism
- International standards
- World class Formulations
- Onsite and in-school training of applicators
- On-site support
- Professional support for optimizing tile fixing
costs
36So..When the stakes are high
PERFORMANCE Long lasting Problem-free
AESTHETICS Uniqueness in Design Visual Appeal
THOUGHT LEADERS Adoption of appropriate
technology technique Specifying the right
solutions
37 you can count on us !
38Right Products
39Application workshops- In school and on site
40Our Difference
41We will be glad to be of any assistancein
your way to wonderful tiling here in India
too!
42Thank You