Title: Power Plant Design, Technology and Economy
1Power Plant Design, Technology and Economy
- Power plant designs
- Options for Demo
- Starlite
- NIF and Inertial Fusion Energy Demo
- Material and component test facilities
- IFMTF
- Component test facility
- ST volumetric neutron source
- Fusion power plant economy
- ITER cost breakdown
- Assessment of Options for Attractive Commercial
and Demonstration Tokamak Fusion Power Plant,
Farrokh Najmabadi for the ARIES team, Fusion
Technology 30, 1286(1996) - Fusion Power Plant Economy,
- Ronald L. Miller for the ARIES team, Fusion
Technology 30, 1599(1996) - Key Issues for the Economic Viability of
Magnetic Fusion Power, - T.C. Hender. P.J. Knight, and I Cook, Fusion
Technology 30, 1605(1996)
2Cost of Electricity(COE)
COE Formula from standard accounting procedure
Parameters determining COE
3Parameters Determining the Cost of Electricity
4Cost of Electricity (COE)
5Cost Scaling of Structural Materials
6Cost Scaling
7COE for Different Wall Life
8COE for Tokamak Physics and Technology
- Present Physics and Technology
- Conservative assumptions adopted for ITER
- Optimal neutron wall loading 1.5 MW/m2
- Neutron fluence limit 6MWa/m2
- Present material OK
- Nominal Physics and Technology
- Higher elongation than ITER from 1.6 to 1.8
- Optimal neutron wall loading 2-2.5 MW/m2
- Neutron fluence limit 15MWa/m2
- Equivalent loading assumed in SEAFP
- Advanced Physics and Technology
- Neutron fluence limit 20MWa/m2
- Further material development required
- Optimal neutron wall loading 2.5-4.0 MW/m2
- Theoretically or transiently or not
simultaneously achieved
9Parameters for Different Tokamaks as Power Plants
10Comparison of COE for Different Tokamaks
11Comparison of COE for Different Power Sources
12Standard Cost Accounts I of NUWMAK
13Standard Cost Accounts II of NUWMAK
14Reactor Plant Equipments
15TF Magnet
16Determination of Power Plant Unit Size
17Breakdown of ITER Direct Capital Cost
ITER Construction Cost Direct Capital Cost
(3,012 kIUA), Personnel (477 kIUA), RD (70
kIUA), 1 kIUA 1 M US Dollar in January 1989
1.44 M US in 2003
18Possible sharing between Parties -1
19Possible sharing between Parties -2
20Possible sharing between Parties -3
21Possible sharing between Parties -4
22Possible sharing between Parties -5
23Possible sharing between Parties -6
24Possible sharing between Parties -7
25Possible sharing between Parties -8
26Possible sharing between Parties -9
27Possible sharing between Parties -10
28ARIES-AT Design (1000MWe)