Engineering Practices Working Group Accomplishments - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Engineering Practices Working Group Accomplishments

Description:

Provide integrated recommendations to Department of Energy ... April 21 & 22 (Bechtel SAIC Las Vegas, NV) Engineering Practices Working Group. Accomplishments ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 10
Provided by: hpb6
Category:

less

Transcript and Presenter's Notes

Title: Engineering Practices Working Group Accomplishments


1
Engineering Practices Working GroupAccomplishmen
ts Plans
  • John H. Gertsen
  • BWXT Y-12, L.L.C.

June 8, 2004
2
Engineering Practices Working Group
  • Purpose
  • Promote engineering excellence
  • Share best industrial practices
  • Apply lessons learned
  • Provide integrated recommendations to Department
    of Energy officials

3
Engineering Practices Working Group
  • Membership
  • 24 members
  • 23 DOE contractors
  • Three DOE sponsors (including NNSA and EM)
  • Two EFCOG board members

4
Engineering Practices Working Group
  • Status
  • Organized May 9, 2003
  • Charter approved May 14, 2003
  • Tom Stevens is sponsoring director
  • Meetings
  • July 16 (teleconference)
  • October 20 21 (Washington D.C.)
  • January 21 (teleconference)
  • April 21 22 (Bechtel SAICLas Vegas, NV)

5
Engineering Practices Working Group
  • Accomplishments
  • Published subject matter expert matrix
  • Facility commissioning study
  • Engineering metrics survey
  • Shared lessons learned/best practices
  • Three active subgroups
  • Fire Protection
  • Configuration Management
  • Engineering Standards

6
Engineering Practices Working Group
  • Accomplishments of Subgroups
  • Fire Protection Subgroup
  • Conducted two teleconferences and one meeting
  • Formed three task teams
  • Implementation of Reliability Centered
    Maintenance for Fire Systems Testing
  • Standardizing calculation of Maximum Potential
    Fire Loss (MPFL)
  • Benchmarking of Fire Protection Resources across
    the DOE Complex
  • Organized a review of DOE Order 420.1 by subgroup
    members and provided comments to DOE

7
Engineering Practices Working Group
  • Accomplishments of Subgroups
  • Configuration Management Subgroup
  • Conducted one teleconference and attended the
    10th annual Configuration Management Benchmarking
    Group (CMBG) conference
  • Redirected priorities and formed task team
  • Engineering Standards Subgroup
  • Subgroup in transition after formation of EPWOG

8
Engineering Practices Working Group
  • Current Initiatives
  • EPWOG Working Group
  • Design adequacy of existing safety systems
  • HEPA-filter testing within DOE
  • Engineering issues with third-party facilities
  • Engineering for design basis threat
  • Criteria for when engineering is needed for
    maintenance
  • Best practices in engineering
  • Subgroup Initiatives
  • Active involvement at DOE Fire Safety Workshop
  • Phase out methodology of configuration management
  • for DD projects
  • DOE contract for online national standards

9
Engineering Practices Working Group
  • Potential Future Initiatives
  • Exploring possible engineering conference
    (modeled after SAWG) in 1-2 years
  • Maintaining list of potential initiatives,
    including
  • Drawings/document control practices
  • Graded approach
  • Value engineering
  • DD technology
  • Cost drivers for engineering
  • Common itemapproved vendors list
Write a Comment
User Comments (0)
About PowerShow.com