Title: Brief Introduction of Building Legislation
1Brief Introduction of Building Legislation
-
- Ms. Anny Law
- Buildings Department
Pre-Qualification Structured Learning (PQSL)
Series
2Building Legislation
- Cap.123 Buildings Ordinance
- Cap.123A Building (Administration) Reg.
- Cap.123B Building (Construction) Reg.
- Cap.123C Building (Demolition) Reg.
- Cap.123F Building (Planning) Reg.
- Cap.123G Building (Private Streets and
Access Roads) Reg.
Pre-Qualification Structured Learning (PQSL)
Series
3Building Legislation (Cont)
- Cap.123H Building (Refuse Storage and Material
- Recovery Chambers) Reg.
- Cap.123I Building (Standards of Sanitary
- Fitments, Plumbing, Drainage Works)
- Reg.
- Cap.123K Building (Oil Storage Installations)
Reg. - Cap.123L Building (Appeal) Reg.
- Cap.123M Building (Energy Efficiency) Reg.
Pre-Qualification Structured Learning (PQSL)
Series
4Other Non-Statutory Tools
- Technical Memorandum
- Code of Practices
- Practice Notes for Authorized Persons and
Registered Structural Engineers (PNAP) - Practice Notes for Registered Contractors (PNRC)
Pre-Qualification Structured Learning (PQSL)
Series
5Building Control
- Safety and Health of the Built Environment
- Planning, design and construction of new
buildings and associated works - Rendering safe of dangerous existing buildings
and slopes
Pre-Qualification Structured Learning (PQSL)
Series
6System of Responsibilities
- Authorized Person (AP)
- Architect
- Structural Engineer
- Building Surveyor
- Registered Structural Engineer (RSE)
- Registered General Building
- Contractor (RGBC)
- Registered Specialist Contractors (RSC)
Pre-Qualification Structured Learning (PQSL)
Series
7Registered Specialist Contractors
- Demolition Works
- Foundation Works
- Site Formation Works
- Ventilation Works
- Ground Investigation Field Works
Pre-Qualification Structured Learning (PQSL)
Series
8Control and Monitoring of Construction Personnel
(BO Part I)
- Registration System
- Disciplinary Proceeding / Prosecution
- Appeal Mechanism
Pre-Qualification Structured Learning (PQSL)
Series
9Registration System
- Registration Committee (AP/RSE/RC)
- Register of AP/RSE/RGBC/RSC
- Registration Period (AP/RSE 1 year)
- Registration Period (RGBC/RSC 1 or 3 years)
Pre-Qualification Structured Learning (PQSL)
Series
10Duties of AP/RSE
- Supervise the carrying out of the building works
or street works in accordance with the
supervision plan - Notify the BA of any contravention of the
regulations which would result from the carrying
out of any works shown in any plan approved by
the BA in respect of the BW or SW and - Comply generally with Buildings Ordinance
Pre-Qualification Structured Learning (PQSL)
Series
11Duties of RGBC/RSC
- Provide continuous supervision to the carrying
out of the works in accordance with his
supervision plan - Notify the BA of any contravention of the
regulations that would result from carrying out
the works shown in the plan approved by the BA
for the works and - Comply generally with Buildings Ordinance
Pre-Qualification Structured Learning (PQSL)
Series
12Disciplinary Proceeding
- Disciplinary Board (AP/RSE/RGBC/RSC)
- BA bring to the notice of a DB on following
matters - Conviction of any offence
- Negligent or misconduct himself
- Matters related to supervision plans
Pre-Qualification Structured Learning (PQSL)
Series
13Disciplinary Proceeding (Cont)
- Power of DB
- Remove from the register
- Reprimand
- Fine a sum not exceeding 250,000
- Findings and order be published in Gazette
Pre-Qualification Structured Learning (PQSL)
Series
14Appeal Mechanism
- Decision made by BA in the exercise of a
discretion - Decision of the CRC
- Appeal Tribunal
- Court of First Instance
- Court of Final Appeal
Pre-Qualification Structured Learning (PQSL)
Series
15Control of Existing Building / Building Works (BO
Part II)
- Unauthorized Building Works
- Dangerous Buildings (Repair / Investigation)
- Dangerous Hillsides
- Defective Drainage
- Unauthorized Change of Use
Pre-Qualification Structured Learning (PQSL)
Series
16Control of New Building /Building Works
- Building works (prior approval and consent from
the BA) (BO Part II) - Exempted Building Works (prior approval and
consent is not required) (BO Part V) - Government Military Buildings
- Pubic Housings
- Village Dwellings
- Non-structural Alteration
Pre-Qualification Structured Learning (PQSL)
Series
17Control of New Building / Building Works
(Administration)
- Central Processing System
- Re-engineering the Building Approval Process
- Pre-submission enquiry and conference
- Simplified plan checking procedure
- Concept plan
- Minor amendments
- Fast track processing of minor A A works
- Statutory period
Pre-Qualification Structured Learning (PQSL)
Series
18Offences (Part IV)
- Examples, BO s.40(1), s.40(1B)(b), s.40(2A),
s.40(2B).. - Penalty
- Principal Fines
- Daily Fines
- Imprisonment
Pre-Qualification Structured Learning (PQSL)
Series
19Statutory Period - B(A)R
- Plan Approval
- New Submission / Major Revision 60 days
- Amendment 30 days
- Issue of Consent (28 days)
- Issue of Occupation of Permit / Temporary
Occupation Permit (14 days)
Pre-Qualification Structured Learning (PQSL)
Series
20Different Types of Plans B(A)R 8
- General Building plans
- Structural Plans (Foundation, Superstructure
Cladding etc.) - Drainage plans
- Site Formation plans
- Demolition plans
Pre-Qualification Structured Learning (PQSL)
Series
21Submission Procedures B(A)R
- Form BA 4
- Notice of appointment of AP and/or RSE
- Form BA 5
- Application for approval of plans of building
and/or street works and certificate of
preparation of plans - Form BA 6
- Stability certificate of AP and/or RSE
Pre-Qualification Structured Learning (PQSL)
Series
22Submission Procedures B(A)R
- Form BA 8
- Application for consent to the commencement and
carrying out of building works or street works - Form BA 10
- Notice of appointment of registered contractor,
notice of commencement of building works or
street works and undertaking by registered
contractor
Pre-Qualification Structured Learning (PQSL)
Series
23Submission Procedures B(A)R
- Form BA 13
- Certificate on completion of building works
resulting in a new building and application for
permit to occupy such building - Form BA 14
- Certificate on completion of building works not
resulting in a new building or of street works
Pre-Qualification Structured Learning (PQSL)
Series
24Fundamental Issues
- Development density
- Safety
- Health and Environment
- Other Important issues
- Fire Safety
- Town Planning Issue
- Disable Access
- Airport Height Restriction etc.
Pre-Qualification Structured Learning (PQSL)
Series
25Pre-Qualification Structured Learning (PQSL)
Series