http:www'linearcollider'orgcmspid1000106 - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

http:www'linearcollider'orgcmspid1000106

Description:

http://ilc-dms.fnal.gov/Workgroups/SMTF/ Collaboration Meetings/SMTF ... WG3: CW and beam testin we did not attend. WG4: PD we did not ... Air Scrubber. 6 ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 11
Provided by: haya96
Category:

less

Transcript and Presenter's Notes

Title: http:www'linearcollider'orgcmspid1000106


1
SMTF Meeting Report(Oct.5-7, 2005, FNAL)
  • http//www.linearcollider.org/cms/?pid1000106
  • http//ilc-dms.fnal.gov/Workgroups/SMTF/
    Collaboration20Meetings/SMTF20Collaboration20Me
    eting20Oct2052C62C7202005/

Oct. 14, 2005 KEK/ILC-Asia WG2 mtg Nobu Toge (KEK)
2
Meeting Outline
  • 3-day meeting at FNAL.
  • Plenary sessions
  • The first day opening.
  • The last day close-out
  • Otherwise, parallel sessions
  • WG1 cavities
  • WG2 cryomodules
  • WG3 CW and beam testin ? we did not attend
  • WG4 PD ? we did not
    attend
  • In addition,
  • Collaboration board mtg (first day late
    afternoon, with P.Oddone, B.Barish and G.Dugan)
  • Technical board mtg (second day noon)
  • Non-US participation
  • Asian N.Ohuchi (WG2), T.Saeki (WG1) and N.Toge
    (WG2)
  • European DESY, INFN, both direct presence and
    via video

3
SMTF Cavity Status (Mishra)
  • 4 units of TESLA design cavities from ACCEL (took
    6 mo to fab) now under mechanical meas/testing at
    FNAL.
  • They will be BCPed at Cornell and be tested at
    FNAL with the goal 25MV/m.
  • Then they will be EPed at Jlab and be tested FNAL
    with the goal 35MV/m.
  • 4 or 8 additional cavities from AES will follow
    the same path.
  • They will be dressed, horizontal-tested then
    installed in the first cryomodule.
  • Plan exists to augment the EP facility by
    building a new one at ANL for accelerating the
    loop of production-and-processing.

4
ACCEL Cavities _at_ FNAL
Delivery date September 09, 2005, fabrication
time 6 month
5
A Joint ANL/FNAL Processing Facility
Chemical Processing Rooms
Air Scrubber
6
SMTF Cryomodule Status (Mishra)
  • Conversion of DESY/INFN drawings (Type-III) into
    US system almost completed (keep metric scales
    adopt US-spec stock items).
  • Getting ready to start ordering parts.
  • Cryomodule Assembly Facility (CAF) currently in
    preparation at MP9 area (design done, orders been
    placed). It will be used to build the module
    above in FY06-07.

7
Cryomodule Assembly Facility (MP9)
  • Cavity will be dressed in CAF for horizontal
    test at Fermilab at PDTF.
  • Horizontally tested cavities will be assembled
    into a string at CAF.
  • Cryomodule fabrication takes place at CAF.
  • Single cryomodule will be tested at the ALCTF.

8
SMTF General (Lockyer)
  • In the process of sorting out
  • Relations of ILC/PD/RIA/CW components among SMTF
  • Relation of SMTF w.r.t GDE and world ILC
    activities in other regions.
  • Looking for a new name for the whole group
    (STELA?). And for individual projects (e.g.
    ILCTA, ILCTF etc)
  • Exploring ways to facilitate the growth of SRF
    capabilities in all three regions for ILC, e.g.
    three meetings per year with commonly shared
    agenda.

9
Toges Personal Remarks (1)- Observations -
  • There will be a big pressure to start serious
    international discussion in late 2005-early 2006,
    for the next-stage ILC cryomodule development.
  • NA group is trying to ready themselves for that.
  • Likely scenario
  • Formally start international design work in 2006,
  • intensity that in 2007, and
  • move on to the construction, assembly and testing
    following these.
  • Important prerequisites
  • NA and AS teams to rapidly accumulate experience
    and thoughts.
  • In case of AS, sufficiently strengthen the
    cryostat team.
  • GDE figures out how to institutionalize the ILC
    collaboration framework under GDE.

10
Toges Personal Remarks (2)- Possible Action
Items -
  • We should draft our Phase-2 cryomodule plan.
  • Straw-man version of next-stage cryomodule that
    we need towards ILC.
  • Pay attention to outcome at Snowmass2005, SMTF
    last week and BCD. If appropriate, submit inputs.
  • Determine how it relates to STF Phase-2
    cryomodule plan.
  • We should draft our international collaboration
    plan in FY2006 and beyond.
  • Technical aspects (e.g. what to build, how to
    test, what to verify)
  • Organizational aspects (e.g. how to discuss, how
    to share, how to parallelize)
  • We should submit proposals at Frascati and/or
    Bangalore, and take an initiative.
  • Do all three above, while keeping Phase-1 in pace
    and strengthening our SRF team particularly the
    cryostat area.
Write a Comment
User Comments (0)
About PowerShow.com