1SMTF Meeting Report(Oct.5-7, 2005, FNAL)
- http//www.linearcollider.org/cms/?pid1000106
- http//ilc-dms.fnal.gov/Workgroups/SMTF/
Collaboration20Meetings/SMTF20Collaboration20Me
eting20Oct2052C62C7202005/
Oct. 14, 2005 KEK/ILC-Asia WG2 mtg Nobu Toge (KEK)
2Meeting Outline
- 3-day meeting at FNAL.
- Plenary sessions
- The first day opening.
- The last day close-out
- Otherwise, parallel sessions
- WG1 cavities
- WG2 cryomodules
- WG3 CW and beam testin ? we did not attend
- WG4 PD ? we did not
attend - In addition,
- Collaboration board mtg (first day late
afternoon, with P.Oddone, B.Barish and G.Dugan) - Technical board mtg (second day noon)
- Non-US participation
- Asian N.Ohuchi (WG2), T.Saeki (WG1) and N.Toge
(WG2) - European DESY, INFN, both direct presence and
via video
3SMTF Cavity Status (Mishra)
- 4 units of TESLA design cavities from ACCEL (took
6 mo to fab) now under mechanical meas/testing at
FNAL. - They will be BCPed at Cornell and be tested at
FNAL with the goal 25MV/m. - Then they will be EPed at Jlab and be tested FNAL
with the goal 35MV/m. - 4 or 8 additional cavities from AES will follow
the same path. - They will be dressed, horizontal-tested then
installed in the first cryomodule. - Plan exists to augment the EP facility by
building a new one at ANL for accelerating the
loop of production-and-processing.
4ACCEL Cavities _at_ FNAL
Delivery date September 09, 2005, fabrication
time 6 month
5A Joint ANL/FNAL Processing Facility
Chemical Processing Rooms
Air Scrubber
6SMTF Cryomodule Status (Mishra)
- Conversion of DESY/INFN drawings (Type-III) into
US system almost completed (keep metric scales
adopt US-spec stock items). - Getting ready to start ordering parts.
- Cryomodule Assembly Facility (CAF) currently in
preparation at MP9 area (design done, orders been
placed). It will be used to build the module
above in FY06-07.
7Cryomodule Assembly Facility (MP9)
- Cavity will be dressed in CAF for horizontal
test at Fermilab at PDTF. - Horizontally tested cavities will be assembled
into a string at CAF. - Cryomodule fabrication takes place at CAF.
- Single cryomodule will be tested at the ALCTF.
8SMTF General (Lockyer)
- In the process of sorting out
- Relations of ILC/PD/RIA/CW components among SMTF
- Relation of SMTF w.r.t GDE and world ILC
activities in other regions. - Looking for a new name for the whole group
(STELA?). And for individual projects (e.g.
ILCTA, ILCTF etc) - Exploring ways to facilitate the growth of SRF
capabilities in all three regions for ILC, e.g.
three meetings per year with commonly shared
agenda.
9Toges Personal Remarks (1)- Observations -
- There will be a big pressure to start serious
international discussion in late 2005-early 2006,
for the next-stage ILC cryomodule development. - NA group is trying to ready themselves for that.
- Likely scenario
- Formally start international design work in 2006,
- intensity that in 2007, and
- move on to the construction, assembly and testing
following these. - Important prerequisites
- NA and AS teams to rapidly accumulate experience
and thoughts. - In case of AS, sufficiently strengthen the
cryostat team. - GDE figures out how to institutionalize the ILC
collaboration framework under GDE.
10Toges Personal Remarks (2)- Possible Action
Items -
- We should draft our Phase-2 cryomodule plan.
- Straw-man version of next-stage cryomodule that
we need towards ILC. - Pay attention to outcome at Snowmass2005, SMTF
last week and BCD. If appropriate, submit inputs. - Determine how it relates to STF Phase-2
cryomodule plan. - We should draft our international collaboration
plan in FY2006 and beyond. - Technical aspects (e.g. what to build, how to
test, what to verify) - Organizational aspects (e.g. how to discuss, how
to share, how to parallelize) - We should submit proposals at Frascati and/or
Bangalore, and take an initiative. - Do all three above, while keeping Phase-1 in pace
and strengthening our SRF team particularly the
cryostat area.