MPF(F) Mobile Landing Platform - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

MPF(F) Mobile Landing Platform

Description:

Platform. Program Status. Description. Issues. Program of ... Medical Capability 1,281 ft2; 4 Ward Beds. Potable Water 200,242 gal. Surface Interface Point 2 ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 2
Provided by: Ouime
Category:
Tags: mpf | beds | landing | mobile | platform

less

Transcript and Presenter's Notes

Title: MPF(F) Mobile Landing Platform


1
Mobile Landing Platform (MLP)
Platform
Description
Speed 20 kts Transit
Waterline (Loaded) 25.2 ft Crew
55 (MSC), 11 (LCAC Det) Embarked Landing
Force 856 (128 Navy 728 USMC) Medical
Capability 1,281 ft2 4 Ward Beds Potable
Water 200,242 gal Surface Interface Point 2 Well
Deck Capacity 6-LCAC Flight Deck
(Level/Class) 1 Land/Launch Spot (I/2) VERTREP
lift Spot (I/4) UAS Adjacent Space 1000
ft2 Ramp 1 Self-depl LMSR/MLP Veh 1 Portable Veh
access Vehicle Square (Ro/Ro) 51,560 ft2 (Stowage
for50 ISO 1CC Containers) Lifting Capability
(lbs) 1 52.9K single boom container crane,130
lift radius 2 22K extended boom stores crane
(port/stbd) 2 11K bridge cranes (LCAC lanes)
(port/stbd) Cargo Fuel (JP-5) 1 mil gal Motor
Gasoline (MOGAS) 550 gal (jettisonable drums)
3 MLP New Design and Build
MPF(F) MLP VS(1) Requirements Validation Study
February 6, 2008 Placemat
Program Status
Issues
  • Program of Record is for 3 ships
  • Key Sea Basing Enabler
  • Use of Float On Float Off (FLO/FLO) Commercial
    technology
  • TEU handling Capability added
  • Will Require additional C4I upgrades to support
    MEB CE and Air Space Management task if Big
    Decks are omitted
  • Vehicle Transfer System (VTS) is new technology
  • CDD Increment 1
  • JCB 13 Feb 2008 Approved
  • JROC Approval March 2008
  • DAB Jun 2008 (Pending ADM signature)
  • Acquisition strategy approved Supports RFP Jul
    2008
  • Systems Design Award 15 Sep 2008
  • Milestone B FY10
  • Procurements
  • 1 (FY10) Delivery (FY15)
  • 2 (FY12) Delivery (FY16)
  • 3 (FY13) Delivery (FY17)
  • Ship 2 3 funding addressed during POM-10

6-4
Write a Comment
User Comments (0)
About PowerShow.com