Title: Section Objectives
1- Section Objectives
- After completing this section, you should be able
to - 1. Explain the importance of capacity planning.
- 2. Discuss ways of defining and measuring
capacity. - 3. Describe some of the factors that determine
effective capacity. - 4. Discuss the major considerations related to
developing capacity alternatives. - 5. Describe approaches that are useful for
evaluating process selection and capacity
alternatives.
2- Capacity
- Definition
- The amount of output generated by a production
system over some interval of time. - Defined by
- 1. Resources available - e.g. 2,000 direct labour
hours per year - 2. Output capabilities - e.g. 5,000 widgets per
month - Capacity depends on
- 1. Resources - input availability
- 2. Product mix - a different mix redefines
capacity - 3. Technology - degree of capital investment
- 4. Time frame - capacity is influenced by the
time frame used to measure it
- Significance of Capacity Decisions
- 1. Commitment to satisfy market demand for
specific outputs - 2. Commitment to provide employment for labour
force. - 3. Major capital investment for the organization.
- 4. Inaccuracy of long-term demand forecasts
limits capacity decisions. - 5. Incorrect capacity decisions can be costly to
the organization.
3- Difficulties in Measuring Actual Capacity
- 1. Diversity of output mix
- single output - use output measure of capacity.
- multiple outputs - use input measure of capacity
- 2. Specification of time interval representing
real capacity - maximum capacity
- normal capacity
- short-range, intermediate-range and long-range
capacity - 3. Day-to-day variation
- employee absenteeism
- equipment breakdown
- maintenance and repair
- work setups / changeovers
- employee vacations
4Measuring Capacity Illustration 1
A grocery store has five regular checkout lines
and one express line(12 items or less). Based on
a sampling study, it takes 11 minutes on average
for a customer to go through the regular line and
4 minutes to go through an express line. The
store is open from 9 a.m. to 9 p.m. daily, seven
days a week. A) What is the stores maximum
capacity? B) What is the capacity if the number
of regular checkout lines operating is according
to the following schedule?(The express
line is always open.) Hour / Day Mon. Tue. Wed.
Thur. Fri. Sat. Sun. 9 - 12 1 1
1 1 3 5 2 12 - 4 2 2
2 2 3 5 4 4 - 6 3 3
3 3 5 3 2 6 - 9 4
4 4 4 5 3 1
5Efficiency and Utilization
6Efficiency/Utilization Example
- Design capacity 50 trucks/day
- Effective capacity 40 trucks/day
- Actual output 36 units/day
- Actual output 36
units/day - Efficiency 90
- Effective capacity 40
units/ day -
-
- Utilization Actual output 36
units/day 72 - Design capacity
50 units/day
7Measuring Capacity - Illustration 2
A roller coaster at Treasure Island Amusement
Park consists of 15 cars, each of which can
carry up to 3 passengers. If each run takes 1.5
minutes and the time to unload and load riders is
3.5 minutes, what is the maximum capacity of the
system in number of passengers per hour? Would
the actual capacity observed actually equal this
value? Explain.
Measuring Capacity - Illustration 3
An automobile transmission-assembly plant
normally operates one shift per day, 5 days a
week. During each shift, 400 transmissions can
be completed. Over the next 4 weeks, the plant
has planned shipments according to the following
schedule Week 1 2 3
4 Shipments 1800 1700 2200 2100
a. What is the normal capacity? b. At what
percent of capacity is the plant actually
operating?
8Measuring Capacity - Illustration 4
A company manufactures 4 products on 3 machines.
Production for the next six months is given
below Product Jan Feb Mar Apr
May June 1 200 0 200 0 200 0 2 100 100
100 100 100 100 3 50 50 50 50
50 50 4 100 0 100 0 100 0
The number of hours each product requires on each
machine is given in the following table
Product
Machine 1 2 3 4 1 0.25 0.15 0.15 0.25
2 0.33 0.20 0.30 0.50
3 0.20 0.30 0.25 0.10
Setup times are 20 of operation times. The
number of machine hours available in next 6
months are
Machine Jan Feb Mar Apr May June
1 120 60 60 60 60 60 2 180 60 180 60 180 60
3 120 60 120 60 120 60
Determine if there is enough capacity to meet
product demand.
9- Definitions of Long-Range Capacity
- 1. Production Capacity - The maximum production
of an organization. - 2. Maximum Practical Capacity - that output
attained within the normal operating schedule of
shifts per day and days per week while bringing
in high-cost, inefficient facilities. - 3. Output Rate Capacity - a measure of production
capacity based on an organizations outputs. e.g.
automobiles per month. - 4. Aggregate Unit of Capacity - a measure of
production capacity that is used when an
organizations outputs are diverse. e.g. sales
dollars per month, tons per month, or other
measures of capacity. - 5. Input Rate Capacity - a measure of production
capacity based on an organizations inputs. e.g.
available seat-miles per month. - 6. Percentage of Capacity Utilization - a measure
of production capacity based on the relative
outputs generated per inputs required in some
time period. e.g. actual number of automobiles
produced divided by the quarterly automobile
production capacity, or the number of
labour-hours used during the month divided by the
number of labour-hours available in the work
force.
10- Facility Planning
- Principle 1 Production units(plants) have an
optimal rate of output for minimum cost. This
is frequently known as the best operating level.
Short-Run Average Cost
Volume
Principle 2 Minimum cost and optimal operating
rate are functions of the size of a production
unit. This is known as economies of scale.
Long-Run Average Cost
Volume
11SHORT-TERM CAPACITY ADJUSTMENT
Increase Capacity
Decrease Capacity
Type of System
Hire Employees Add Shifts Overtime Subcontract Dep
lete Inventory Defer Maintenance Standardize
Output
Layoff Employees Reduce Shifts Reduce
Workweek Shutdown Facilities Lease
Facilities Employee Attrition
Manufacturing Systems
Hire Employees Overlap Shifts Change Workforce
Mix Overtime Offload Activities Defer Maintenance
Standardize Output
Fire / Layoff Employees Reduce Work
Schedules Shutdown Facilities Lease
Facilities Employee Attrition
Service Delivery Systems
12- Ways of Changing Long-Range Capacity
- Expand Capacity
- 1. Subcontract with other companies to become
suppliers of the expanding firms components or
entire products. - 2. Acquire other companies, facilities or
resources. - 3. Develop sites and / or buildings or buy
equipment. - 4. Expand, update or modify existing facilities.
- 5. Reactivate facilities that are on a standby
basis. - Reduce Capacity
- 1. Sell existing facilities, sell inventories and
layoff or transfer employees. - 2. Mothball facilities and place on standby
status, sell inventories and layoff or transfer
employees. - 3. Develop and phase in new products as other
products decline.
13Changing Capacity - Illustration 1
A small firm intends to increase capacity of a
bottleneck operation by adding a new machine.
Two alternatives, A and B, have been identified,
and the associated costs and revenues have been
estimated. Annual fixed costs would be 40,000
for A and 30,000 for B variable costs per unit
would be 10 for A and 12 for B. Revenue per
unit would be 15 for A and 16 for B. a.
Determine each alternatives breakeven point in
units. b. At what volume of output would the two
alternatives yield the same profit? c. If
expected annual demand is 12,000 units, which
alternative would yield the higher profit?
Changing Capacity - Illustration 2
A producer of pottery is considering the addition
of a new plant to absorb the backlog of demand
that exists. The primary location being
considered will have fixed costs of 9,200 per
month and variable costs of 70 cents per unit
produced. Each item is sold to retailers at a
price that averages 90 cents.
a. What volume per month is necessary in order to
break even? b. What profit would be realized on a
monthly volume of(1)61,000 units? (2) 87,000
units?
14LONG-TERM CAPACITY EXPANSION
Advantages
Disadvantages
Capacity Expansion
- Minimizes Immediate Capital Investment - Less
Risk / Cost of Over-forecasting Demand
- Higher Cost per Sq. Ft. for Construction -
Inflationary Pressures on Future Construction -
Unable to Handle Unexpected Demand - Higher Cost
per Unit of Output(?)
Small Increments
- Lower Cost per Sq. Ft. for Construction -
Absorb Demand Increases Beyond Estimates - Lower
Cost per Unit of Output(?)
- Requires Large Capital Investment - Opportunity
Cost of Investing in Excess Capacity - Higher
Risk / Cost of Over-Forecasting Demand
Large Increments
15- Algebraic C-V-P Analysis
- The calculation of the breakeven point is not
easily done using a graph. It is more easily
done by using a formula. The following formulas
are available - Breakeven point (units) FC / (P V)
- Where FC fixed costs
- P selling price per unit
- V variable cost per unit
The owner of Old-Fashioned Berry Pies is
contemplating adding a new line of pies, which
will require leasing new equipment for a monthly
payment of 6,000. Variable costs would be 2.00
per pie, and pies would sell for 7.00 each. How
many pies must be sold to breakeven? Solution
FC 6,000 VC 2 per pie
SP 7 per pie Breakeven point
(units) 6,000 / (7 2) 1,200 pies/month
Example 1 Breakeven Point in Units
16- Algebraic C-V-P Analysis - continued
- The breakeven point can also be calculated in
dollars. This calculation is particularly useful
where the ratio of variable cost to selling price
is given. - Breakeven point (dollars) FC / 1 (V/P)
- Where FC fixed costs
- V/P ratio of variable costs to selling price
Jimmy Stevens, Inc has fixed costs of 10,000
this period. Variable costs, consisting of
direct labor and materials, are 60 percent of
selling price. What is the breakeven point in
dollars? Solution FC 10,000
V/P 60 Breakeven point (dollars)
10,000 / (1 - .60) 25,000
Example 2 Breakeven Point In Dollars
17- Indifference Point Total Costs
- The procedure
- 1. Select the alternatives to be compared 2 or
more. - 2. Identify the fixed and variable costs for
each alternative. - 3. Let X the output level that is, the volume
that produces equal costs between two
alternatives. - 4. Calculate the indifference point between pairs
of alternatives as follows - FC(A) VC(A) X FC(B) VC(B) X
- Where
- FC(A) the fixed costs for Alternative A
- VC(A) the variable cost per unit for
Alternative A - FC(B) the fixed costs for Alternative B
- VC(B) the variable cost per unit for
Alternative B - X the output level that produces
equal total costs for both alternatives -
18- Indifference Point Profit
- The procedure
- Select the alternatives to be compared 2 or
more. - Identify the selling price and fixed and variable
costs for each alternative. - Let X the output level that is, the volume
that produces equal costs between two
alternatives. - Calculate the indifference point between pairs of
alternatives as follows - SP(A) VC(A X - FC(A) SP(B) VC(B X -
FC(B) Where - SP(A) the selling price per unit for
Alternative A VC(A) the variable cost per unit
for Alternative A - FC(A) the fixed costs for Alternative A
- SP(B) the selling price per unit for
Alternative A FC(B) the fixed costs for
Alternative A - VC(B) the variable cost per unit for
Alternative A - X the output level that produces
equal total costs for both alternatives
19Long-Term Capacity Planning - Illustration 1
The ABC Company has a cost of capital of 10 and
projected sales increases of Year Sales
Growth 1 1,000 2 2,000 3 4,000 4 7,000 5 10,000
The company can either add a single expansion of
24,000 units today or an expansion of 8,000 units
today and another expansion of 16,000 units at
the end of Year 3. The respective costs are
outlined below
Average Operating Cost per Unit per Year
Unit Expansion Investment Cost
A B A B
Year
A B
1 2 3 4 5
24,000 8,000 600,000 240,000 16,000 (end of
Year 3) 430,000
18 17 15 15 12 17 10 12 18 19
Which alternative is preferred?
20Long-Term Capacity Planning - Illustration 2
The DEF Company has a cost of capital of 14 and
projected annual sales of Year Sales
1 1,000 2 2,000 3 4,000 4 6,500
5 9,500 6 13,000 36,000
The company can add capacity in either two or
three increments with the following costs
Average Operating Cost per Unit per Year
Unit Expansion Investment Cost
A B A B
Year
A B
0 1 2 3 4 5 6
11 12 10 12 11 10 8 10 7 8 8 8
5,250 3,000 200,000 135,000 5,000 275,000
9,750 475,000 7,000 425,000
Which alternative is preferred?
21Waiting Lines
- Queuing theory Mathematical approach to the
analysis of waiting lines. - Goal of queuing analysis is to minimize the sum
of two costs - Customer waiting costs
- Service capacity costs
22Implications of Waiting Lines
- Cost to provide waiting space
- Loss of business
- Customers leaving
- Customers refusing to wait
- Loss of goodwill
- Reduction in customer satisfaction
- Congestion may disrupt other business operations
23Queuing Analysis
Figure 19-1
Total cost
Customer waiting cost
Capacity cost
Total cost
Cost
Cost of service capacity
Cost of customers waiting
Optimum
Service capacity
24System Characteristics
- Population Source
- Infinite source customer arrivals are
unrestricted - Finite source number of potential customers is
limited - Number of observers (channels)
- Arrival and service patterns
- Queue discipline (order of service)
25Elements of Queuing System
26Queuing Systems
Multiple channel
Multiple phase
27Poisson Distribution
Figure 19-4
28System Performance
Measured by
- Average number of customers waiting
- Average time customers wait
- System utilization
- Implied cost
- Probability that an arrival will have to wait
29Waiting Time vs. Utilization
Figure 19-6
30Queuing Models Infinite-Source
- Single channel, exponential service time
- Single channel, constant service time
- Multiple channel, exponential service time
- Multiple priority service, exponential service
time
31Queuing Models
- Single channel, exponential service time
- Single channel, constant service time
- Multiple channel, exponential service time
- Multiple priority service
32Priority Model
33Finite-Source Queuing