Title: N43 Overview Brief to N4
1Aviation Readiness Branch OPNAV N432
2N432 - Aviation Readiness Branch
N432 CAPT Robert Buckley Aviation Readiness
Branch Head
N432S Mrs. Lorri Smith
N432B Mr. C. W. Furlow
N432A CDR Jane Conley Depot Maintenance
N432G LCDR Ellen Evanoff Air Equipment Maint
N432C LCDR Joseph Rodriguez Air System Support
N432D LtCOL Robert Darling Flight Hour Program
N432D1 VACANT Asst. FHP R.O.
N432A1 CDR Bill Beacham Asst. Depot Maintenance
N432G1 Mr. Chris Borer Asst. S.E./A.S.S. (Ktr)
N432D2 Vacant FHP Supply Liaison
N432E CDR Steve Riley Air Traffic Control
N432F Mr. Bob Miller Air Launch and Recovery
Equipment
N432D3 Ms. Amy Fowler FHP Analyst (Gov)
N432D4 Mr. Raymond Davids Asst. FHP (Ktr)
OPNAV CIVILIAN STAFF (BLUE) NON OPNAV CIVILIAN
STAFF (GREEN) OPNAV MILITARY STAFF
(PURPLE) CONTRACTOR (BROWN)
3N432 Aviation Readiness Branch
- Responsibility/Advocacy
- Aviation Readiness Requirements, Capability
Assessment and Validation Sponsor - Coordination/Validation of Fleet/NAVAIR
Contingency/Supplemental requests - Naval Aviation Enterprise (NAE)
- Initial Operational Capability Supportability
Review (IOCSR) - Navy Tactical Command Support System (NTCSS)
- Optimized NALCOMIS - Naval Aviation Logistics
Command Management Information System (OOMA/OIMA) - Aviation Maintenance applications in DON
Application Database Management System (DADMS) - Joint Strike Fighter (JSF) Logistics/Sustainment
Planning - Requirements Generation (FY06 - 6.8B)
4N432 Resource Sponsorship
FY06 Program Summary TOA 6.8 Billion
Source 06 OSD Budget Submission
5N432G Resource Sponsorship
FY07 Program Summary TOA 209M
Source 06 OSD Budget Submission
6The Link MPF to N43 SE Rework
- 300.9M (FY07-FY11)
- Budget line items affected
- Appropriation 1C7C, line item SE Rework Depot
Overhaul - PE 0702207N
7Aviation Support Equipment Requirements
Methodology
Support Equipment Requirements
Document (SERD)
ASE Reconstitution
End Article to be Repaired
ASE Master Plan
SE Inventory Allowancing and Management
Control Database
Logistics Support Analysis/Maintenance Plan
ASE Inventory Requirement
OPTEMPO, DPG, WPSD
AIRCRAFT INVENTORY (PAA)
Activity SE Allowance (IMRL)
IMRL
Provisioning Data
FLEET
Executive Engagement
CNO
NAVAIR
NAVICP
8Aviation Support Equipment Rework Assessment
Methodology
Budget Control Totals
CNO Goals
PRICES
Service Level Assessment
Requirement Development Process
Cyclic Maintenance
Field Team Assists
Funded Requirements
Unscheduled Rqmts
Support Equipment Allowance
SQD Allowance
Deferred Maintenance
Ship Allowance
Shore Allowance
Support Equipment Inventory
9SEDRAM Pricing and Costing Timeline Organic
Example
APR 04
AUG 04
SEP 04
OCT 04
Review Historical Data Develop WLS Package
AIR 6.0 Review SEMS Data, examine justifications
for variance
AIR 6.0 WLS Guidance to SE Rework
AIR 6.0 Accept Proposed Prices
WLS Workload Standard SEMS Support Equipment
Management System
10 N432 BACKUP