Group%20of%20companies%20 - PowerPoint PPT Presentation

About This Presentation
Title:

Group%20of%20companies%20

Description:

Food industry end-to-end solutions ('Global Logistic' Ltd) ... Automobile transport. Special and farming. plant techniques. Equipment. Commercial real estate ... – PowerPoint PPT presentation

Number of Views:57
Avg rating:3.0/5.0
Slides: 20
Provided by: Superu7
Category:

less

Transcript and Presenter's Notes

Title: Group%20of%20companies%20


1
Group of companies PROEKT ROSTA
  • Togliatti

2
Development stages
  • The date of CJSC Polair Lizing foundation -
    03.10.1997
  • 2001 CJSC Polair Lizing majority ownership
    (74) sold to CJSC FIA-Bank (Togliatti)
  • 2001-2006 Proactive development period,
    companies group foundation
  • 2005 by RA Ekspert estimation, company fits
    in TOP 100 Russian leasing companies and takes
    87th place (by result on 9 month of 2005)
  • 2006 companies groups new house style
    creation PROEKT ROSTA
  • 2007 by RA Ekspert estimation, company fits
    in TOP 100 Russian leasing companies and takes
    80th place

3
Our opportunities
Leasing
Logistics
Project approach
4
Our projects
With authorized capital stock sharing Finance lease) (CJSC LC Proekt Rosta, LC Rost Ltd) Cars shipping (CJSC Transmet) Food industry end-to-end solutions (Global Logistic Ltd) Railway transportation (Forvard Trans Servis Ltd, Logistika Rosta Ltd)
Without authorized capital stock sharing Gold-mining ( Proekt Gold Ltd, Proekt PlusLtd) Oil casinghead gas processing (GlobatekLtd)
5
Finance lease
6
Portfolio structure
Agricultural equipment 4
Automobile transport 16
Industrial equipment 12
Railway transport 11
Telecommunications equipment 4
Equipment for mining operations 44
Other equipment 15
Other equipment 22
Vehicles 31
Railway rolling-stock and drag-out stock 6
Motor transport 26
Equipment for food industry, incl.
refrigerating 3
Cars 2
Special-purpose equipment for housing and
communal services 4
7
CJSC LC Proekt Rosta market position
  • Product
  • Financial lease
  • Automobile transport
  • Special and farming
  • plant techniques
  • Equipment
  • Commercial real estate

Price One of the lowest and competitive on the
market
  • Promotion
  • - Direct sales
  • Participation in exhibitions
  • and seminars
  • Information support
  • Place
  • Togliatti, Samara region
  • Ulyanovsk region
  • Sakha-Yakutiya Republic
  • Mordovian Republic
  • Moscow
  • St.-Petersburg
  • With gradual advancement
  • to other regions

8
Competitive advantage
Experience
Flexible rate
One window principle
Individual approach to a client
Reduced registration order
Speed
9
Car shipping CJSC Transmet
  • Established in 1999
  • Realizes road transportation, has long-term
    experience on car shipping market, including
    foreign markets
  • Has licenses for Russian and international
    shipments, all kind of insurance, including
    freight
  • Full member of ASMAP since 2006
  • Fleet of 25 own, 20 leasehold
  • Has own repair base with guarded parking place

10
CJSC Transmet partners
JSC AVTOVAZ
JSC AvtoVAZtrans
CJSC Concern UkrAvtoProm
Ltd Avtologistika
Ltd Transmash
11
Activity orientation
Refrigerating and quick-freezing equipment
selection and sales
Meat- and fish-processing equipment sales
Cold-storage warehouses installation on turnkey
Logistics services. Delivery on any conditions,
suitable for client
Guarantee maintenance and after-sale service
Equipment acquisition by leasing
12
Activity geography
SUPPLIERS
CLIENTS
Russia
Kazakhstan
Poland
Russia
Turkey
Italy
Ukraine
Slovakia
France
Moldavia
Germany
Georgia (Abkhazia)
Belarus
13

Competitive advantages
Providing the whole complex of services
(designing, sales, delivery, assemblage, backup
and support manning)

Providing choice of a supplier for a client
Individual approach to a client
Flexible payment system
Decreasing goods cost due to optimal transport
logistics
Adjusted service systems work in regions
14
Railway transportation Ltd Forvard Trans
Servis, Ltd Logistika Rosta
  • Ltd Forvard Trans Servis established in 2005
  • Main activity categories are 2 following
    Railway cars lrnd-lease and railway transporting
    of freight (molding sand) on Russian Federation
    territory
  • Has 33 railway cars for cement transporting, 42
    cars are leased with companies group Proekt
    Rosta, 70 cars are leased with CJSC VKM-Trans,
    13 cars with LLC Sovmestnaya Transportnaya
    Gruppa
  • Since 2007 is main shipper of molding sand on
    railway transport from manufacturer CJSC
    Balasheyskye Peski

LLC Logistika Rosta established in 2007 Main
enterprise activity is lease holding of railway
cars for cement transporting and boxcars
15
Railway transportation Ltd Forvard Trans
Servis, Ltd Logistika Rosta
Suppliers Clients
Hopper cars Cars leasing OJSC Salavatsteklo LtdNerudniye stroitelniye materialy
OJSC Ruzhimmash (Mordovian Republic) OJSC Krykovsky vagonostroitelniy zavod (Ukraine) Molding sand and other freight transporting OJSC KAMAZ-Metallurgiya Ltd Lebedyansky mashinostroitelniy zavod Ltd Borets CJSC Ruslich Ltd MC Investprom
Boxcars Different freight transporting CJSC Metallurgicheskiy zavod Petrostal OJSC Nizhnekamskneftekhim OJSC Nefrit Keramika Ltd SoyuzBaltKomplekt
- OJSC Azovobschemash (Ukraine) OJSC Makfa OJSC Baltika

16
Railway cars cost dynamics
  • Hopper cars for cement transporting, model
    19-1217 by TU 3182-108-00217403-2005, OJSC
    Ruzhimmash production
  • Hopper cars for cement transporting, model 19-758
    by ?U U 3.06-05763814-211-2000, OJSC Krykovsky
    vagonostroitelniy zavod (Ukraine) production
  • All-metal boxcars model 11-1880-01 by TU U
    35.2-32258888-5602005, OJSC Azovmash
    production (Ukraine)

Car cost (rub.), incl. VAT
June 2008
January 2008
August 2007
March 2007
Car cost (rub.), incl. VAT
June 2008
January 2008
August 2008
Car cost (rub.), incl. VAT
June 2008
January 2008
August 2007
March 2007
17
CJSC Globotek. Oil casing-head gas processing
complex
  • Unlike traditional oil casing-head gas (OCSHG)
    processing methods,
  • supposing gas-main pipeline and nodal
    large-capacity gas-processing stations
  • construction, CJSC Globotek proposes modular
    mobile complexes installation
  • directly in OCSHG formation places.

Middle booster station
Middle booster station
GLOBOTEK complex
OCSHG
- available gas pipeline
GLOBOTEK complex
- necessity of pipeline construction
GLOBOTEK complex
In June 2007 first OCSHG processing module mobile
complex with capacity of 20 mln. cubic metre
OCSHG annually was put in operation.
18
Complexs producible materials
  • Complexs operational principles separation of
    gas mixtures by a cryogenic condensation method.

Benzine gas stable (BGS), oil raw materials,
removal by motor transport
Gas pipeline
Natural gas fuel (NGF)
OCSHG
Complex
Generator
Methanol
Car propane butane (CPB), motor fuel, removal by
motor transport
In June 2007 first OCSHG processing module mobile
complex with capacity of 20 mln. cubic metre
OCSHG per annum was put into operation.
19
Main advantages of technology
  • Practically-tested
  • Minimum area preparation for complex placement,
    no need in capital construction
  • Block-module performance, allowing to keep on
    technology process in 100 load, removing
  • or adding separate blocks
  • Possibility of quick processing complex (or its
    part) redeployment to another OCSHG source
  • Placement in immediate vicinity of raw materials
    source (100-200 meters)
  • Full autonomy
  • Low energy cost per unit for manufacture
    production
  • Short terms and low costs (7-9 rubles per 1 cubic
    metre OCSHG per annum) of complex construction
  • Fast projects payback
Write a Comment
User Comments (0)
About PowerShow.com