Title: A1258608668Zixyp
1Six Sigma
6s
2Dilbert
3Introduction
6? new world
s is the symbol for the standard deviation. 6s
is equivalent with 3.4 defects per million
opportunities.
- Hooving 30 m2 on 6s -level means only 1 cm2
missed. - 1/3.4 million part of the day equals 0.29 second
- 1/3.4 million part of the equator of the earth
equals about 140 meter.
4Statistical background
T
o
l
e
r
a
n
c
e
U
S
L
L
S
L
/
-
3
s
1
3
5
0
1
3
5
0
p
p
m
p
p
m
0
.
0
0
1
0
.
0
0
1
p
p
m
p
p
m
N
o
m
i
n
a
l
m
/
-
6
s
5Statistical background
T
o
l
e
r
a
n
c
e
U
S
L
L
S
L
1
.
5
s
3
.
4
6
6
8
0
3
p
p
m
p
p
m
0
p
p
m
3
.
4
p
p
m
m
/
-
6
s
6What is Six Sigma?
- Simple
- Eliminate defects
- Eliminate the opportunity to have defects
- Complex
- Vision
- Metric (Standard measuring method)
- Benchmark
- Philosofy
- Method
- Tool for
- Customer satisfaction
- Breakthrough improvements
- Continuous improvement
- Employee involvement
- Agressive goals
7Six Sigma is everywhere
Service
Design
Management
Purchase
Six Sigma Methods
Administration
Production
IT
Quality Depart.
HRM
M S
8Uniform standard
Sigma-metric
Current standard
World class
9Financially interesting
Benefits of 6s approach w.r.t. financials
10Why improvement?
Process step
Client
Inspection
Input
good products
The hidden factory
11Six Sigma
Companies implementing Six Sigma
- Motorola (1987)
- Texas Intruments en DEC (1988)
- IBM (1989)
- AlliedSignal en Kodak (1994)
- General Electric (1995)
- Whirlpool, Bombardier en Polaroid (1996)
- Sony, Citibank (1997)
- Paccar-DAF Trucks, Black Decker (1998)
- Perlos, American Express (1999)
- Ford (2000)
12Six Sigma
A scientific and practical method to achieve
improvements in a company
- Scientific
- Structured approach.
- Assuming quantitative data.
- Practical
- Emphasis on financial result.
- Start with the voice of the customer.
Show me the data
Show me the money
13Method
DMAIC
14Method
Focus on the process
Y f(X1, X2, , Xn)
Output
Inputs
Process
Caffeine f(DCM, time to extract, number of
extracts, temperature, )
15New way?
Approach to improve
Statistical problem
Praktical problem
Y f(X1, X2, , Xn)
Praktical solution
Statistical solution
16Define
- Projects may be selected according to
- A complete list of requirements of customers.
- A complete list of costs of poor quality.
- A complete list of existing problems or targets.
17Priorities
3
2
1
1.Collect data
2.Arrange the information
- 3.Give priority
- Financial benefits
- Expected throughput time of the project
- Severity of the problem
1. Requirements, 2. Costs, 3. Problems.
18Six Sigma
Characteristics involved
Y f(X1, X2, , Xn)
Critical to Quality (External) Critical to
Quality (Internal)
- Influence factors
- Process parameters
- Disturbances
- Noise variables
19Example
Coffee beans
Roast
Cool
Grind
Moisture content
Pack
Sealed coffee
20Measure
Measure
- Concrete the problem
- Establish how to measure in the process
- Investigate the demands (USL, LSL)
- Evaluate the measurement method.
21Measure
USL
4.5
4.0
Moisture
? ? ? ? ? ? ? ? ? ? ? ? ?
22Analyse
Analyse
- Study the current performance of the process
- Determine the kind of problem
- Identify the influence factors.
23Analyse
To run experiments one needs a process which is
in statistical control.
SPC
DoE
24Control chart, Cp, Cpk
Process Capability study
Identify Xs
Identify Xs
Multi-vari, Trendgraph
FMEA, Control chart
Select Xs
Select Xs
FMEA, Data
Testing- theory
Improvements
Experiment
Improve
Assure, Control loop
Control
25Analyse
26Analyse
27Analyse
28Three types of influence factors
Caffeine content of Extracted coffee
Caffeine raw coffee
Stuffed-up filter
Time to extract
Processparameter
Noise variable
Disturbance
May be used to control.
Undesirable sources of variation.
Outliers, incidents
29Improve
Improve
- Run a statistical experiment
- Determine which influence factors are really
important - Model the relationship with the CTQ.
30Improve
Moisture 16.57 0.023?B 0.025?G
0.0003?B?G
31Control
Control
- Implement improvements
- Use the relationship to define an optimal
process - Design a system to assure the improvements.
32Control
Before
s 0.19
33Organisation
34Persons
Champion
- Belongs to management
- Selects projects
- Gives priority
- Solves bottlenecks
- Is willing to change
- Has social skills
- 1 day training
- Is responsible for the BB project w.r.t. the
organisation
35Persons
Black Belt
- Belongs to the middle management
- Is well-educated
- Project is related to daily activities
- May prioritise his work
- Enough motivation
- Willing to change
- Has good social skills
Improvement potential 50 000
36BB training
Define
Throughput time project
4 months (full time)