1
BioWire Progress ReportWeek Two
  • Orr Ashenberg, Patrick Bradley, Connie Cheng,
    Kang-Xing Jin, Paula Nunes, Danny Popper, Sasha
    Rush

2
What we did last week
  • Ordered BioBricks
  • Experiments
  • Miniprepped the BioBricks
  • Modeling
  • Photolithography

3
Modeling
4
Photolithography
  • Went through microprinting process for mammalian
    cells in Kits lab.
  • Still checking out specific proteins to use in
    modifying process for E. Coli (mannose to adhere,
    BSA to resist adhesion)
  • In process of finding out CAD rules to design our
    own masks and stamps.

5
Update on the Weiss Circuit
  • They are working on the same PPG (propagating
    pulse generator) design as us.
  • They have simulations done, but no experimental
    data.
  • Their simulations show potential back-propagation
    and self-signaling.

6
New Ideas
  • Have two signaling mechanisms to create circle or
    line oscillator
  • Lux with either Las or Rh1
  • Would require two routers to receive the old
    signal and begin the new one.
  • Challenges Designing another signaling pathway,
    crosstalk
  • Use one signaling pathway to create line
    oscillator
  • Bounce the pulse through the wire with delays on
    the ends
  • Use an intracellular lactonase
  • Allow for faster AHL degradation to reduce noise
    and potential back-propagation.

7
Schedule (old)
  • Week 1 (6/6) Project Choice and Design
  • Week 2 (6/13) Test AHL receiver/sender
  • Week 3 (6/20) Test senderreceiver and repressor
  • Week 4 (6/27) More tests
  • Week 5 (7/4) Finish testing
  • Week 6 (7/11) Test cell signaling density
    photolithography done
  • Week 7 (7/18) Construct IFFL (incoherent
    feed-forward loop)
  • Week 8 (7/25) Test it
  • Week 9 (8/1)
  • Week 10 (8/8)
  • Week 11 (8/15)
  • Week 12 (8/22)

8
Schedule (new)
  • Week 1 (6/6) Project Choice and Design
  • Week 2 (6/13) Got parts and set up tests
  • Week 3 (6/20) Get remaining parts Test all
  • Week 4 (6/27) Tests we couldnt get to last week
  • Week 5 (7/4) Finish testing
  • Week 6 (7/11) Test cell signaling density
    photolithography done
  • Week 7 (7/18) Construct IFFL
  • Week 8 (7/25) Test it
  • Week 9 (8/1)
  • Week 10 (8/8)
  • Week 11 (8/15)
  • Week 12 (8/22)