Nicholas C Thompson, Senior Partner - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

Nicholas C Thompson, Senior Partner

Description:

Nicholas C Thompson, Senior Partner – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 40
Provided by: rec
Category:

less

Transcript and Presenter's Notes

Title: Nicholas C Thompson, Senior Partner


1
INTELLIGENT GREEN HOUSING Lessons from the UK
Nicholas C Thompson, Senior Partner Cole
Thompson Anders Architects, London Co-Founder
INTEGER Intelligent Green
2
Environmental Housing Political background
  •    

Climate change International pressure Kyoto,
etc Millennium Fever INTEGER, Greenwich,
etc Eco- Homes, Code for Sustainable Homes,
Buildings Regulations From voluntary codes to
legislation New housing, existing housing
l l l l l l
3
Key design technical issues
  • Passive energy insulation, shading, ventilation
  • Renewable energy bio-mass, solar, wind
  • Water rainwater, grey-water, fittings
  • Materials timber frame, green roofs, natural
    materials
  • Construction foundations, panel systems, pods,
    dry construction
  • Technology controls, communications care

4
How to make change happen
  •    

Get the best ideas, design solutions,
technologies Involve the whole industry
researchers, builders, suppliers Create
Demonstration Projects Use the media to spread
the message Let politicians support legislative
change
l l l l l
5
Changing Perceptions of High Rise
6
Examples
1
2
3
4
5
6
1. Integer Tower, Hong Kong 2. Newcastle, New
Cruddas Park 3. The Harbour, Poplar 4. Barking
The Vertical Village 5. Glastonbury House,
Westminster 6. Kentish Town, Hawkridge House
7
Integer Hong Kong
  • Objectives
  • Re-invent high rise!
  • More flexible space
  • Smarter technology
  • Better environmentally
  • Cleaner, faster, safer construction
  •    

l l l l l
8
Integer Tower, Hong Kong
Solutions Modular construction   Sky
gardens Orientation, shading Insulation Energy
heating, cooling, power Water saving    Waste
recycling
l l l l l l l
9
Newcastle, New Cruddas Park
Objectives Estate Regeneration   Social
mix Security Micro-climate Building
fabric Environmental performance   
l l l l l l
10
Newcastle, New Cruddas Park
Solutions New housing to balance social
mix   Eyes on the street Security Sheltered
micro-climate Insulated over-cladding Integrated
architecture   
l l l l l l
11
The Harbour, Poplar
Objectives Maximise density   Sheltered leafy
environment Best orientation / aspect Lively
commercial block Tranquil residential
blocks Code 4 performance   
l l l l l l
12
The Harbour, Poplar
Solutions 200 flats   2 new courtyards plus
park Sheltering Harbour block 3 residential
ships E/W orientation Balconies Bio-mass
heating   
l l l l l l l
13
Barking The Vertical Village
Objectives 200 flats   Shops offices Code
level 4 Solutions South-facing wedge Openable
glazed balconies Roof gardens, sky
lounge Bio-mass heating   
l l l l l l l
14
Kentish Town Hawkridge House
Objectives Upgrade 1960s 15 storey student
block   Building regulations performance Concrete
decay solution Replace services  Upgrade
kitchens and bathrooms Remove balconies Overclad
with acrylic render
l l l l l l l
15
Glastonbury House, Westminster
  • The Challenge
  • Comprehensive and radical refurbishment of a 22
    storey residential tower
  • Keep elderly residents on site throughout
  • Minimise disruption
  • Achieve Eco Homes Very Good environmental
    performance

l l l l
16
The Problems
  • Infrastructure to be replaced lifts, building
    services, etc
  • Kitchens and bathrooms to be upgraded
  • Service supplies to be maintained throughout
  • Disruption to residents to be minimised
  • Ground floor public facilities to be upgraded
  • Main boilers obsolete

17
Our Approach
  • Fully Integrated Team (FIT)
  • 8 consultation workshops with all stakeholders
  • Regular meetings with tenants steering group
  • Demonstration flats and exhibition
  • Service supplies to be maintained throughout
  • Visual reality models
  • Questionnaires and surveys
  • 1 on 1 consultation

18
Design Evolution
  • Ambitious brief Stripped down version Completed
    project

19
Design Evolution
  • Skylounge
  • Sketch model Planning scheme Completed project

20
Typical Floor
21
Service Strategy
22
Virtual Reality Model for Residents Choice
23
Press Button for Colour Change
24
Keeping Disruption to a Minimum
  • Design - External service riser, surface run
    services, minimum demolition
  • Management - Use of voids as hotel flats,
    option of return to own flat or transfer
  • Construction - Multi-skilled construction teams,
  • 3.5 week turn around
  • Social - Continuing close consultation with
    residents

25
Before
Bathrooms
After
26
Before
Kitchens
After
27
Technology Controls, Communication Care
  • Controls
  • Flexible accessible cabling for future upgrade
  • Simple heating controls including TRVs
  • Communication
  • Broadband Internet connection to each flat
    facilitated
  • Better TV reception shared aerials/ dishes
  • Lowest cost telephony, free within block
  • Door access video entry system
  • Care
  • New care alarm system
  • Remote monitoring water/ electricity

28
Environment
  • Sustainability, low energy, water and waste,
    sustainable materials
  • Eco-Homes Very Good standard achieved
  • Low energy Balcony enclosure, cavity insulation,
    better heating controls, district heating,
    photovoltaics, provision for wind turbine
  • Water Provision of shower heads, water
    restrictors,
  • dual/low flush WCs 2.5/4L
  • Waste Waste separation on site
  • Materials Linoleum not pvc flooring, recycled
    plastics,
  • sedum roof to wind skirt, improved
    landscaping
  • FSC PFEC certified timber

29
(No Transcript)
30
Photovoltaic Panels
31
Passive vents pull air from bathrooms not
electric fans
Passive Ventilation
32
Water Issues
  • Low flush /dual flush toilets
  • Showers and shower heads
  • Water restrictions
  • Flood warning devices

33
Balconies and Wind
  • New frameless glazing to balconies,
  • fully openable
  • Creates winter gardens
  • Wind skirt canopy with lining turf roof and
    photo-voltaic panels deals with hostile
    micro-climate

34
Top Floor
  • Liberate redundant boiler room
  • Create sensational sky lounge

Sky Lounge
35
The Sky Lounge
36
The Sky Lounge
37
Happy Team, Happy Residents!
38
Key Issues for Delivering Green Housing
  • Use the industry, media and politics
  • Create a popular movement for change
  • Identify best ideas, design solutions,
    technologies
  • Build demonstration projects, then change the law
  • Enjoy a greener future!

39
Thank you for listening!
Write a Comment
User Comments (0)
About PowerShow.com