Title: Nicholas C Thompson, Senior Partner
1INTELLIGENT GREEN HOUSING Lessons from the UK
Nicholas C Thompson, Senior Partner Cole
Thompson Anders Architects, London Co-Founder
INTEGER Intelligent Green
2Environmental Housing Political background
Climate change International pressure Kyoto,
etc Millennium Fever INTEGER, Greenwich,
etc Eco- Homes, Code for Sustainable Homes,
Buildings Regulations From voluntary codes to
legislation New housing, existing housing
l l l l l l
3Key design technical issues
- Passive energy insulation, shading, ventilation
- Renewable energy bio-mass, solar, wind
- Water rainwater, grey-water, fittings
- Materials timber frame, green roofs, natural
materials - Construction foundations, panel systems, pods,
dry construction - Technology controls, communications care
4How to make change happen
Get the best ideas, design solutions,
technologies Involve the whole industry
researchers, builders, suppliers Create
Demonstration Projects Use the media to spread
the message Let politicians support legislative
change
l l l l l
5 Changing Perceptions of High Rise
6Examples
1
2
3
4
5
6
1. Integer Tower, Hong Kong 2. Newcastle, New
Cruddas Park 3. The Harbour, Poplar 4. Barking
The Vertical Village 5. Glastonbury House,
Westminster 6. Kentish Town, Hawkridge House
7Integer Hong Kong
- Objectives
- Re-invent high rise!
- More flexible space
- Smarter technology
- Better environmentally
- Cleaner, faster, safer construction
-
l l l l l
8Integer Tower, Hong Kong
Solutions Modular construction Sky
gardens Orientation, shading Insulation Energy
heating, cooling, power Water saving Waste
recycling
l l l l l l l
9Newcastle, New Cruddas Park
Objectives Estate Regeneration Social
mix Security Micro-climate Building
fabric Environmental performance
l l l l l l
10Newcastle, New Cruddas Park
Solutions New housing to balance social
mix Eyes on the street Security Sheltered
micro-climate Insulated over-cladding Integrated
architecture
l l l l l l
11The Harbour, Poplar
Objectives Maximise density Sheltered leafy
environment Best orientation / aspect Lively
commercial block Tranquil residential
blocks Code 4 performance
l l l l l l
12The Harbour, Poplar
Solutions 200 flats 2 new courtyards plus
park Sheltering Harbour block 3 residential
ships E/W orientation Balconies Bio-mass
heating
l l l l l l l
13Barking The Vertical Village
Objectives 200 flats Shops offices Code
level 4 Solutions South-facing wedge Openable
glazed balconies Roof gardens, sky
lounge Bio-mass heating
l l l l l l l
14Kentish Town Hawkridge House
Objectives Upgrade 1960s 15 storey student
block Building regulations performance Concrete
decay solution Replace services Upgrade
kitchens and bathrooms Remove balconies Overclad
with acrylic render
l l l l l l l
15Glastonbury House, Westminster
- The Challenge
- Comprehensive and radical refurbishment of a 22
storey residential tower - Keep elderly residents on site throughout
- Minimise disruption
- Achieve Eco Homes Very Good environmental
performance
l l l l
16The Problems
- Infrastructure to be replaced lifts, building
services, etc - Kitchens and bathrooms to be upgraded
- Service supplies to be maintained throughout
- Disruption to residents to be minimised
- Ground floor public facilities to be upgraded
- Main boilers obsolete
17Our Approach
- Fully Integrated Team (FIT)
- 8 consultation workshops with all stakeholders
- Regular meetings with tenants steering group
- Demonstration flats and exhibition
- Service supplies to be maintained throughout
- Visual reality models
- Questionnaires and surveys
- 1 on 1 consultation
18Design Evolution
- Ambitious brief Stripped down version Completed
project
19Design Evolution
- Skylounge
- Sketch model Planning scheme Completed project
20Typical Floor
21Service Strategy
22Virtual Reality Model for Residents Choice
23Press Button for Colour Change
24Keeping Disruption to a Minimum
- Design - External service riser, surface run
services, minimum demolition - Management - Use of voids as hotel flats,
option of return to own flat or transfer - Construction - Multi-skilled construction teams,
- 3.5 week turn around
- Social - Continuing close consultation with
residents
25Before
Bathrooms
After
26Before
Kitchens
After
27Technology Controls, Communication Care
- Controls
- Flexible accessible cabling for future upgrade
- Simple heating controls including TRVs
- Communication
- Broadband Internet connection to each flat
facilitated - Better TV reception shared aerials/ dishes
- Lowest cost telephony, free within block
- Door access video entry system
- Care
- New care alarm system
- Remote monitoring water/ electricity
28Environment
- Sustainability, low energy, water and waste,
sustainable materials - Eco-Homes Very Good standard achieved
- Low energy Balcony enclosure, cavity insulation,
better heating controls, district heating,
photovoltaics, provision for wind turbine - Water Provision of shower heads, water
restrictors, - dual/low flush WCs 2.5/4L
- Waste Waste separation on site
- Materials Linoleum not pvc flooring, recycled
plastics, - sedum roof to wind skirt, improved
landscaping - FSC PFEC certified timber
29(No Transcript)
30Photovoltaic Panels
31Passive vents pull air from bathrooms not
electric fans
Passive Ventilation
32Water Issues
- Low flush /dual flush toilets
- Showers and shower heads
- Water restrictions
- Flood warning devices
33Balconies and Wind
- New frameless glazing to balconies,
- fully openable
- Creates winter gardens
- Wind skirt canopy with lining turf roof and
photo-voltaic panels deals with hostile
micro-climate
34Top Floor
- Liberate redundant boiler room
- Create sensational sky lounge
Sky Lounge
35The Sky Lounge
36The Sky Lounge
37Happy Team, Happy Residents!
38Key Issues for Delivering Green Housing
- Use the industry, media and politics
- Create a popular movement for change
-
- Identify best ideas, design solutions,
technologies -
- Build demonstration projects, then change the law
- Enjoy a greener future!
39Thank you for listening!