TWSTFT - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

TWSTFT

Description:

Angela McKinley, Eric Newman, Blair Fonville, Alan Smith, Demetrios Matsakis. PTB: ... Five sessions with different setup configurations. UTC(PTB) - MC2(USNO) ... – PowerPoint PPT presentation

Number of Views:66
Avg rating:3.0/5.0
Slides: 12
Provided by: ptb3
Category:
Tags: twstft | maser

less

Transcript and Presenter's Notes

Title: TWSTFT


1
TWSTFT
USNO
TWSTFT between USNO and PTB
TWSTFT Working Group Meeting 14-15 October
2004 Tokyo Dirk Piester
2
TWSTFT
USNO
TWSTFT between USNO and PTB
USNO Angela McKinley, Eric Newman, Blair
Fonville, Alan Smith, Demetrios
Matsakis PTB Jürgen Becker, Thomas Polewka,
Andreas Bauch, Dirk Piester
3
TWSTFT
USNO
number of sessions per day nominal 24 mean 2002 2
2.3 2003 19.6 2004 20.4 total 20.2 standard
deviation around daily linear regression mean 2002
0.514 ns 2003 0.314 ns 2004 0.241
ns total 0.310 ns
X-band link USNO-PTB
4
USNO
TWSTFT
Two USNO calibration exercises at PTB in 2004
First exercise 8-10 March Five sessions with
different setup configurations UTC(PTB) -
MC2(USNO) X-band - trav. st. 1.2 ns Ku-band -
trav. st. 1.7 ns
Ku-band
X-band
trav. st.
5
USNO
TWSTFT
USNO calibration exercises at PTB in 2004
Second exercise 20-21 September (preliminary
results) UTC(PTB) - MC2(USNO) X-band - trav. st.
1.3 ns Ku-band - trav. st. 16.1 ns
Ku-band const.
X-band
trav. st.
6
USNO
TWSTFT
USNO calibration exercises at PTB in 2004
Second exercise 20-21 September (preliminary
results) UTC(PTB) - MC2(USNO) X-band - trav. st.
1.3 ns Ku-band - trav. st. 16.1 ns
X-band
trav. st.
7
USNO
TWSTFT
USNO calibration exercises at PTB in 2004
March 2004 Sept. 2004 Difference X-band -
trav. st. 1.2 ns 1.3 ns 0.1 ns Ku-band - trav.
st. 1.7 ns 16.1 ns 14.4 ns
X-band link calibration verified below one
nanosecond Ku-band link recalibrated
8
USNO
TWSTFT
Transponder change on the transatlantic Ku-band
link
Ku-band calibration recoverable UTC(PTB) -
MC2(USNO) UTC(PTB) - MC2(USNO) - 14.4
ns Right graph shows effect of the 14.4 ns on
NIST/PTB data.
9
USNO
TWSTFT
Long term comparison of Ku-band with X-band
Since 2002 four successful transatlantic
calibration campaigns were performed by USNO.
10
USNO
TWSTFT
Long term comparison of Ku-band with X-band
X-band bridged with TAIP3
annual periodicity visible in double difference
Ku-band - X-band peak-to-peak amplitude 1.1
ns periodicity 359 days
11
USNO
TWSTFT
H-maser and link stability
Relative frequency instability derived from
X-band raw data and double difference Ku-band -
X-band MC2(USNO) - UTC(PTB) in the period from
December 2003 until September 2004
Write a Comment
User Comments (0)
About PowerShow.com