Title: STAM project Crossing over water


1
STAM project Crossing over water
2
  • LOCATION

3
  • LOCATION

4
  • Research and concept vision
  • Phase 1 week 1-3
  • history
  • policy
  • Potential of area / market research
  • Image of the area
  • Fitting off the area into the city of Amsterdam
  • Fitting off the area into the IJ-oevers
  • Program / spotplan
  • Result concept vision of the area

5
  • Phase 2 (week 4-10)
  • Choose
  • Object based approach
  • (music Hall)
  • Area based approach
  • (Crossing over water)

6
Object based approach
7
Phase 2 Object based approach week 4-10
  • The Music hall/BIMhouse
  • The design is ready, but this building only
    accommodates activities during the evening. This
    will lead to exploitation problems. In addition,
    these kind of cultural activities are strongly
    dependent on government subsidizing (National and
    rural). This is slowly ending.

8
Phase 2 Object based approach week 4-10
  • Assignment Analyze this problem like similar
    institutes and make a proposition, based on the
    masterplan from phase 1, for the adjustment of
    the design to make it financially more
    independent. This adjustments must cover at least
    4000 m² gross floor area and must intervene with
    the existing building (at least 30)
  • The plan must be elaborated into an initial
    design for all disciplinesAO, BTO, CO, FAGO and
    UT. 4 A0-panels and a model must be made, plus a
    report must per discipline.

9
Urban context in the future
Area based approach
10
Phase 2 Area based approach week 4-10
  • In the context of urban developments, this area
    is interesting because it is a large void between
    the central station area and the new IJ-oever
    area on the Oostelijke Handelskade. It means
    that the urban development design also must take
    place on water and rail.
  • Assignment Create an urban design with an
    architectural elaboration and a check of the
    financial feasibility.

11
Phase 2 Area based approach week 4-10
  • Final vision and product
  • Morphology of the area
  • Programme and building design and area design
  • Desired character of the location
  • Design
  • Exploitation/ feasibility analysis
  • Urban design
  • Feedback

12
Tutoring
  • Students who wish to speak with a tutor can visit
    a teacher during the tutoring appointments on
    Tuesday morning at floor 4. The tutoring consists
    of so-called 10-minutes conversations. Student
    must make an appointment for these meetings by
    subscribing on a list at the secretariat of urban
    development and management on floor 8. The
    teachers except the students to come prepared
    with questions on one A4.
  • Teachers are
  • - Ingrid Janssen/Stephan Maussen MS
  • - Sophie Rousseau/ Hans Snijders SA
  • - Irene Curuli/Gerald Lindner AT TM
  • - Julietta Zanders SA