Title: Experience from the New LEIR Controls during Machine Commissioning


1
Experience from the New LEIR Controls during
Machine Commissioning
  • V.Baggiolini, M.Pace, S.Jensen

2
Outline
  • LEIR machine in a nutshell
  • LEIR controls
  • Remarkable features
  • Challenges
  • Experience from the commissioning
  • Conclusion

3
LEIR in the Ion LHC Injector Chain
(LEP)
LHC
LEIR Low Energy Ion Ring
4
The LEIR Layout
Ejection line
RF
Main Dipoles
Injection line
Upgraded LEAR into LEIR
5
Outline
  • LEIR machine in a nutshell
  • LEIR controls
  • Remarkable features
  • Challenges
  • Experience from the commissioning
  • Conclusion

6
Remarkable Features
  • Major constraints
  • Inheriting controls designed for the LHC
  • Inheriting unified controls from the merge of 2
    Control Groups
  • Keeping legacy controls from existing PS
    accelerators
  • A test-bed for new standard solutions in view of
    LHC
  • Used for the 1st time under operational
    conditions
  • To be deployed in LHC its pre-injectors at
    later stage
  • An anticipated challenge for the CO Group

7
Challenges
  • Technical challenges
  • Customize enhance functionalities of LHC
    controls
  • Practically validate LHC controls
  • Deploy unified controls from two Control Groups
  • While respecting a tight schedule
  • Cultural challenges
  • Define a unique strategy from similar (but
    different) solutions and habits on both sides
  • Set-up productive developer teams
  • Convince Operation to use new tools and methods

8
Experience during CommissioningTechnical
Perspective
  • Front end hardware
  • Front end software
  • Application software
  • Timing sequencing
  • General services
  • Alarms
  • Analogue signals

TH2.3-70
TH3A.1-50
9
Front End Hardware
  • LHC standard technology for all VME machines
  • Wiener Crates hosting CES PowerPC RIO2/3
    processor
  • Compatible with legacy technology
  • Legacy technology for almost all VME modules
  • Except new timing receiver module designed for
    LHC
  • Experience during commissioning
  • Successful smooth operation from the start-up

10
Front End Software
  • New Front-End Software Architecture
  • Complete framework for Real-Time software
    development
  • Same device software development for all
    accelerators
  • Compliant with the legacy infrastructure kept for
    certain devices
  • Experience during commissioning
  • Framework proved efficient and adequate
  • Major progress compared to old FE software
    environment
  • Main functionalities in place and validated
  • Late delivery of some features
  • Lack of stability reliability in the
    operational environment

FR1.2-50
11
Application Software
TU1.3-50 TH1.4-80
  • Adaptation of new LHC Applications to LEIR
  • Developed for LHC, to be customized for LEIR
  • Replace existing X/Motif applications suitable to
    Operation
  • Experience during development
  • Adaptation to LEIR relatively easy thanks to a
    good design
  • Adaptation made LHC Applications more complete
  • Experience during commissioning
  • More advanced functionality
  • Not all old functionality yet available -
    ergonomically not fully satisfactory

12

Application Software - contd
  • Java re-write of legacy generic applications
  • Same functionality but completely new
    implementation
  • Integrate both new and legacy equipment below
  • Experience during development
  • New implementation profited from years of
    experience with old X/Motif version ? Better
    design and implementation
  • Tough implementation task because new underlying
    controls infrastructure was unreliable and kept
    changing
  • Experience during commissioning
  • No added value for users (compared to old
    proven X/Motif version) ? Perceived as a step
    back because less mature

13
Timing Sequencing
  • Integration in the general timing system driving
    all CERN accelerators
  • Enhancements to cover specific operation modes
  • As stand alone mode (N0 extraction from LEIR)
  • Extensions made compliant with LHC
  • Experience during commissioning
  • Successful and smooth operation from the start-up
  • Confirmation of selected infrastructure
  • Validation of enhancements in view of LHC

14
Experience during CommissioningCultural
perspective
  • Unfavorable Operation context
  • All LEIR operators from a unique culture
  • No LEIR operator participation in the
    applications development
  • Some reluctance from OP to adopt new tools
    habits
  • Fruitful experience for Controls Operation
  • Cross pollination between new and legacy controls
  • Collaboration is an excellent catalyst for the
    merging of the 2 departments
  • Valuable support to Operation
  • Through one dedicated CO link person
  • Prevents OP from performing complex diagnostics
  • Helps OP to gain and keep confidence

15
Conclusion
  • An anticipated challenge
  • Both cultural and technical
  • A successful test-bed for numerous new systems
  • Sped up the elaboration of standard
    infrastructures
  • Consolidation of present controls is crucial
  • In terms of reliability and stability
  • To regain full confidence of Operation