Title: AMS02 Functional Integration Test FIT


1
AMS-02 Functional Integration Test (FIT)
  • P. Nemeth/LM

2
Objective
  • The AMS-02 Functional Integration Test (FIT) is a
    risk-mitigation test designed to exercise the
    avionics and ground segments of the experiment in
    the ISS and STS environments
  • FIT will utilize the PTCS and CITE facilities
    within the SSPF
  • FIT will utilize the AMS-02 front-end avionics
    crates on table-tops (not the entire payload)
  • FIT will integrate the flight segment consisting
    of
  • AMS-02 avionics hardware and ACOP/LFM
  • ISS and STS primary CDH interfaces
  • The integrated flight and ground segments will be
    used to test most communications paths and
    command and data formats in the AMS-02 system
    from end to end (albeit local to KSC)

3
FIT Philosophy
  • FIT testing is broken into two test setups, one
    for STS and one for ISS
  • Both setups will utilize
  • Qualification Unit J-Crate (experiment front-end
    interface for command and data handling)
  • Low fidelity Model AMS Crew Operations Post
    (ACOP)
  • Engineering Unit Power Distribution System (PDS)
  • All testing is to be performed at KSC, no
    requirement for remote data routing (tapes will
    be available post-test for further remote testing
    as desired)

4
STS Data Flow
OIU Orbiter Interface Unit PDI Payload Data
Interleaver PSP Payload Signal Processor POCC
Payload Ops Control Center
  • This segment omitted for test

This segment will be simulated by KSC command
terminals and AMS Ground Support Computers
5
ISS Data Flow
PLMDM- Payload Multiplexer-Demultiplexer APS-
Automated Payload Switch ACOP AMS Crew
Operations Post EHS- Enhanced HOSC Software
This segment will only be simulated with KSC
owned EHS software
6
Pad/STS Interconnect Diagram
7
ISS Interconnect Diagram
8
Status
  • Kick-off TIM at KSC was held February 11, 2004
  • Test presently scheduled for January 2005
  • KSC monitoring potential conflicts with Return to
    Flight Activities
  • CITE funding issue appears resolved for FIT and
    pre-flight
  • PDS EU will be available for January test
    however, will only contain Side A

9
(No Transcript)
10
Action Item Status
  • Rev 1 of FIT Test Plan out for Review
  • STS-916 risk mitigation Orbiter software
    products to be utilized
  • OI-30 Latest Orbiter Flight Software
  • Super-format
  • AMS High Rate data to fit within MPLM window
  • ACOP connections to PTCS (fiber) cables to be
    supplied by KSC (existing)
  • No method for CITE to test Critical Health Data
    for ISS (no S-band pipe)
  • Interconnect diagrams from KSC side (PTCS and
    CITE) in work

11
Action Item Status
  • APS availability being worked
  • MSFC request to include HCOR in test
  • STS commanding will be performed from KSC command
    terminal not AMS GSE
  • Command list to be included included in Test Plan
  • Need to track Collaboration Milestones
  • Test Readiness Review (by telecon) in
    mid-December
  • Telecon planned for July 28th with full team